Difference between revisions of "Weekly Meeting Discussion Topics"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) (Created page with "==List of discussion topics== * Scheduling for PQB time at the end of APEX (CG?!) ''every 6 weeks'' (Starts on 27th Nov) * Injector setup and feedback (Caryn, Amali) ''every...") |
Kent Paschke (talk | contribs) |
||
Line 11: | Line 11: | ||
* Compton polarimeter (Adam, CG) ''every 4 weeks'' (Starts on 18th Dec) | * Compton polarimeter (Adam, CG) ''every 4 weeks'' (Starts on 18th Dec) | ||
* Moller polarimeter (Eric, Sanghwa) ''every 4 weeks'' (Starts on 11th Dec) | * Moller polarimeter (Eric, Sanghwa) ''every 4 weeks'' (Starts on 11th Dec) | ||
+ | * GEM detectors (Seamus) "every 4 weeks" (Starts on 4th Dec) | ||
+ | * Data Acquisition (Bob) "every 4 weeks" (Starts on 11th Dec?) | ||
+ | * Cavity Beam Monitors (Ye) "every 6 weeks" (Starts in January?) | ||
+ | * Integrating Beam Monitors (CG?) (Start in January?) |
Revision as of 04:24, 20 November 2018
List of discussion topics
- Scheduling for PQB time at the end of APEX (CG?!) every 6 weeks (Starts on 27th Nov)
- Injector setup and feedback (Caryn, Amali) every 5 weeks (Starts on 4th Dec)
- Ion chamber positions (CG) every 6 weeks (Starts on 11th Dec)
- Beamline checkout (Ye, Bob) every 4 weeks (Starts on 27th Nov)
- Beam modulation (Victoria, Ye) every 4 weeks (Starts on 4th Dec)
- Tracking and optics (Chandan, Seamus) every 4 weeks (Starts on 11th Dec)
- Integrating detectors (Dustin) every 6 weeks (Starts on 18th Dec)
- Analyzer (Paul) every 4 weeks (Starts on 18th Dec)
- Compton polarimeter (Adam, CG) every 4 weeks (Starts on 18th Dec)
- Moller polarimeter (Eric, Sanghwa) every 4 weeks (Starts on 11th Dec)
- GEM detectors (Seamus) "every 4 weeks" (Starts on 4th Dec)
- Data Acquisition (Bob) "every 4 weeks" (Starts on 11th Dec?)
- Cavity Beam Monitors (Ye) "every 6 weeks" (Starts in January?)
- Integrating Beam Monitors (CG?) (Start in January?)