Difference between revisions of "PREX/CREX Sep 25, 2018 10:00am"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) (Created page with "Back to Main Page >> PREX/CREX_Teleconferences previous meeting << >> PREX/CREX_Oct_2,_2018_10:00am|following meetin...") |
Ciprian Gal (talk | contribs) |
||
Line 12: | Line 12: | ||
== Agenda == | == Agenda == | ||
− | # | + | #ELOG: |
− | #* | + | #* AZ: swapping the elog computer after the meeting. Should be back soon after the meeting. |
+ | # SAM design | ||
+ | #* YT: the stress on the SAMs with COMSOL is very small compared to the breaking point. DM: this looks solid, we are just making sure that the simulation takes everything into account. SR: intuitively I can see how the simulation may have problems producing an unstable solution. | ||
+ | #* BM: can they be easily damaged during install? DM: no plan to touch the sides and plan to be very careful. SR: we plan to have one of these to test and procedure or installation tool. | ||
+ | |||
== Present == | == Present == | ||
− | + | Cameron C, Bob M, Sanghwa P, Paul K, Seamus R, Ciprian G, Eric K, Kent P, Adam Z, Amali P, Jinlong Z, Victoria O, Devi A, Dustin M, Chandan G, Silviu D, Rich H, Ryan R, Tao Y, David A, Guido U, Paul S, Ye T, KK, Juliette M, | |
===Excused=== | ===Excused=== | ||
− | + | Dave G | |
[[Category:Meetings]] | [[Category:Meetings]] | ||
[[Category:Prex Weekly Meeting]] | [[Category:Prex Weekly Meeting]] |
Latest revision as of 10:23, 25 September 2018
Back to Main Page >> PREX/CREX_Teleconferences
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 555 144 462 Bluejeans link: https://bluejeans.com/555144462 Offline room: CEBAF Center F324-325
Agenda
- ELOG:
- AZ: swapping the elog computer after the meeting. Should be back soon after the meeting.
- SAM design
- YT: the stress on the SAMs with COMSOL is very small compared to the breaking point. DM: this looks solid, we are just making sure that the simulation takes everything into account. SR: intuitively I can see how the simulation may have problems producing an unstable solution.
- BM: can they be easily damaged during install? DM: no plan to touch the sides and plan to be very careful. SR: we plan to have one of these to test and procedure or installation tool.
Present
Cameron C, Bob M, Sanghwa P, Paul K, Seamus R, Ciprian G, Eric K, Kent P, Adam Z, Amali P, Jinlong Z, Victoria O, Devi A, Dustin M, Chandan G, Silviu D, Rich H, Ryan R, Tao Y, David A, Guido U, Paul S, Ye T, KK, Juliette M,
Excused
Dave G