Difference between revisions of "Weekly Meeting Discussion Topics"

From PREX Wiki
Jump to navigationJump to search
Line 1: Line 1:
= List of Topics =
+
Back to [[PREX/CREX_Teleconferences]]
 +
 
 +
= List of discussion topics =
  
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
 
|+
 
|+
! width=33% class="unsortable"|<b>Task</b> || class="unsortable"|<b>Responsible</b> || width=40% class="unsortable"|<b>Status </b> ||  <b>Last update</b> || class="unsortable"|<b>Link</b>
+
! class="unsortable"|<b>Task</b> || class="unsortable"|<b>Responsible</b> || width=40% class="unsortable"|<b>Status </b> ||  class="unsortable"|<b>Update</b> || <b>Last update</b> || class="unsortable"|<b>Link</b>
 
|-
 
|-
|Scheduling for PQB time at the end of APEX || CG || - || 11/27/2018 || -
+
|Scheduling for PQB time at the end of APEX || CG || - || every 6 weeks || 11/27/2018 || -
 
|-
 
|-
|Beamline checkout || Ye, Bob || - || - || -
+
|Beamline checkout || Ye, Bob || - || every 4 weeks || - || -
 
|-
 
|-
|Injector setup and feedback || Caryn, Amali || - || - || -
+
|Injector setup and feedback || Caryn, Amali || - || every 5 weeks || - || -
 
|-
 
|-
|Beam modulation || Victoria, Ye || - || - || -
+
|Beam modulation || Victoria, Ye || - || every 4 weeks || - || -
 
|-
 
|-
|GEM detectors || Seamus || - || - || -
+
|GEM detectors || Seamus || - || every 4 weeks || - || -
 
|-
 
|-
|Ion chamber positions || CG || - || - || -
+
|Ion chamber positions || CG || - || every 6 weeks || - || -
 
|-
 
|-
|Moller polarimeter || Eric, Sanghwa || - || - || -
+
|Moller polarimeter || Eric, Sanghwa || - || every 4 weeks || - || -
 
|-
 
|-
|Data Acquisition || Bob || - || - || -  
+
|Data Acquisition || Bob || - || every 4 weeks || - || -  
 
|-
 
|-
|Tracking and optics || Chandan, Seamus || - || - || -
+
|Tracking and optics || Chandan, Seamus || - || every 4 weeks || - || -
 
|-
 
|-
|Integrating detectors || Dustin || - || - || -
+
|Integrating detectors || Dustin || - || every 6 weeks || - || -
 
|-
 
|-
|Analyzer || Paul || - || - || -  
+
|Analyzer || Paul || - || every 4 weeks || - || -  
 
|-
 
|-
|Compton polarimeter || Adam, CG || - || - || -
+
|Compton polarimeter || Adam, CG || - || every 4 weeks || - || -
 
|-
 
|-
|Cavity Beam Monitors || Ye || - || - || -
+
|Cavity Beam Monitors || Ye || - || every 6 weeks || - || -
 
|-
 
|-
 
|Integrating Beam Monitors || CG? || - || - || -
 
|Integrating Beam Monitors || CG? || - || - || -

Revision as of 10:20, 27 November 2018

Back to PREX/CREX_Teleconferences

List of discussion topics

Task Responsible Status Update Last update Link
Scheduling for PQB time at the end of APEX CG - every 6 weeks 11/27/2018 -
Beamline checkout Ye, Bob - every 4 weeks - -
Injector setup and feedback Caryn, Amali - every 5 weeks - -
Beam modulation Victoria, Ye - every 4 weeks - -
GEM detectors Seamus - every 4 weeks - -
Ion chamber positions CG - every 6 weeks - -
Moller polarimeter Eric, Sanghwa - every 4 weeks - -
Data Acquisition Bob - every 4 weeks - -
Tracking and optics Chandan, Seamus - every 4 weeks - -
Integrating detectors Dustin - every 6 weeks - -
Analyzer Paul - every 4 weeks - -
Compton polarimeter Adam, CG - every 4 weeks - -
Cavity Beam Monitors Ye - every 6 weeks - -
Integrating Beam Monitors CG? - - -


List of discussion topics

  • Scheduling for PQB time at the end of APEX (CG?!) every 6 weeks (Starts on 27th Nov)
  • Beamline checkout (Ye, Bob) every 4 weeks (Starts on 27th Nov)
  • Injector setup and feedback (Caryn, Amali) every 5 weeks (Starts on 4th Dec)
  • Beam modulation (Victoria, Ye) every 4 weeks (Starts on 4th Dec)
  • GEM detectors (Seamus) "every 4 weeks" (Starts on 4th Dec)
  • Ion chamber positions (CG) every 6 weeks (Starts on 11th Dec)
  • Moller polarimeter (Eric, Sanghwa) every 4 weeks (Starts on 11th Dec)
  • Data Acquisition (Bob) "every 4 weeks" (Starts on 11th Dec?)
  • Tracking and optics (Chandan, Seamus) every 4 weeks (Starts on 11th Dec)
  • Integrating detectors (Dustin) every 6 weeks (Starts on 18th Dec)
  • Analyzer (Paul) every 4 weeks (Starts on 18th Dec)
  • Compton polarimeter (Adam, CG) every 4 weeks (Starts on 18th Dec)
  • Cavity Beam Monitors (Ye) "every 6 weeks" (Starts in January?)
  • Integrating Beam Monitors (CG?) (Start in January?)