Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 257: | Line 257: | ||
*Moller magnet cooldown | *Moller magnet cooldown | ||
*Optics and acceptance studies (Seamus, Ahmed, Nilanga) | *Optics and acceptance studies (Seamus, Ahmed, Nilanga) | ||
− | | | + | |done |
|- | |- | ||
| 3/30 | | 3/30 | ||
Line 264: | Line 264: | ||
*Commission charge feedback (Mark) | *Commission charge feedback (Mark) | ||
*Current monitor calibration and pedestals determination (Mark) | *Current monitor calibration and pedestals determination (Mark) | ||
− | *Quasi-production on | + | *Quasi-production on Empty Target (owl shift crew) |
− | | | + | |done |
|- | |- | ||
| 3/30 | | 3/30 | ||
Line 274: | Line 274: | ||
*Possible linearity/LED study. (Luis) | *Possible linearity/LED study. (Luis) | ||
| | | | ||
+ | |- | ||
+ | 3/30 | ||
+ | | Swing | ||
+ | | | ||
+ | *First Commissioning of Moller | ||
+ | | | ||
+ | |- | ||
+ | 3/31 | ||
+ | | Owl | ||
+ | | | ||
+ | |- | ||
+ | *Beam Studies of Helicity Correlations | ||
+ | *Q<sup>2</sup> Measurements | ||
+ | | | ||
+ | |- | ||
+ | | 3/31 | ||
+ | | Day | ||
+ | | | ||
+ | *Beam Tuning (Jay Benesch) | ||
+ | | | ||
+ | |- | ||
+ | | 3/31 | ||
+ | | Swing | ||
+ | | | ||
+ | * | ||
+ | | | ||
+ | |- | ||
+ | | 4/1 | ||
+ | | Owl | ||
+ | | | ||
+ | * | ||
+ | | | ||
+ | |- | ||
+ | |||
+ | |||
|} | |} |
Revision as of 09:22, 30 March 2010
Daily Run Plan
Here are details of the daily run plan. See also the global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
3/30 3/31
- Beam Studies of Helicity Correlations
- Q2 Measurements
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- |
---|---|---|---|
03/19 | Day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
done |
03/19 | Swing | Beam restore (B-team) | done |
03/20 | Owl |
also:
|
done
All at 1-2 µA.
"Usual" polarity |
03/20 | Day | Beam off & hall open 9:00 am Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) |
done |
03/20 | Swing |
|
done |
3/21 | Owl |
|
done but GEMs not ready |
3/21 | Day |
|
done |
3/21 | Swing |
|
done |
3/22 | Owl |
|
done |
3/22 | Day |
|
done |
3/22 | Swing |
|
done |
3/23 | Owl |
|
|
3/23 | Day |
|
water cell removed, rest not finished |
3/23 | Swing |
|
done |
3/24 | Owl |
|
done |
3/24 | Day |
|
done |
3/24 | Swing |
|
done |
3/25 | Owl |
|
in progress |
3/25 | Day |
|
done |
3/25 | Swing |
|
postponed |
3/26 | Owl |
|
in progress |
3/26 | Day |
|
postponed |
3/26 | Swing |
|
partly done |
3/27 | Owl | no beam | |
3/27 | Day | no beam | |
3/27 | Swing |
|
done, high-current tests continue |
3/28 | Owl |
|
no finished |
3/28 | Day |
|
done |
3/28 | Swing |
|
done |
3/29 | Owl |
|
done |
3/29 | Day |
|
done |
3/29 | Swing |
|
done |
3/30 | Owl |
|
done |
3/30 | Day |
|
|
Swing |
|
||
Owl | |||
3/31 | Day |
|
|
3/31 | Swing |
|
|
4/1 | Owl |
|