Difference between revisions of "WAC Notes August 28 2020"
From PREX Wiki
Jump to navigationJump to search (→Issues) |
(→Issues) |
||
Line 34: | Line 34: | ||
== Issues == | == Issues == | ||
− | * Bleed through of C beam into A, resulting in high Compton background rate | + | * Bleed through of C beam into A, resulting in high Compton background rate: https://cebaf.jlab.org/dtm/open-events?event_id=7512 |
== Updates == | == Updates == | ||
[[Category:WAC]] | [[Category:WAC]] |
Revision as of 10:04, 29 August 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes August 27 2020 << >> WAC Notes August 29 2020
August 28 2020
Daily Meeting BlueJeans
Production Run List - Slug 205 - IHWP IN - Flip-RIGHT - Production
- Good - Run 8045
- NeedCut - Run 8046 -- RQ1 trips during this run, take ~5 minutes to recycle, cut out single arm entries; also cut out bpm12X excursion entryies
- Good - Run 8047
- Good - Run 8048
Non-Production Runs and Bad Runs
- Junk - Run 8043 -- C-Hole
- Junk - Run 8044 -- C-Hole
- Junk - Run 8049 -- no beam, RQ1 trips again, and does not come back
- Junk - run 8050-5068 -- machine is down due to CHL ioc problem, and RQ1 power supply problem
Issues
- Bleed through of C beam into A, resulting in high Compton background rate: https://cebaf.jlab.org/dtm/open-events?event_id=7512