Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
(→‎Daily Run Plan: Swing-owl 3/20)
Line 4: Line 4:
 
a crew of experts is available for the shift.  This schedule will be updated frequently by the Run Coordinator
 
a crew of experts is available for the shift.  This schedule will be updated frequently by the Run Coordinator
 
as the situation on the ground changes.   
 
as the situation on the ground changes.   
<p>
 
Last update: <font color="blue">Mar 19, 2010</font>.
 
 
<hr>
 
<hr>
  
<table border="1">
+
{| border="1"
<caption> Daily Run Plan for PREX &nbsp; (latest at bottom)
+
|+ Daily Run Plan for PREX &nbsp; (latest at bottom)
</caption>
+
! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!---&nbsp;Status&nbsp;---
<tr> <th> Date (2010) </th><th> Shift </th><th>---------- Activity (Responsible) ----------</th><th>---&nbsp;Status&nbsp;---</th></tr>
+
|-
<tr> <td> 03/19 </td><td> day </td>
+
| 03/19
<td> pump down; Møller, Compton, septum install; Q2 repair<br />
+
| day
Insert sieve. (Techs) </td><td></td></tr>
+
| pump down; Møller, Compton, septum install; Q2 repair<br />
<tr> <td> 03/19 </td><td> swing </td><td> Beam restore (B-team) </td> <td> not done</td></tr>
+
Insert sieve. (Techs)
<tr> <td> 03/20 </td><td> owl </td>
+
|
<td> <font color="red">Septum checkout (Michaels: Page when beam imminent & spectrometer ready)</font>  
+
|-
also:<br />
+
| 03/19  
Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready)<br />
+
| swing  
Target alignment (Michaels)<br />
+
| Beam restore (B-team)  
VDC checkout (Michaels)<br />
+
| done
Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)<br />
+
|-
GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)<br />
+
| 03/20  
 +
| owl  
 +
|
 +
* <font color="red">Septum checkout (Michaels: Page when beam imminent & spectrometer ready)</font>  
 +
also:
 +
* Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready)
 +
* Target alignment (Michaels)
 +
* VDC checkout (Michaels)
 +
* Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)
 +
* GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)
 
----
 
----
 
All at 1-2 µA.<br />
 
All at 1-2 µA.<br />
 
Scattered energy ~ beam energy = 1.063 GeV.<br />
 
Scattered energy ~ beam energy = 1.063 GeV.<br />
Quad settings: <br />
+
Quad settings:  
Right arm:<br />
+
*Right arm:
Q1: dI/dP= 411.2474 Amps/GeV/c<br />
+
** Q1: dI/dP= 411.2474 Amps/GeV/c
Q2: dI/dP= 436.2014 Amps/GeV/c<br />
+
** Q2: dI/dP= 436.2014 Amps/GeV/c
Q3: dI/dP= 433.3897 Amps/GeV/c<br />
+
** Q3: dI/dP= 433.3897 Amps/GeV/c
 
+
* Left Arm:
Left Arm:<br />
+
** Q1: dI/dP= 419.8772 Amps/GeV/c
Q1: dI/dP= 419.8772 Amps/GeV/c<br />
+
** Q2: dI/dP= 435.6273 Amps/GeV/c
Q2: dI/dP= 435.6273 Amps/GeV/c<br />
+
** Q3: dI/dP= 434.9682 Amps/GeV/c
Q3: dI/dP= 434.9682 Amps/GeV/c<br />
+
"Usual" polarity
</td>
+
| done
<td>not done</td> </tr>
+
|-
<tr> <td> 03/20 </td><td> day </td>
+
| 03/20  
<td> Beam off & hall open 9:00 am<br />
+
| day
Quads repair; Compton install<br />
+
| Beam off & hall open 9:00 am<br />
Remove sieve (Techs) </td><td>not done</td></tr>
+
Quads repair; Compton install. Leave sieves in. (Techs)  
<tr> <td> 03/20 </td><td> swing </td>
+
| done
<td> <font color="red">Low current cavity monitors setup (Musson)</font>
+
|-
<font color="red">Spectrometer checkout</font> <br />
+
| 03/20
VDC checkout<br />
+
| swing
Quartz detectors checkout<br />
+
|
GEM checkout<br />
+
* Close up hall
Lumi checkout<br />
+
* Benesch tuning (1/2 - 2 hours)
 +
* Verify quad polarities (Camsonne)
 +
* Cavity monitors basic function test (Michaels, Zafar)
 +
* <font color="red">Low current cavity monitors setup (Musson, Zafar)</font> (2 hours)
 +
* Remove sieves
 +
* <font color="red">Spectrometer checkout:</font>
 +
** Quartz detectors checkout
 +
** GEM checkout
 +
** Lumi checkout (Mercado) (2 µA on Ta)
 
----
 
----
All at <~ 100 nA. </td>
+
At <~ 100 nA up to few µA.
<td>not done</td> </tr>
+
| not done
</table>
+
|}

Revision as of 17:42, 20 March 2010

Daily Run Plan

Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.


Daily Run Plan for PREX   (latest at bottom)
Date (2010) Shift ---------- Activity (Responsible) ---------- --- Status ---
03/19 day pump down; Møller, Compton, septum install; Q2 repair

Insert sieve. (Techs)

03/19 swing Beam restore (B-team) done
03/20 owl
  • Septum checkout (Michaels: Page when beam imminent & spectrometer ready)

also:

  • Initial look at low current cavity monitors (Zafar: Page when beam imminent & spectrometer ready)
  • Target alignment (Michaels)
  • VDC checkout (Michaels)
  • Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)
  • GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)

All at 1-2 µA.
Scattered energy ~ beam energy = 1.063 GeV.
Quad settings:

  • Right arm:
    • Q1: dI/dP= 411.2474 Amps/GeV/c
    • Q2: dI/dP= 436.2014 Amps/GeV/c
    • Q3: dI/dP= 433.3897 Amps/GeV/c
  • Left Arm:
    • Q1: dI/dP= 419.8772 Amps/GeV/c
    • Q2: dI/dP= 435.6273 Amps/GeV/c
    • Q3: dI/dP= 434.9682 Amps/GeV/c

"Usual" polarity

done
03/20 day Beam off & hall open 9:00 am

Quads repair; Compton install. Leave sieves in. (Techs)

done
03/20 swing
  • Close up hall
  • Benesch tuning (1/2 - 2 hours)
  • Verify quad polarities (Camsonne)
  • Cavity monitors basic function test (Michaels, Zafar)
  • Low current cavity monitors setup (Musson, Zafar) (2 hours)
  • Remove sieves
  • Spectrometer checkout:
    • Quartz detectors checkout
    • GEM checkout
    • Lumi checkout (Mercado) (2 µA on Ta)

At <~ 100 nA up to few µA.

not done