Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchRich Holmes (talk | contribs) |
|||
Line 5: | Line 5: | ||
as the situation on the ground changes. | as the situation on the ground changes. | ||
<p> | <p> | ||
− | Last update: <font color="blue">Mar | + | Last update: <font color="blue">Mar 19, 2010</font>. |
<hr> | <hr> | ||
Line 12: | Line 12: | ||
</caption> | </caption> | ||
<tr> <th> Date (2010) </th><th> Shift </th><th>---------- Activity ----------</th><th>-- Responsible --</th><th>--- Status ---</th></tr> | <tr> <th> Date (2010) </th><th> Shift </th><th>---------- Activity ----------</th><th>-- Responsible --</th><th>--- Status ---</th></tr> | ||
− | <tr> <td> 03/ | + | <tr> <td> 03/19 </td><td> day </td> |
− | <tr> <td> 03/ | + | <td> pump down; Møller, Compton, septum install; Q2 repair<br /> |
− | <tr> <td> 03/ | + | Insert sieve. </td> |
− | <tr> <td> 03/ | + | <td> Techs </td><td>in progress</td></tr> |
+ | <tr> <td> 03/19 </td><td> swing </td><td> Beam restore</td><td> B-team </td> <td> not done</td></tr> | ||
+ | <tr> <td> 03/20 </td><td> owl </td> | ||
+ | <td> <font color="red">Septum checkout</font> | ||
+ | also:<br /> | ||
+ | Initial look at low current cavity monitors<br /> | ||
+ | Target alignment<br /> | ||
+ | VDC checkout<br /> | ||
+ | Quartz detectors checkout<br /> | ||
+ | GEM checkout<br /> | ||
+ | ---- | ||
+ | All at 1-2 µA. | ||
+ | </td> | ||
+ | <td> <font color="red">Michaels, LeRose</font> | ||
+ | <br /> | ||
+ | Michaels<br /> | ||
+ | Michaels<br /> | ||
+ | McNulty, Camsonne, Michaels<br /> | ||
+ | McNulty, Decowski, Wexler<br /> | ||
+ | Hansen, Camsonne, Liyanage<br /> | ||
+ | ---- | ||
+ | <br /> | ||
+ | </td><td>not done</td> </tr> | ||
+ | <tr> <td> 03/20 </td><td> day </td> | ||
+ | <td> Møller, Compton install<br /> | ||
+ | Remove sieve</td> | ||
+ | <td> Techs </td><td>not done</td></tr> | ||
+ | <tr> <td> 03/20 </td><td> swing </td> | ||
+ | <td> <font color="red">Low current cavity monitors setup</font> | ||
+ | <font color="red">Spectrometer checkout</font> <br /> | ||
+ | VDC checkout<br /> | ||
+ | Quartz detectors checkout<br /> | ||
+ | GEM checkout<br /> | ||
+ | ---- | ||
+ | All at <~ 100 nA. </td> | ||
+ | <td> | ||
+ | <font color="red">Musson</font><br /><br /> | ||
+ | McNulty, Camsonne, Michaels<br /> | ||
+ | McNulty, Decowski, Wexler<br /> | ||
+ | Hansen, Camsonne, Liyanage<br /> | ||
+ | ---- | ||
+ | <br /></td><td>not done</td> </tr> | ||
</table> | </table> |
Revision as of 12:29, 19 March 2010
Daily Run Plan
Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Last update: Mar 19, 2010.
Date (2010) | Shift | ---------- Activity ---------- | -- Responsible -- | --- Status --- |
---|---|---|---|---|
03/19 | day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. |
Techs | in progress |
03/19 | swing | Beam restore | B-team | not done |
03/20 | owl | Septum checkout
also: All at 1-2 µA. |
Michaels, LeRose
| not done |
03/20 | day | Møller, Compton install Remove sieve |
Techs | not done |
03/20 | swing | Low current cavity monitors setup
Spectrometer checkout All at <~ 100 nA. |
Musson | not done |