Difference between revisions of "20181212-Analyzer-Mtg"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...")
 
 
Line 14: Line 14:
 
== Agenda ==
 
== Agenda ==
 
# online plots
 
# online plots
#*  
+
#* CG: slow progress
 
# regression analysis
 
# regression analysis
#*  
+
#* PK: will pick up the regression analysis after pull requests
 
# et_bridge and deadtime
 
# et_bridge and deadtime
#*  
+
#* no update
 
# DAQ issues
 
# DAQ issues
#*  
+
#* CG: we should test the pan decoding and feedback code with the new bank structure in the next few days.
 
# VQWK adcs
 
# VQWK adcs
#*  
+
#* BM: Chris Cuevas still has some questions about the board and has gotten some information from PK. PK: will check with him to make sure everything is ok with the information.
 
# Other issues
 
# Other issues
#*  
+
#* PK: checking pull requests and will have them merged soon
 +
#* PK: will push in the helicity decoding in the CH crate
  
 
== Present ==
 
== Present ==
 
+
Ciprian G, Paul K, Bob M, Robert R,
 
===Excused===
 
===Excused===
 +
Cameron C, Kent P, Wouter D
  
 
[[Category:Meetings]]
 
[[Category:Meetings]]
 
[[Category:Analyzer_Meeting]]
 
[[Category:Analyzer_Meeting]]

Latest revision as of 10:15, 12 December 2018

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  684 884 269
 Bluejeans link: https://bluejeans.com/684884269

github repository: JAPAN

Agenda

  1. online plots
    • CG: slow progress
  2. regression analysis
    • PK: will pick up the regression analysis after pull requests
  3. et_bridge and deadtime
    • no update
  4. DAQ issues
    • CG: we should test the pan decoding and feedback code with the new bank structure in the next few days.
  5. VQWK adcs
    • BM: Chris Cuevas still has some questions about the board and has gotten some information from PK. PK: will check with him to make sure everything is ok with the information.
  6. Other issues
    • PK: checking pull requests and will have them merged soon
    • PK: will push in the helicity decoding in the CH crate

Present

Ciprian G, Paul K, Bob M, Robert R,

Excused

Cameron C, Kent P, Wouter D