Difference between revisions of "GEM Meeting/20190111"
From PREX Wiki
Jump to navigationJump to searchChandabindu (talk | contribs) |
Chandabindu (talk | contribs) |
||
Line 13: | Line 13: | ||
==Minutes== | ==Minutes== | ||
− | + | # Chandan: There was sparing issue in one of the GEM detector -not holding voltage ~1000 V. That was due to bad resistor in the voltage divider. Tht resistor is replaced and now operating at 3.9 kV. | |
+ | # Chandan: One 4 Slot backplane was bad - was not allowing to detect all four APV cards. That backplane is replaced. We need to modify the old four-slot backplanes. | ||
+ | # Dustin: We should setup an elog for the test setup. Probably Cameron can set up the elog. | ||
== Present == | == Present == |
Latest revision as of 01:11, 18 January 2019
Back to Main Page >> GEM_Meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 998 903 0149 Bluejeans link: https://bluejeans.com/9989030149
Agenda
Minutes
- Chandan: There was sparing issue in one of the GEM detector -not holding voltage ~1000 V. That was due to bad resistor in the voltage divider. Tht resistor is replaced and now operating at 3.9 kV.
- Chandan: One 4 Slot backplane was bad - was not allowing to detect all four APV cards. That backplane is replaced. We need to modify the old four-slot backplanes.
- Dustin: We should setup an elog for the test setup. Probably Cameron can set up the elog.
Present
Dustin, Devi, Bryan, Joey, Tao, Cameron, Chandan
Excused
Seamus