=== Analyzer code updates === | === Analyzer code updates === | ||
# Recent branch activity & pull requests | # Recent branch activity & pull requests | ||
− | #* | + | #* PK: Tao's pull request for a different saturation level was merged. WD also had a pull to allow the data directory to be specified at the command line. |
+ | #* PK: two outstanding pull requests: a) Cameron's ellipticity calculation (almost ready). b) change to ET buffer. This needs to be tested before wrt performance. | ||
# regression analysis | # regression analysis | ||
− | #* | + | #* RR: japan seemed to be using the DeviceErrorFlag only (by comparing output fits to the regression output). This is being changed and at the same time we'll continue to compare a different run. |
# feedback | # feedback | ||
− | #* | + | #* CG: Amali just needs to implement the IA and helMag feedback. |
+ | #* PK: there is some strange lag at startup. Suspect we still have some hooks for old variables; will investigate. CG: will talk to Amali about it | ||
# Beam modulation | # Beam modulation | ||
#* Updates to the bmwClient | #* Updates to the bmwClient | ||
− | #** | + | #** PK: will follow up later |
#* Decoding and BMOD tree extraction | #* Decoding and BMOD tree extraction | ||
− | #** | + | #** PK: will follow up later |
− | + | # Others: | |
+ | #* PK: we should clean up the rest of the branches. | ||
+ | #* PK: will put together a list of questionable issues. | ||
=== Hardware/DAQ tasklist === | === Hardware/DAQ tasklist === | ||
# List of spares: | # List of spares: | ||
− | #* | + | #* CC: 5 VQWKs (+2 in test stands); 2 FLEXIOs (we already have one in each crate -- tested). 5 HAPPEX timing boards (+5 more installed + 2 more in test crates). 4 spare VXworks ROCs. |
+ | #* CG: spare 7200? CC: found and tested (also in CH cabinite). PK: belongs to hall C and is generally used for Moller in Hall C. | ||
# EPICS run-start and fast logger (and EPICS decoder to slow tree) | # EPICS run-start and fast logger (and EPICS decoder to slow tree) | ||
− | #* | + | #* SP: we added the script to the msql DB and it seems to work now. There were some problems initially but not clear what solved them. |
+ | #* SP: the end of Run it runs a "end clean" and it kills all of these processes. The fastLogger gets cleaned properly. This should be included in the kcoda. PK: at least the fastLogger is included there. | ||
+ | #* CG: will compile list | ||
# Timing: mostly understood, still small mysteries (LNE) | # Timing: mostly understood, still small mysteries (LNE) | ||
− | #* | + | #* PK: to do tune beam scan we need to change how the VQWKs work (to make them work with the timing boards) |
+ | #* CC: installed but needs to be checked out. PK: until then we won't touch the gating. We'll work on it early next week. | ||
# Synchronization-check system. w/help from Ed Jastrzembski | # Synchronization-check system. w/help from Ed Jastrzembski | ||
− | #* | + | #* CC: haven't talked to him recently. Fiber cables will come in soon. Will check with him today. |
+ | #* PK: how about the old style? CC: plugged into injector but running into firmware with the scaler. PK: will look at it soon. | ||
# Clean up cabling, labels, fasteners - First need to examine all signals | # Clean up cabling, labels, fasteners - First need to examine all signals | ||
#* CC: in progress. Labeling will be done once timing system is fixed. | #* CC: in progress. Labeling will be done once timing system is fixed. | ||
# Clean up CRL -- eliminate so-called "dirty trick" | # Clean up CRL -- eliminate so-called "dirty trick" | ||
− | #* | + | #* CC: that is Bob’s court. PK: we should look at the CH and injector CRLs once we finish up with the timing and beamMod client. |
− | |||
− | |||
# Pedestal studies, aka cross-talk | # Pedestal studies, aka cross-talk | ||
− | #* | + | #* CC: KK talked to a group of us about pickup and we made a plan on how to intentionally putting in pickup noise and measure it and removing it to ppb levels. |
+ | #* CC: will write it down in a log entries. | ||
# Green Monster rework: Adam. | # Green Monster rework: Adam. | ||
− | #* | + | #* AZ: made some progress. Will try to put it online. |
# automatic production of run-dependent database | # automatic production of run-dependent database | ||
− | #* | + | #* CG: still waiting on the computing center |
# alarms like end-of-run voice | # alarms like end-of-run voice | ||
#* later | #* later | ||
# e-logbook entries | # e-logbook entries | ||
#* later | #* later | ||
+ | # Hall C BCM signal | ||
+ | #* CC: plugged into scalar and checked that the cable is ok. Using BCM1 and 2. | ||
# Document everything. Circuit diagrams, cable map, "how to". | # Document everything. Circuit diagrams, cable map, "how to". | ||
− | #* | + | #* CC: will make circuit diagrams. |
+ | # Talk to Brad about the system monitoring (HDD, CPU usage) | ||
+ | #* CG: will do that. | ||
+ | # Remote power supply cycling capability: | ||
+ | #* CC: will follow up with Alex C and Bob M. | ||
+ | |||
=== ReSpin of APEX runs === | === ReSpin of APEX runs === | ||
[https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist] | [https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist] | ||
#* What output do we have? | #* What output do we have? | ||
− | #** | + | #** CC: 30 uA runs. HAPLOG entry 3755. CC: looked at the data and the 30 uA show similar issues with the 40/50 uA runs. |
+ | #** TY: will add respin scripts to the rootScripts folder. | ||
+ | #** SR: will add aggregator script the rootScripts folder. | ||
+ | #** CC: might be interesting to do a 2D residual plot from a Normal distribution. | ||
+ | #** CC: might be useful to have fixed scales for the 2D correlation plots. | ||
#* standard plots | #* standard plots | ||
− | #** | + | #** TY: working on the new plots. |
# "Operations" branch | # "Operations" branch | ||
− | #* | + | #* being updated. |
== Present == | == Present == | ||
− | Sanghwa P, Cameron C, Tao Y, Paul K, Ciprian G, Devi A | + | Sanghwa P, Cameron C, Tao Y, Paul K, Ciprian G, Devi A, Sakib R, Robert R, Wouter D |
+ | |||
===Excused=== | ===Excused=== | ||
+ | Kent P, | ||
[[Category:Meetings]] | [[Category:Meetings]] | ||
[[Category:Analyzer_Meeting]] | [[Category:Analyzer_Meeting]] |
Latest revision as of 13:56, 8 May 2019
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
Analyzer code updates
- Recent branch activity & pull requests
- PK: Tao's pull request for a different saturation level was merged. WD also had a pull to allow the data directory to be specified at the command line.
- PK: two outstanding pull requests: a) Cameron's ellipticity calculation (almost ready). b) change to ET buffer. This needs to be tested before wrt performance.
- regression analysis
- RR: japan seemed to be using the DeviceErrorFlag only (by comparing output fits to the regression output). This is being changed and at the same time we'll continue to compare a different run.
- feedback
- CG: Amali just needs to implement the IA and helMag feedback.
- PK: there is some strange lag at startup. Suspect we still have some hooks for old variables; will investigate. CG: will talk to Amali about it
- Beam modulation
- Updates to the bmwClient
- PK: will follow up later
- Decoding and BMOD tree extraction
- PK: will follow up later
- Updates to the bmwClient
- Others:
- PK: we should clean up the rest of the branches.
- PK: will put together a list of questionable issues.
Hardware/DAQ tasklist
- List of spares:
- CC: 5 VQWKs (+2 in test stands); 2 FLEXIOs (we already have one in each crate -- tested). 5 HAPPEX timing boards (+5 more installed + 2 more in test crates). 4 spare VXworks ROCs.
- CG: spare 7200? CC: found and tested (also in CH cabinite). PK: belongs to hall C and is generally used for Moller in Hall C.
- EPICS run-start and fast logger (and EPICS decoder to slow tree)
- SP: we added the script to the msql DB and it seems to work now. There were some problems initially but not clear what solved them.
- SP: the end of Run it runs a "end clean" and it kills all of these processes. The fastLogger gets cleaned properly. This should be included in the kcoda. PK: at least the fastLogger is included there.
- CG: will compile list
- Timing: mostly understood, still small mysteries (LNE)
- PK: to do tune beam scan we need to change how the VQWKs work (to make them work with the timing boards)
- CC: installed but needs to be checked out. PK: until then we won't touch the gating. We'll work on it early next week.
- Synchronization-check system. w/help from Ed Jastrzembski
- CC: haven't talked to him recently. Fiber cables will come in soon. Will check with him today.
- PK: how about the old style? CC: plugged into injector but running into firmware with the scaler. PK: will look at it soon.
- Clean up cabling, labels, fasteners - First need to examine all signals
- CC: in progress. Labeling will be done once timing system is fixed.
- Clean up CRL -- eliminate so-called "dirty trick"
- CC: that is Bob’s court. PK: we should look at the CH and injector CRLs once we finish up with the timing and beamMod client.
- Pedestal studies, aka cross-talk
- CC: KK talked to a group of us about pickup and we made a plan on how to intentionally putting in pickup noise and measure it and removing it to ppb levels.
- CC: will write it down in a log entries.
- Green Monster rework: Adam.
- AZ: made some progress. Will try to put it online.
- automatic production of run-dependent database
- CG: still waiting on the computing center
- alarms like end-of-run voice
- later
- e-logbook entries
- later
- Hall C BCM signal
- CC: plugged into scalar and checked that the cable is ok. Using BCM1 and 2.
- Document everything. Circuit diagrams, cable map, "how to".
- CC: will make circuit diagrams.
- Talk to Brad about the system monitoring (HDD, CPU usage)
- CG: will do that.
- Remote power supply cycling capability:
- CC: will follow up with Alex C and Bob M.
ReSpin of APEX runs
- What output do we have?
- CC: 30 uA runs. HAPLOG entry 3755. CC: looked at the data and the 30 uA show similar issues with the 40/50 uA runs.
- TY: will add respin scripts to the rootScripts folder.
- SR: will add aggregator script the rootScripts folder.
- CC: might be interesting to do a 2D residual plot from a Normal distribution.
- CC: might be useful to have fixed scales for the 2D correlation plots.
- standard plots
- TY: working on the new plots.
- What output do we have?
- "Operations" branch
- being updated.
Present
Sanghwa P, Cameron C, Tao Y, Paul K, Ciprian G, Devi A, Sakib R, Robert R, Wouter D
Excused
Kent P,