Difference between revisions of "20190410-Analyzer-Mtg"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) (Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...") |
Ciprian Gal (talk | contribs) |
||
Line 15: | Line 15: | ||
#respin of APEX runs: [https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist] | #respin of APEX runs: [https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist] | ||
#* What output do we have? | #* What output do we have? | ||
+ | #** TY: high current with SAMs on have been respun for 50 and 40 uA runs. | ||
+ | #** TY: right now we look at the noise for BPMs and SAMs. | ||
+ | #** KP: would you know if all the events are processed? TY: will figure out how to best do that. SR: if the prompt summary exists then it finished. | ||
+ | #** KP: the prompt summary text output should also be investigated. | ||
+ | #** TY: we used the ds3x bcm to normalize the SAMs | ||
+ | #** CG: we should take a look at Caryn's panguin file. TY: will do | ||
#* Agregator? | #* Agregator? | ||
+ | #** CG: SR and CG will take a look at Cameron's code. | ||
#* Pair tree plots? | #* Pair tree plots? | ||
+ | #** TY: working on pair tree plots and post-pan regression with pairs. | ||
#* Do we have a "process a run" analysis chain ready? Do we want to set it up as a script? >> This will develop into the prompt analysis script. | #* Do we have a "process a run" analysis chain ready? Do we want to set it up as a script? >> This will develop into the prompt analysis script. | ||
+ | #** TY: we have a basic script. PK: there are Qweak examples for watching files in the directories that we copied over to adaq. | ||
+ | #** KP: the shift crew should check the basic quality of the data output. | ||
# "Operations" branch | # "Operations" branch | ||
− | #* | + | #* PK: Tao updated files and committed and I pushed them to the repo. |
# regression analysis | # regression analysis | ||
− | #* | + | #* PK: we are pretty close to having a working copy of the data handler. Still on track to have a regression analysis working by the end of April. |
# feedback | # feedback | ||
− | #* | + | #* KP: could feedback hang off the data handler? PK: Amali should have a discussion with Paul, because there should not be that much restructuring to implement feedback. |
# Beam modulation | # Beam modulation | ||
− | #* | + | #* CG: will follow up with Victoria. |
# VQWK adcs | # VQWK adcs | ||
− | #* | + | #* CG: all working. |
# EPICS run-start and fast logger (and EPICS decoder to slow tree) | # EPICS run-start and fast logger (and EPICS decoder to slow tree) | ||
− | #* | + | #* RR: updated both of them (removed the non-working EPICS variables). Organized the fastLogger. |
# bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open. | # bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open. | ||
− | #* | + | #* PK: the bmwClient doesn't get data from CODA. My intention is to add variables to the BMW client that are written at pre-start, end of run, and download. |
# Bob's DAQ tasklist | # Bob's DAQ tasklist | ||
#* Timing: mostly understood, still small mysteries (LNE) | #* Timing: mostly understood, still small mysteries (LNE) | ||
+ | #** PK: we restructured the timing between the injector and CH crates. | ||
#* Synchronization-check system. w/help from Ed Jastrzembski | #* Synchronization-check system. w/help from Ed Jastrzembski | ||
+ | #** Cameron working on. | ||
#* Clean up cabling, labels, fasteners - First need to examine all signals | #* Clean up cabling, labels, fasteners - First need to examine all signals | ||
+ | #** CH crate has a preliminary cleanup and Caryn is doing | ||
#* Clean up CRL -- eliminate so-called "dirty trick" | #* Clean up CRL -- eliminate so-called "dirty trick" | ||
+ | #** ?? | ||
#* Check the 7200 scaler setup at injector, find a spare 7200. | #* Check the 7200 scaler setup at injector, find a spare 7200. | ||
+ | #** Talked to Bob related to timing. Event counters | ||
#* Pedestal studies, aka cross-talk | #* Pedestal studies, aka cross-talk | ||
− | #* Green Monster rework | + | #** Tao will look into it soon. |
+ | #* Green Monster rework: Adam. | ||
+ | #** AZ: having a separate issue from bmw. | ||
#* automatic production of run-dependent database | #* automatic production of run-dependent database | ||
+ | #** Sanghwa is working on this. | ||
#* alarms like end-of-run voice | #* alarms like end-of-run voice | ||
+ | #** later | ||
#* e-logbook entries | #* e-logbook entries | ||
+ | #** later | ||
#* Document everything. Circuit diagrams, cable map, "how to". | #* Document everything. Circuit diagrams, cable map, "how to". | ||
== Present == | == Present == | ||
− | + | Tao Y, Ciprian G, Adam Z, Kent P, Sakib R, Robert R, Devi A | |
===Excused=== | ===Excused=== | ||
[[Category:Meetings]] | [[Category:Meetings]] | ||
[[Category:Analyzer_Meeting]] | [[Category:Analyzer_Meeting]] |
Latest revision as of 13:47, 10 April 2019
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
- respin of APEX runs: runlist
- What output do we have?
- TY: high current with SAMs on have been respun for 50 and 40 uA runs.
- TY: right now we look at the noise for BPMs and SAMs.
- KP: would you know if all the events are processed? TY: will figure out how to best do that. SR: if the prompt summary exists then it finished.
- KP: the prompt summary text output should also be investigated.
- TY: we used the ds3x bcm to normalize the SAMs
- CG: we should take a look at Caryn's panguin file. TY: will do
- Agregator?
- CG: SR and CG will take a look at Cameron's code.
- Pair tree plots?
- TY: working on pair tree plots and post-pan regression with pairs.
- Do we have a "process a run" analysis chain ready? Do we want to set it up as a script? >> This will develop into the prompt analysis script.
- TY: we have a basic script. PK: there are Qweak examples for watching files in the directories that we copied over to adaq.
- KP: the shift crew should check the basic quality of the data output.
- What output do we have?
- "Operations" branch
- PK: Tao updated files and committed and I pushed them to the repo.
- regression analysis
- PK: we are pretty close to having a working copy of the data handler. Still on track to have a regression analysis working by the end of April.
- feedback
- KP: could feedback hang off the data handler? PK: Amali should have a discussion with Paul, because there should not be that much restructuring to implement feedback.
- Beam modulation
- CG: will follow up with Victoria.
- VQWK adcs
- CG: all working.
- EPICS run-start and fast logger (and EPICS decoder to slow tree)
- RR: updated both of them (removed the non-working EPICS variables). Organized the fastLogger.
- bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open.
- PK: the bmwClient doesn't get data from CODA. My intention is to add variables to the BMW client that are written at pre-start, end of run, and download.
- Bob's DAQ tasklist
- Timing: mostly understood, still small mysteries (LNE)
- PK: we restructured the timing between the injector and CH crates.
- Synchronization-check system. w/help from Ed Jastrzembski
- Cameron working on.
- Clean up cabling, labels, fasteners - First need to examine all signals
- CH crate has a preliminary cleanup and Caryn is doing
- Clean up CRL -- eliminate so-called "dirty trick"
- ??
- Check the 7200 scaler setup at injector, find a spare 7200.
- Talked to Bob related to timing. Event counters
- Pedestal studies, aka cross-talk
- Tao will look into it soon.
- Green Monster rework: Adam.
- AZ: having a separate issue from bmw.
- automatic production of run-dependent database
- Sanghwa is working on this.
- alarms like end-of-run voice
- later
- e-logbook entries
- later
- Document everything. Circuit diagrams, cable map, "how to".
- Timing: mostly understood, still small mysteries (LNE)
Present
Tao Y, Ciprian G, Adam Z, Kent P, Sakib R, Robert R, Devi A