Difference between revisions of "PREX/CREX Nov 6, 2018 10:00am"

From PREX Wiki
Jump to navigationJump to search
Line 15: Line 15:
 
#* Registration [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-PREXCREX-NOV2018 link] (Please register if you haven't yet)
 
#* Registration [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-PREXCREX-NOV2018 link] (Please register if you haven't yet)
 
# analyzer/DAQ update (Bob/Ye/Cameron)
 
# analyzer/DAQ update (Bob/Ye/Cameron)
 +
#* Corrected a non-standard wiring of BPMB and corrected some mapping issues in the Pan Control.db
 +
#* Japan can make plots of the Counting House DAQ in standalone mode
 +
#* ET deadtime testing is coming along, Carl Timmer suggests using the Java monitorGui to watch event flow-through
 
# main detector pmt linearity update: Devi [https://ace.phys.virginia.edu:80/HAPPEX/3563 ELOG Entry 3563]
 
# main detector pmt linearity update: Devi [https://ace.phys.virginia.edu:80/HAPPEX/3563 ELOG Entry 3563]
# new SAM insertion tube length spec: Dustin [https://ace.phys.virginia.edu:80/HAPPEX/3564 ELOG Entry 3564]
+
# new SAM insertion tube length spec: Dustin [https://ace.phys.virginia.edu:80/HAPPEX/3564 ELOG Entry 3564], Cameron (corrected a 2.2 cm sign error) [https://ace.phys.virginia.edu:80/HAPPEX/3562 ELOG Entry 3562]
 +
#* comments
 +
# SEE BPM noise issues: Cameron [https://ace.phys.virginia.edu:80/HAPPEX/3566 ELOG Entry 3566], [https://ace.phys.virginia.edu:80/HAPPEX/3565 Tom Powers' references in Entry 3565]
 
#* comments
 
#* comments
  

Revision as of 02:42, 6 November 2018

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  555 144 462
 Bluejeans link: https://bluejeans.com/555144462
 Offline room:   CEBAF Center F324-325

Minutes

  1. Upcoming November 11-12 collaboration meeting
    • Registration link (Please register if you haven't yet)
  2. analyzer/DAQ update (Bob/Ye/Cameron)
    • Corrected a non-standard wiring of BPMB and corrected some mapping issues in the Pan Control.db
    • Japan can make plots of the Counting House DAQ in standalone mode
    • ET deadtime testing is coming along, Carl Timmer suggests using the Java monitorGui to watch event flow-through
  3. main detector pmt linearity update: Devi ELOG Entry 3563
  4. new SAM insertion tube length spec: Dustin ELOG Entry 3564, Cameron (corrected a 2.2 cm sign error) ELOG Entry 3562
    • comments
  5. SEE BPM noise issues: Cameron ELOG Entry 3566, Tom Powers' references in Entry 3565
    • comments

Present

Excused