Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 11: | Line 11: | ||
|- | |- | ||
| 03/19 | | 03/19 | ||
− | | | + | | Day |
| pump down; Møller, Compton, septum install; Q2 repair<br /> | | pump down; Møller, Compton, septum install; Q2 repair<br /> | ||
Insert sieve. (Techs) | Insert sieve. (Techs) | ||
Line 17: | Line 17: | ||
|- | |- | ||
| 03/19 | | 03/19 | ||
− | | | + | | Swing |
| Beam restore (B-team) | | Beam restore (B-team) | ||
| done | | done | ||
|- | |- | ||
| 03/20 | | 03/20 | ||
− | | | + | | Owl |
| | | | ||
* <font color="red">Septum checkout (Michaels: Page when beam imminent & spectrometer ready)</font> | * <font color="red">Septum checkout (Michaels: Page when beam imminent & spectrometer ready)</font> | ||
Line 47: | Line 47: | ||
|- | |- | ||
| 03/20 | | 03/20 | ||
− | | | + | | Day |
| Beam off & hall open 9:00 am<br /> | | Beam off & hall open 9:00 am<br /> | ||
Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) | Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) | ||
Line 53: | Line 53: | ||
|- | |- | ||
| 03/20 | | 03/20 | ||
− | | | + | | Swing |
| | | | ||
* Close up hall | * Close up hall | ||
Line 63: | Line 63: | ||
|- | |- | ||
| 3/21 | | 3/21 | ||
− | | | + | | Owl |
| | | | ||
* <font color="red">Low current cavity monitors setup (Musson, Zafar)</font> | * <font color="red">Low current cavity monitors setup (Musson, Zafar)</font> | ||
Line 70: | Line 70: | ||
|- | |- | ||
| 3/21 | | 3/21 | ||
− | | | + | | Day |
| | | | ||
* <font color="red">Spectrometer checkout:</font> | * <font color="red">Spectrometer checkout:</font> | ||
Line 87: | Line 87: | ||
|- | |- | ||
| 3/21 | | 3/21 | ||
− | | | + | | Swing |
| | | | ||
* <font color="red">Low current cavity monitors setup (Michaels, Zafar)</font> | * <font color="red">Low current cavity monitors setup (Michaels, Zafar)</font> | ||
Line 96: | Line 96: | ||
|- | |- | ||
| 3/22 | | 3/22 | ||
− | | | + | | Owl |
| | | | ||
* <font color="red">Pointing measurement (Riordan)</font> | * <font color="red">Pointing measurement (Riordan)</font> | ||
Line 106: | Line 106: | ||
|- | |- | ||
| 3/22 | | 3/22 | ||
− | | | + | | Day |
| <font color="red"> | | <font color="red"> | ||
− | * Optics (Liyanage)</font> Sieve out. NB Current limit 2 uA | + | * Optics (Liyanage)</font>Sieve out. NB Current limit 2 uA! |
| | | | ||
|- | |- | ||
| 3/22 | | 3/22 | ||
− | | | + | | Swing |
− | * Optics continued, sieve out. NB Current limit 2 uA | + | | |
− | + | * Optics continued, sieve out. NB Current limit 2 uA! | |
| | | | ||
|- | |- | ||
| 3/23 | | 3/23 | ||
− | | | + | | Owl |
| | | | ||
| | | | ||
|- | |- | ||
| 3/23 | | 3/23 | ||
− | | | + | | Day |
− | | '''Beam studies''' | + | | |
− | + | * Remove water target. | |
+ | * Reconfigure Moller cryo. | ||
+ | * '''Beam studies''' ~ 2pm, study of helicity correlated position differences for | ||
| | | | ||
|} | |} |
Revision as of 19:47, 22 March 2010
Daily Run Plan
Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- |
---|---|---|---|
03/19 | Day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
|
03/19 | Swing | Beam restore (B-team) | done |
03/20 | Owl |
also:
All at 1-2 µA.
"Usual" polarity |
done |
03/20 | Day | Beam off & hall open 9:00 am Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) |
done |
03/20 | Swing |
|
most done but need access to finish |
3/21 | Owl |
|
most done but need access to finish |
3/21 | Day |
|
in progress |
3/21 | Swing |
|
not done |
3/22 | Owl |
|
|
3/22 | Day |
|
|
3/22 | Swing |
|
|
3/23 | Owl | ||
3/23 | Day |
|