Difference between revisions of "20190206-Analyzer-Mtg"
From PREX Wiki
Jump to navigationJump to searchKent Paschke (talk | contribs) (→Agenda) |
|||
Line 27: | Line 27: | ||
# DAQ tasklist: | # DAQ tasklist: | ||
#* | #* | ||
+ | # PREX Collab Meeting talks | ||
# Other issues | # Other issues | ||
#* Item | #* Item | ||
#** comment | #** comment | ||
− | |||
== Bob's DAQ tasklist == | == Bob's DAQ tasklist == |
Latest revision as of 14:42, 6 February 2019
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
- online plots
- regression analysis
- feedback
- DAQ issues
- VQWK adcs
- Pull requests:
- DAQ tasklist:
- PREX Collab Meeting talks
- Other issues
- Item
- comment
- Item
Bob's DAQ tasklist
TO-DO list for Parity DAQ updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13 Tao & Cameron: 8, 9 Bob: 3, 6, 10 Cip, Cameron, Tao: 13 1 Timing: mostly understood, still small mysteries (LNE) 2 Synchronization-check system. w/help from Ed Jastrzembski 3 File naming, reset run num, finalize configs (INJ, CH, ALL) 4 Fix scalers on spectrometer crates. 5 clean up cabling, labels, fasteners. 6 Clean up CRL -- eliminate so-called "dirty trick" 7 Check the 7200 scaler setup at injector, find a spare 7200. 8 Pedestal studies, aka cross-talk. 9 Test JAPAN. Need cable map & labels. Possibly maintain "pan" ? 10 Green Monster maintenance. 11 Test spares. Repair bad modules. 12 Document everything. Circuit diagrams, cable map, "how to". 13 Online software, a bit undefined since software is changing. (a) automatic production of run-dependent database (b) alarms like end-of-run voice (Bob) (c) feedback (d) coil-pulsing aka modulation aka dithering (Victoria) (e) panguin (GUI showing real-time plots) (f) prompt analysis (g) e-logbook entries (h) archiving EPICs data Accomplished * Revive all crates. * Deploy all ADCs needed and test each channel. * Build various DAQ configs with subsets of the DAQ crates. * Timing diagram, check timing of external signals and readout. * ET system upgrade, test rate limits, ensure deadtime zero. * Implement Bank structure.