Difference between revisions of "WAC Notes September 5 2020"

From PREX Wiki
Jump to navigationJump to search
Line 37: Line 37:
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==
8231-8237 linac down
+
* 8231-8237 linac down
 
* Bad - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8247_000 Run 8247] 0 beam current
 
* Bad - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8247_000 Run 8247] 0 beam current
8248-8254  
+
* 8248-8254 more downtime
  
 
== Issues ==
 
== Issues ==

Revision as of 10:00, 6 September 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes September 4 2020 << >> WAC Notes September 6 2020

September 5 2020

Daily Meeting BlueJeans

Production Run List - Slug 213 - IHWP OUT - Flip-RIGHT - Production

Production Run List - Slug 214 - IHWP IN - Flip-RIGHT - Production

Production Run List - Slug 213 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

  • 8231-8237 linac down
  • Bad - Run 8247 0 beam current
  • 8248-8254 more downtime

Issues

the accelerator went down after the moller measurement

Updates