Difference between revisions of "20180313-Radiation-Mtg"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
Ciprian Gal (talk | contribs) |
||
Line 1: | Line 1: | ||
Back to [[Main_Page|Main Page]] >> [[Radiation_Mtg]] | Back to [[Main_Page|Main Page]] >> [[Radiation_Mtg]] | ||
− | [[20180220-Radiation-Mtg|previous meeting]] << >> [[ | + | [[20180220-Radiation-Mtg|previous meeting]] << >> [[20180320-Radiation-Mtg|following meeting]] |
Latest revision as of 11:23, 19 March 2018
Back to Main Page >> Radiation_Mtg
previous meeting << >> following meeting
Logistic information
https://bluejeans.com/6767060495 BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 PARTICIPANT CODE: https://bluejeans.com/190761523
Agenda / Minutes
- FLUKA sim: Victoria
- VO: slides will be ready in a few days
- VO: added geometry for septum (vacuum enclosures, copper coils and flange at the end of the beam pipe). KP: we should carefully check the dimensions.
- VO: ran crex and we get faster cooling and starts off with lower radiation levels compared to prex.
- VO: the DS septum end is 1 order of magnitude cooler compared to side of the collimator. KP: we should try to implement the B field in the pipe.
Attendance
Kent P, Victoria O, David A, Ciprian G