Difference between revisions of "DAQ Testing/20190118"
From PREX Wiki
Jump to navigationJump to searchLine 16: | Line 16: | ||
* Run 1033 - Battery (1.6 V) plugged into RHRS first ADC, channel 7 (index 7, 8th channel) - 5300 events at 30 Hz flip rate, 500 us Tsettle time (scalers and synch monitor are now invalid - were set for 240 Hz and 160 us Tsettle timing) | * Run 1033 - Battery (1.6 V) plugged into RHRS first ADC, channel 7 (index 7, 8th channel) - 5300 events at 30 Hz flip rate, 500 us Tsettle time (scalers and synch monitor are now invalid - were set for 240 Hz and 160 us Tsettle timing) | ||
* Run 1034 - Battery (1.6 V) plugged into RHRS second ADC, channel 4 - 5300 events (I may have accidentally moved lumi signal in channel 1 to 2, either way, its in 2 now) | * Run 1034 - Battery (1.6 V) plugged into RHRS second ADC, channel 4 - 5300 events (I may have accidentally moved lumi signal in channel 1 to 2, either way, its in 2 now) | ||
− | * Run 1035 - Battery (1.6 V) plugged into LHRS only ADC, channel 7 - | + | * Run 1035 - Battery (1.6 V) plugged into LHRS only ADC, channel 7 - 36000 events |
Revision as of 16:28, 18 January 2019
Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes
Previous Day of Testing << >> Next Day of Testing
January 15th, 2019 Testers: Cameron Clarke, Tao Ye, Bob
Goals
- Do pedestal studies with a battery on the HRSs
Pedestal Testing
Using batteries to look for pedestal noise floor, drift, or helicity correlated pickup
- Run 1032 - failed
- Run 1033 - Battery (1.6 V) plugged into RHRS first ADC, channel 7 (index 7, 8th channel) - 5300 events at 30 Hz flip rate, 500 us Tsettle time (scalers and synch monitor are now invalid - were set for 240 Hz and 160 us Tsettle timing)
- Run 1034 - Battery (1.6 V) plugged into RHRS second ADC, channel 4 - 5300 events (I may have accidentally moved lumi signal in channel 1 to 2, either way, its in 2 now)
- Run 1035 - Battery (1.6 V) plugged into LHRS only ADC, channel 7 - 36000 events