Difference between revisions of "DAQ Testing/20190205"
From PREX Wiki
Jump to navigationJump to searchLine 9: | Line 9: | ||
* Restore Helicity Control Board in CH crate | * Restore Helicity Control Board in CH crate | ||
+ | * Set up a second V2F module in the CH (from the 3rd spare in injector crate) | ||
* Send vqwk gate to HRSs (replace HEL signal with this CH HapTB GMN2 signal) | * Send vqwk gate to HRSs (replace HEL signal with this CH HapTB GMN2 signal) | ||
* Take pedestal noise floor calibration runs for updated SAM cabling configuration | * Take pedestal noise floor calibration runs for updated SAM cabling configuration |
Revision as of 13:36, 5 February 2019
Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes
Previous Day of Testing << >> Next Day of Testing
February 5th, 2019 Testers: Cameron Clarke, Devi Adhikari, Ye Tian, Victoria Owen, Paul King
Goals
- Restore Helicity Control Board in CH crate
- Set up a second V2F module in the CH (from the 3rd spare in injector crate)
- Send vqwk gate to HRSs (replace HEL signal with this CH HapTB GMN2 signal)
- Take pedestal noise floor calibration runs for updated SAM cabling configuration
- Test BMW functionality with BSY connected to proper gate signal in CH NIM modules