Difference between revisions of "Weekly Meeting Discussion Topics"

From PREX Wiki
Jump to navigationJump to search
Line 7: Line 7:
 
! class="unsortable"|<b>Task</b> || class="unsortable"|<b>Responsible</b> || width=40% class="unsortable"|<b>Status </b> ||  class="unsortable"|<b>Update</b> || <b>Next update</b> || class="unsortable"|<b>Link to updates</b>
 
! class="unsortable"|<b>Task</b> || class="unsortable"|<b>Responsible</b> || width=40% class="unsortable"|<b>Status </b> ||  class="unsortable"|<b>Update</b> || <b>Next update</b> || class="unsortable"|<b>Link to updates</b>
 
|-
 
|-
|Scheduling for PQB time at the end of APEX || CG || - || every 6 weeks || 01/08/2019 || [[PREX/CREX_Nov_27,_2018_10:00am|Nov 27 2018]]
+
|Scheduling for PQB time at the end of APEX || CG || list of tasks is crystalized || every 6 weeks || 01/08/2019 || [[PREX/CREX_Nov_27,_2018_10:00am|Nov 27 2018]]
 
|-
 
|-
 
|Injector setup and feedback || Caryn, Amali || - || every 5 weeks || 12/18/2018 || -
 
|Injector setup and feedback || Caryn, Amali || - || every 5 weeks || 12/18/2018 || -
 
|-
 
|-
|Beam modulation || Victoria, Ye || - || every 4 weeks || 01/08/2019 || [[PREX/CREX_Dec_4,_2018_10:00am|Dec 4 2018]]
+
|Beam modulation || Victoria, Ye || started work, task list ready || every 4 weeks || 01/08/2019 || [[PREX/CREX_Dec_4,_2018_10:00am|Dec 4 2018]]
 
|-
 
|-
|Design status || Kent || - || every 4 weeks || 01/15/2019 || [[PREX/CREX_Dec_4,_2018_10:00am|Dec 4 2018]]
+
|Design status || Kent || everything on track, deadline for everything to be ready March 11th || every 4 weeks || 01/15/2019 || [[PREX/CREX_Dec_4,_2018_10:00am|Dec 4 2018]]
 
|-
 
|-
 
|GEM detectors || Dustin, Seamus || - || every 4 weeks || 12/11/2018 || -
 
|GEM detectors || Dustin, Seamus || - || every 4 weeks || 12/11/2018 || -
Line 31: Line 31:
 
|Compton polarimeter || Adam, Amali, CG || - || every 4 weeks || 12/18/2018 || -
 
|Compton polarimeter || Adam, Amali, CG || - || every 4 weeks || 12/18/2018 || -
 
|-
 
|-
|Cavity Beam Monitors || Ye || - || every 6 weeks || 01/08/2019 || [[PREX/CREX_Nov_27,_2018_10:00am|Nov 27 2018]]
+
|Cavity Beam Monitors || Ye || limited test done using epics readout, working DAC still pending || every 6 weeks || 01/08/2019 || [[PREX/CREX_Nov_27,_2018_10:00am|Nov 27 2018]]
 
|-
 
|-
 
|Integrating Beam Monitors || CG || - || - || 01/08/2019 || -
 
|Integrating Beam Monitors || CG || - || - || 01/08/2019 || -
 
|}
 
|}

Revision as of 13:04, 4 December 2018

Back to PREX/CREX_Teleconferences

List of discussion topics

Task Responsible Status Update Next update Link to updates
Scheduling for PQB time at the end of APEX CG list of tasks is crystalized every 6 weeks 01/08/2019 Nov 27 2018
Injector setup and feedback Caryn, Amali - every 5 weeks 12/18/2018 -
Beam modulation Victoria, Ye started work, task list ready every 4 weeks 01/08/2019 Dec 4 2018
Design status Kent everything on track, deadline for everything to be ready March 11th every 4 weeks 01/15/2019 Dec 4 2018
GEM detectors Dustin, Seamus - every 4 weeks 12/11/2018 -
Ion chamber positions CG - every 6 weeks 12/11/2018 -
Moller polarimeter Eric, Sanghwa, Don - every 4 weeks 12/11/2018 -
Data Acquisition Bob - every 4 weeks 12/11/2018 -
Tracking and optics Chandan, Seamus - every 4 weeks 12/11/2018 -
Integrating detectors Dustin - every 6 weeks 12/18/2018 -
Analyzer Paul - every 4 weeks 12/18/2018 -
Compton polarimeter Adam, Amali, CG - every 4 weeks 12/18/2018 -
Cavity Beam Monitors Ye limited test done using epics readout, working DAC still pending every 6 weeks 01/08/2019 Nov 27 2018
Integrating Beam Monitors CG - - 01/08/2019 -