Jump to navigationJump to searchCiprian Gal (talk | contribs) (Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...") |
Ciprian Gal (talk | contribs) |
||
Line 23: | Line 23: | ||
# Other issues | # Other issues | ||
#* | #* | ||
+ | |||
+ | == Bob's DAQ tasklist == | ||
+ | TO-DO list for Parity DAQ | ||
+ | updated Jan 4, 2019 | ||
+ | |||
+ | Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13 | ||
+ | Tao & Cameron: 8, 9 | ||
+ | Bob: 3, 6, 10 | ||
+ | Cip, Cameron, Tao: 13 | ||
+ | 1 Timing: mostly understood, still small mysteries (LNE) | ||
+ | 2 Synchronization-check system. w/help from Ed Jastrzembski | ||
+ | 3 File naming, reset run num, finalize configs (INJ, CH, ALL) | ||
+ | 4 Fix scalers on spectrometer crates. | ||
+ | 5 clean up cabling, labels, fasteners. | ||
+ | 6 Clean up CRL -- eliminate so-called "dirty trick" | ||
+ | 7 Check the 7200 scaler setup at injector, find a spare 7200. | ||
+ | 8 Pedestal studies, aka cross-talk. | ||
+ | 9 Test JAPAN. Need cable map & labels. Possibly maintain "pan" ? | ||
+ | 10 Green Monster maintenance. | ||
+ | 11 Test spares. Repair bad modules. | ||
+ | 12 Document everything. Circuit diagrams, cable map, "how to". | ||
+ | 13 Online software, a bit undefined since software is changing. | ||
+ | (a) automatic production of run-dependent database | ||
+ | (b) alarms like end-of-run voice (Bob) | ||
+ | (c) feedback | ||
+ | (d) coil-pulsing aka modulation aka dithering (Victoria) | ||
+ | (e) panguin (GUI showing real-time plots) | ||
+ | (f) prompt analysis | ||
+ | (g) e-logbook entries | ||
+ | (h) archiving EPICs data | ||
+ | Accomplished | ||
+ | * Revive all crates. | ||
+ | * Deploy all ADCs needed and test each channel. | ||
+ | * Build various DAQ configs with subsets of the DAQ crates. | ||
+ | * Timing diagram, check timing of external signals and readout. | ||
+ | * ET system upgrade, test rate limits, ensure deadtime zero. | ||
+ | * Implement Bank structure. | ||
== Present == | == Present == |
Revision as of 20:08, 15 January 2019
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
github repository: JAPAN
Agenda
- online plots pullRequest
- regression analysis
- DAQ issues
- VQWK adcs
- Other issues
Bob's DAQ tasklist
TO-DO list for Parity DAQ updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13 Tao & Cameron: 8, 9 Bob: 3, 6, 10 Cip, Cameron, Tao: 13 1 Timing: mostly understood, still small mysteries (LNE) 2 Synchronization-check system. w/help from Ed Jastrzembski 3 File naming, reset run num, finalize configs (INJ, CH, ALL) 4 Fix scalers on spectrometer crates. 5 clean up cabling, labels, fasteners. 6 Clean up CRL -- eliminate so-called "dirty trick" 7 Check the 7200 scaler setup at injector, find a spare 7200. 8 Pedestal studies, aka cross-talk. 9 Test JAPAN. Need cable map & labels. Possibly maintain "pan" ? 10 Green Monster maintenance. 11 Test spares. Repair bad modules. 12 Document everything. Circuit diagrams, cable map, "how to". 13 Online software, a bit undefined since software is changing. (a) automatic production of run-dependent database (b) alarms like end-of-run voice (Bob) (c) feedback (d) coil-pulsing aka modulation aka dithering (Victoria) (e) panguin (GUI showing real-time plots) (f) prompt analysis (g) e-logbook entries (h) archiving EPICs data Accomplished * Revive all crates. * Deploy all ADCs needed and test each channel. * Build various DAQ configs with subsets of the DAQ crates. * Timing diagram, check timing of external signals and readout. * ET system upgrade, test rate limits, ensure deadtime zero. * Implement Bank structure.