* Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen) | * Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen) | ||
* GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating) | * GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating) | ||
+ | | done | ||
---- | ---- | ||
All at 1-2 µA.<br /> | All at 1-2 µA.<br /> | ||
Line 60: | Line 61: | ||
* Cavity monitors basic function test (Zafar) | * Cavity monitors basic function test (Zafar) | ||
* <font color="red">Low current cavity monitors setup (Musson, Zafar)</font> | * <font color="red">Low current cavity monitors setup (Musson, Zafar)</font> | ||
− | | | + | | done |
|- | |- | ||
| 3/21 | | 3/21 | ||
Line 67: | Line 68: | ||
* <font color="red">Low current cavity monitors setup (Musson, Zafar)</font> | * <font color="red">Low current cavity monitors setup (Musson, Zafar)</font> | ||
* Access for GEM installation (Camsonne) | * Access for GEM installation (Camsonne) | ||
− | | | + | | done but GEMs not ready |
|- | |- | ||
| 3/21 | | 3/21 | ||
Line 84: | Line 85: | ||
** Scintillator alignment | ** Scintillator alignment | ||
** LQ2 | ** LQ2 | ||
− | | | + | | done |
|- | |- | ||
| 3/21 | | 3/21 | ||
Line 103: | Line 104: | ||
* If done or unable to continue before 4 am page Luis Mercado to do lumi checks | * If done or unable to continue before 4 am page Luis Mercado to do lumi checks | ||
* After 4 am page Dustin McNulty for detector work | * After 4 am page Dustin McNulty for detector work | ||
− | | | + | |done |
|- | |- | ||
| 3/22 | | 3/22 | ||
Line 109: | Line 110: | ||
| <font color="red"> | | <font color="red"> | ||
* Optics (Liyanage)</font>Sieve OUT. NB Current limit 2 uA! | * Optics (Liyanage)</font>Sieve OUT. NB Current limit 2 uA! | ||
− | | | + | |done |
|- | |- | ||
| 3/22 | | 3/22 | ||
Line 115: | Line 116: | ||
| | | | ||
* Optics continued, sieve IN. NB Current limit 2 uA! (Shift Crew) | * Optics continued, sieve IN. NB Current limit 2 uA! (Shift Crew) | ||
− | | | + | |done |
|- | |- | ||
| 3/23 | | 3/23 | ||
Line 141: | Line 142: | ||
| | | | ||
* Target pumpdown | * Target pumpdown | ||
− | | | + | |done |
|- | |- | ||
| 3/24 | | 3/24 | ||
Line 147: | Line 148: | ||
| | | | ||
* Target cooldown | * Target cooldown | ||
− | | | + | |done |
|- | |- | ||
| 3/24 | | 3/24 | ||
Line 153: | Line 154: | ||
| | | | ||
* Tune high current beam into Hall A | * Tune high current beam into Hall A | ||
− | | | + | |done |
|- | |- | ||
| 3/25 | | 3/25 | ||
Line 160: | Line 161: | ||
* Commission lead target, 50 uA (Bob) | * Commission lead target, 50 uA (Bob) | ||
* Lumis and oversampling tests (KK, Luis, Paul) | * Lumis and oversampling tests (KK, Luis, Paul) | ||
− | | | + | |in progress |
|- | |- | ||
| 3/25 | | 3/25 | ||
Line 185: | Line 186: | ||
| | | | ||
*Moller Checkout | *Moller Checkout | ||
− | | | + | |postponed |
|- | |- | ||
| 3/26 | | 3/26 | ||
| Swing | | Swing | ||
| | | | ||
− | * | + | *High Current on C12 (thick and thin) |
| | | | ||
|- | |- | ||
Line 196: | Line 197: | ||
| Owl | | Owl | ||
| | | | ||
− | * | + | *Finish the commissioning of thick Pb target (Bob, Ahmed) |
− | * | + | * |
| | | | ||
|- | |- | ||
| 3/27 | | 3/27 | ||
| Day | | Day | ||
− | + | *Electronic Commissioning (KK, Luis, Paul et al) | |
| | | | ||
|- | |- | ||
| 3/27 | | 3/27 | ||
| Swing | | Swing | ||
− | + | *Establishing Parity Measurements, IA feedback, beam modulation (Kent, Rupesh) | |
| | | | ||
|- | |- | ||
| 3/28 | | 3/28 | ||
| Owl | | Owl | ||
− | + | *Initial Q<sup>2</sup> measauremetnts on thick Pb (Bob) | |
| | | | ||
|- | |- | ||
| 3/28 | | 3/28 | ||
| Day | | Day | ||
− | + | *High Luminosity Detector Commissioning (Paul, Kent, KK, Luis) | |
| | | | ||
|- | |- | ||
| 3/28 | | 3/28 | ||
| Swing | | Swing | ||
− | + | *Continue High Luminosity Commissioning | |
| | | | ||
|- | |- | ||
| 3/29 | | 3/29 | ||
| Owl | | Owl | ||
− | + | *Mini-production run | |
| | | | ||
|- | |- | ||
| 3/29 | | 3/29 | ||
| Day | | Day | ||
− | + | *Open Hall A to Setup Moller and Compton | |
| | | | ||
|- | |- | ||
| 3/29 | | 3/29 | ||
| Swing | | Swing | ||
− | + | *First Moller Commissioning | |
| | | | ||
|- | |- |
Revision as of 21:48, 26 March 2010
Daily Run Plan
Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- | |
---|---|---|---|---|
03/19 | Day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
||
03/19 | Swing | Beam restore (B-team) | done | |
03/20 | Owl |
also:
|
done
All at 1-2 µA.
"Usual" polarity |
done |
03/20 | Day | Beam off & hall open 9:00 am Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) |
done | |
03/20 | Swing |
|
done | |
3/21 | Owl |
|
done but GEMs not ready | |
3/21 | Day |
|
done | |
3/21 | Swing |
|
done | |
3/22 | Owl |
|
done | |
3/22 | Day |
|
done | |
3/22 | Swing |
|
done | |
3/23 | Owl |
|
||
3/23 | Day |
| ||
3/23 | Swing |
|
done | |
3/24 | Owl |
|
done | |
3/24 | Day |
|
done | |
3/24 | Swing |
|
done | |
3/25 | Owl |
|
in progress | |
3/25 | Day |
|
||
3/25 | Swing |
|
||
3/26 | Owl |
|
||
3/26 | Day |
|
postponed | |
3/26 | Swing |
|
||
3/27 | Owl |
|
||
3/27 | Day
|
|||
3/27 | Swing
|
|||
3/28 | Owl
|
|||
3/28 | Day
|
|||
3/28 | Swing
|
|||
3/29 | Owl
|
|||
3/29 | Day
|
|||
3/29 | Swing
|
|||
3/30 | Owl | |||
3/30 | Day |
|