Difference between revisions of "DAQ Testing/20181106"
From PREX Wiki
Jump to navigationJump to searchLine 10: | Line 10: | ||
== Goals == | == Goals == | ||
* Update Injector DAQ Timing Diagrams (see all in [[DAQ_Layouts#Injector_Timing_Diagram|DAQ Layouts]]) | * Update Injector DAQ Timing Diagrams (see all in [[DAQ_Layouts#Injector_Timing_Diagram|DAQ Layouts]]) | ||
− | ** TI (External standalone mode input) | + | ** TI (External gated standalone mode input) |
− | ** TI CRL outputs (overall busy out, vqwk wait, vqwk read) | + | ** TI CRL outputs (overall busy out, vqwk wait, vqwk read, vqwk clear) |
** QWeak ADCs gate | ** QWeak ADCs gate | ||
+ | ** SIS3801 Scaler | ||
+ | ** STR7200 Scaler (needs spare) | ||
+ | ** FLEXIO Scaler | ||
== Tests == | == Tests == | ||
+ | TI ext standalone trigger mode (not receiving Trigger Supervisor trigger signal) | ||
+ | * Channel 0 is a twisted pair, takes Tstable and triggers the entire DAQ based off of this | ||
+ | ** Tsettle's falling edge is chosen as the t=0 reference point for all diagrams (since it indicates the beginning of a new Helicity window) | ||
+ | *** 500 us wide in standard running mode (currently used by Hall B runnning) | ||
+ | ** Tstable is the complement of Tsettle and it's falling edge indicates when it is safe to begin integrating HEL dependent data | ||
+ | *** 500 us after Tsettle (as expected) | ||
+ | * [[:media:Timing-Injector-TIR-ext.PNG|Timing Diagram, Injector, TIR ext mode]] | ||
== Results == | == Results == |
Revision as of 13:20, 7 November 2018
Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes
Previous Day of Testing << >> Next Day of Testing
November 6th, 2018 Testers: Bob, Cameron
Goals
- Update Injector DAQ Timing Diagrams (see all in DAQ Layouts)
- TI (External gated standalone mode input)
- TI CRL outputs (overall busy out, vqwk wait, vqwk read, vqwk clear)
- QWeak ADCs gate
- SIS3801 Scaler
- STR7200 Scaler (needs spare)
- FLEXIO Scaler
Tests
TI ext standalone trigger mode (not receiving Trigger Supervisor trigger signal)
- Channel 0 is a twisted pair, takes Tstable and triggers the entire DAQ based off of this
- Tsettle's falling edge is chosen as the t=0 reference point for all diagrams (since it indicates the beginning of a new Helicity window)
- 500 us wide in standard running mode (currently used by Hall B runnning)
- Tstable is the complement of Tsettle and it's falling edge indicates when it is safe to begin integrating HEL dependent data
- 500 us after Tsettle (as expected)
- Tsettle's falling edge is chosen as the t=0 reference point for all diagrams (since it indicates the beginning of a new Helicity window)
- Timing Diagram, Injector, TIR ext mode