== Optics and Q2 ==
 
== Optics and Q2 ==
# <font color="red">Energy Measurement </font> (Doug) (non-invasive)
+
# <font color="blue">Energy Measurement </font> (Doug) (non-invasive)
#* <font color="red"> Priority High </font>
 
 
#* I think this is complete.  I need to check with Doug.
 
#* I think this is complete.  I need to check with Doug.
 
# <font color="blue"> Q2 measurement</font>  
 
# <font color="blue"> Q2 measurement</font>  

Revision as of 20:43, 11 September 2020


CREX Main << August 2020 CREX Run Plan


WORK IN PROGRESS

  1. Please don't worry if there is a needless test on here, or an important one missing, or bad prioritization.
  2. Lets fix it

Optics and Q2

  1. Energy Measurement (Doug) (non-invasive)
    • I think this is complete. I need to check with Doug.
  2. Q2 measurement
    • Repeat of Q2 measurement, with improved pedestal noise control.
    • Detector counting mode.
    • S0 trigger
    • production raster and beam position

Backgrounds

  1. Blinded Quartz
    • Longish access to setup and back out, but short data taking period (production conditions).
    • Reconfigure AT detectors to use blinding cap, attach to US PMTs.
    • This will be done during the long beam studies break on Monday
    • Integrating measurement for asymmetry measurement
    • Counting mode measurement for rate?
    • Can we make a plan for yield measurement? Maybe use absolute table top gain measurements?
  2. Rescattering measurement (~1 shift)
    • Needs a detailed run plan
    • measure to low dp~15%. Integrating mode? May require bootstrap on detector gain?
    • should scale all spectrometer magnets (including septum)
    • Once the elastic peak is out of the focal plane, it may be possible turn on the S3 and S0 scintillator. This should be done when possible, and the T1/T2/T3 trigger rate recorded for each run.
  3. Pole tip re-scattering
    • Requires investigation or planning - do we have an idea here?
    • Q2 or septum mis-tune, to increase interception on pole tip and improve poletip rescattering estimate

Detectors

  1. Linearity Studies (PITA + current scans)
    • These are ongoing - should continue regularly. ~ 1 hour every 3 days.
    • Current scans for detector and BCM pedestals
  2. Linearity LED tests
    • This will be studied post run, during SAD

Other

  1. Sign check
    • perform at next Moller polarimeter measurement
    • run Moller, Compton, and parity DAQ for quick PITA scan
  2. Target/Raster study


Moller polarimetry

  1. One more measurement

Compton polarimetry

  1. Flip DOCP???
  2. No-target runs
  3. Laser polarization optimization
  4. Laser polarization flip
  5. linearity studies