Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 226: | Line 226: | ||
*Comparison Study of Optics Tunes (Seamus, Nilanga, Kiad) | *Comparison Study of Optics Tunes (Seamus, Nilanga, Kiad) | ||
*Sometime before Monday, submit the ATLIS plan for Dithering test (Rupesh) | *Sometime before Monday, submit the ATLIS plan for Dithering test (Rupesh) | ||
− | | | + | |done |
|- | |- | ||
| 3/28 | | 3/28 | ||
Line 233: | Line 233: | ||
*Continue Optics if necessary. | *Continue Optics if necessary. | ||
*Continue High Luminosity Commissioning | *Continue High Luminosity Commissioning | ||
− | | | + | |done |
|- | |- | ||
| 3/29 | | 3/29 | ||
Line 240: | Line 240: | ||
*Mini-production run (shift crew) | *Mini-production run (shift crew) | ||
*Stop beam at 07:00 or whenever Ed Folts asks to. | *Stop beam at 07:00 or whenever Ed Folts asks to. | ||
− | | | + | |done |
|- | |- | ||
| 3/29 | | 3/29 | ||
Line 250: | Line 250: | ||
*Detector linearity/LED tests (Luis) | *Detector linearity/LED tests (Luis) | ||
*Setup WAC analysis (Mark, Mindy) | *Setup WAC analysis (Mark, Mindy) | ||
− | | | + | |done |
|- | |- | ||
| 3/29 | | 3/29 | ||
Line 257: | Line 257: | ||
*First Moller Commissioning (Sasha) | *First Moller Commissioning (Sasha) | ||
*Or, if Moller not ready, check Final Alignment of detectors, position A_T (Dustin) | *Or, if Moller not ready, check Final Alignment of detectors, position A_T (Dustin) | ||
− | | | + | |postponed. Moller magnet cooling |
|- | |- | ||
| 3/30 | | 3/30 | ||
| Owl | | Owl | ||
| | | | ||
− | * | + | *More optics/acceptance studies (Seamus, Ahmed, Nilanga) |
− | * | + | *Commission charge feedback (Mark) |
+ | *Current monitor calibration and pedestals determination (Mark) | ||
+ | *Quasi-production on Lead (owl shift crew) | ||
| | | | ||
|- | |- | ||
Line 269: | Line 271: | ||
| Day | | Day | ||
| | | | ||
− | * | + | *Access do work on Moller and Compton. |
− | * | + | *Some GEM installation work. (Alex, Seamus, Kiad, Nilanga) |
+ | *Possible linearity/LED study. (Luis) | ||
| | | | ||
|} | |} |
Revision as of 19:00, 29 March 2010
Daily Run Plan
Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- |
---|---|---|---|
03/19 | Day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
done |
03/19 | Swing | Beam restore (B-team) | done |
03/20 | Owl |
also:
|
done
All at 1-2 µA.
"Usual" polarity |
03/20 | Day | Beam off & hall open 9:00 am Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) |
done |
03/20 | Swing |
|
done |
3/21 | Owl |
|
done but GEMs not ready |
3/21 | Day |
|
done |
3/21 | Swing |
|
done |
3/22 | Owl |
|
done |
3/22 | Day |
|
done |
3/22 | Swing |
|
done |
3/23 | Owl |
|
|
3/23 | Day |
|
water cell removed, rest not finished |
3/23 | Swing |
|
done |
3/24 | Owl |
|
done |
3/24 | Day |
|
done |
3/24 | Swing |
|
done |
3/25 | Owl |
|
in progress |
3/25 | Day |
|
done |
3/25 | Swing |
|
postponed |
3/26 | Owl |
|
in progress |
3/26 | Day |
|
postponed |
3/26 | Swing |
|
partly done |
3/27 | Owl | no beam | |
3/27 | Day | no beam | |
3/27 | Swing |
|
done, high-current tests continue |
3/28 | Owl |
|
no finished |
3/28 | Day |
|
done |
3/28 | Swing |
|
done |
3/29 | Owl |
|
done |
3/29 | Day |
|
done |
3/29 | Swing |
|
postponed. Moller magnet cooling |
3/30 | Owl |
|
|
3/30 | Day |
|
|