Difference between revisions of "WAC Notes August 25 2020"

From PREX Wiki
Jump to navigationJump to search
Line 32: Line 32:
  
 
== Issues ==
 
== Issues ==
* Septum trips off a million times during the Day and Swing shifts
+
* Septum trips off a million times during the Day and Swing shifts, maybe related to the hall temperature: https://logbooks.jlab.org/entry/3834792
  
 
== Updates ==
 
== Updates ==

Revision as of 23:34, 26 August 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes August 24 2020 << >> WAC Notes August 26 2020

August 25 2020

Daily Meeting BlueJeans

Production Run List - Slug 203 - IHWP IN - Flip-RIGHT - Production

  • Good - Run 7980
  • Good - Run 7981
  • Good - Run 7983 -- septum trips off 3 times during this run
  • Good - Run 7993
  • NeedCut - Run 7994 -- even after cutting out 110k-115k entries, the shift in bpm12X is still larger than 1mm, need further offline analysis

Non-Production Runs and Bad Runs

  • Junk - Run 7982 -- a short run (8 mins, with only ~2k good patterns)

Issues

Updates