Difference between revisions of "Weekly Meeting Discussion Topics"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
Ciprian Gal (talk | contribs) |
||
Line 19: | Line 19: | ||
|Ion chamber positions || CG || task should be simple. will iterate through simulation || every 6 weeks || 02/04/2018 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] | |Ion chamber positions || CG || task should be simple. will iterate through simulation || every 6 weeks || 02/04/2018 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] | ||
|- | |- | ||
− | |Moller polarimeter || Eric, Sanghwa, Don || | + | |Moller polarimeter || Eric, Sanghwa, Don || comparisons are improving. Bfield inclusion is finished || every 4 weeks || 01/15/2018 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] |
|- | |- | ||
|Data Acquisition || Bob || DAQ upgraded to bank readout. system on track || every 4 weeks || 01/22/2018 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] | |Data Acquisition || Bob || DAQ upgraded to bank readout. system on track || every 4 weeks || 01/22/2018 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] |
Revision as of 15:08, 7 January 2019
Back to PREX/CREX_Teleconferences
List of discussion topics
Task | Responsible | Status | Update | Next update | Link to updates |
---|---|---|---|---|---|
Scheduling for PQB time at the end of APEX | CG | list of tasks is crystalized | every 6 weeks | 01/08/2019 | Nov 27 2018 |
Injector setup and feedback | Caryn, Amali | All set for Jan install of RTP | every 5 weeks | 01/15/2019 | Dec 11 2018 |
Beam modulation | Victoria, Ye | started work, task list ready | every 4 weeks | 01/08/2019 | Dec 4 2018 |
Design status | Kent | everything on track, deadline for everything to be ready March 11th | every 4 weeks | 01/15/2019 | Dec 4 2018 |
GEM detectors | Dustin, Seamus | resources at the lab IDed, | every 4 weeks | 01/22/2019 | Dec 18 2018 |
Ion chamber positions | CG | task should be simple. will iterate through simulation | every 6 weeks | 02/04/2018 | Dec 11 2018 |
Moller polarimeter | Eric, Sanghwa, Don | comparisons are improving. Bfield inclusion is finished | every 4 weeks | 01/15/2018 | Dec 11 2018 |
Data Acquisition | Bob | DAQ upgraded to bank readout. system on track | every 4 weeks | 01/22/2018 | Dec 11 2018 |
Tracking and optics | Chandan, Seamus | tracking code needs to be written | every 4 weeks | 01/22/2018 | Dec 18 2018 |
Integrating detectors | Dustin | - | every 6 weeks | 12/18/2018 | - |
Analyzer | Paul | several projects being worked on in parallel | every 4 weeks | 01/29/2019 | Dec 18 2018 |
Compton polarimeter | Adam, Amali, CG | opened vacuum and replaced mirrors. will try locking | every 4 weeks | 01/15/2019 | Dec 18 2018 |
Cavity Beam Monitors | Ye | limited test done using epics readout, working DAC still pending | every 6 weeks | 01/08/2019 | Nov 27 2018 |
Integrating Beam Monitors | CG | - | - | 01/08/2019 | - |