Difference between revisions of "20180717-Radiation-Mtg"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
|||
Line 12: | Line 12: | ||
== Agenda / Minutes == | == Agenda / Minutes == | ||
# TOSCA sims: Adam | # TOSCA sims: Adam | ||
− | #* | + | #* AZ: should have the fringe fields for both septum and Q1 for P2 and C by the end of the day. |
− | |||
− | |||
# Radiation from SAMs: Cameron (slides [[media:Cameron_Prex_meeting_7-17-2018.pdf|WikiPage]] | [https://prex.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=180 DocDB] | [https://ace.phys.virginia.edu:80/HAPPEX/3522 ELOG]) | # Radiation from SAMs: Cameron (slides [[media:Cameron_Prex_meeting_7-17-2018.pdf|WikiPage]] | [https://prex.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=180 DocDB] | [https://ace.phys.virginia.edu:80/HAPPEX/3522 ELOG]) | ||
− | #* | + | #* CC: rerun the benchmarks enabled to get improved error bars on the ratios |
+ | #* CC: added beveled edge and proper quartz R-length. The differences were small | ||
+ | #* CC: increase of 30% radiation for P2 at the HRS platform. | ||
# Concrete simulations: Adam/Ciprian | # Concrete simulations: Adam/Ciprian | ||
− | #* | + | #* AZ: waiting for simulations to trickle through the farm. |
+ | #* CG: talked to Steve Wood and he will provide me with the material he used for his SHMS simulations. | ||
# SAM Rate simulation: Tao (slides [[media:RadiationMeeting20180717-TaoYe-Slides.pdf|WikiPage]] | DocDB | ELOG) | # SAM Rate simulation: Tao (slides [[media:RadiationMeeting20180717-TaoYe-Slides.pdf|WikiPage]] | DocDB | ELOG) | ||
− | #* | + | #* TY: we do not know the #PEs for the new design so in these simulations I am only looking at rate |
+ | #* CG: Rerun both simulations with a new target position of -110 cm. We want to move the target back to improve FOM. | ||
== Attendance == | == Attendance == | ||
− | + | Victoria O, Tao Y, Cameron C, Adam Z, Ciprian G | |
=== Excused: === | === Excused: === | ||
+ | Kent P, David A |
Latest revision as of 10:31, 17 July 2018
Back to Main Page >> Radiation_Mtg
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 PARTICIPANT CODE: https://bluejeans.com/190761523
Agenda / Minutes
- TOSCA sims: Adam
- AZ: should have the fringe fields for both septum and Q1 for P2 and C by the end of the day.
- Radiation from SAMs: Cameron (slides WikiPage | DocDB | ELOG)
- CC: rerun the benchmarks enabled to get improved error bars on the ratios
- CC: added beveled edge and proper quartz R-length. The differences were small
- CC: increase of 30% radiation for P2 at the HRS platform.
- Concrete simulations: Adam/Ciprian
- AZ: waiting for simulations to trickle through the farm.
- CG: talked to Steve Wood and he will provide me with the material he used for his SHMS simulations.
- SAM Rate simulation: Tao (slides WikiPage | DocDB | ELOG)
- TY: we do not know the #PEs for the new design so in these simulations I am only looking at rate
- CG: Rerun both simulations with a new target position of -110 cm. We want to move the target back to improve FOM.
Attendance
Victoria O, Tao Y, Cameron C, Adam Z, Ciprian G
Excused:
Kent P, David A