Line 15: | Line 15: | ||
#* | #* | ||
# Compton polarimeter | # Compton polarimeter | ||
− | #* | + | #* DG: strugling with the birefrigence of the cavity. The cube that we used to measure the polarization in the cavity intoduces some polarization effect. Will install amplifier in the afternoon |
+ | #* JCC: Spare base for PREX and making preparations for CREX | ||
# Moller polarimeter | # Moller polarimeter | ||
− | #* | + | #* New target survey will be done. New copper foil; installed. |
# Beam Modulation | # Beam Modulation | ||
− | #* | + | #* VO: repaired some coil connections and re-measured. Still having problems with hardware. More progress has been made on the instant reply analysis. PK: will followup later today |
# BPM studies | # BPM studies | ||
− | #* | + | #* CP: reproduced real beam problem with generator. Working with lab folks for solution that is least invasive. |
# Integrating DAQ updates | # Integrating DAQ updates | ||
− | #* | + | #* PK: changed the CH crate last week. It needs to be recabled. We will re-check the VQWK modules in the crate. Next is changing the timing for the VQWK boards. We no longer have ADCX18 in the CH. We should think about how to prevent the temp excursions from happening. Other crates could also be affected. |
# Parity analyzer: | # Parity analyzer: | ||
− | #* | + | #* PK: the japan regression is consistent with post-pan. Haplog has been made. |
+ | #* PK: we should gauge if we need mini-runs. | ||
# LQ1 viton seals [https://ace.phys.virginia.edu:80/HAPPEX/3749 haplog3749] | # LQ1 viton seals [https://ace.phys.virginia.edu:80/HAPPEX/3749 haplog3749] | ||
#* CG: Adam finished his analysis and the plan is to install a shield only on the left. | #* CG: Adam finished his analysis and the plan is to install a shield only on the left. | ||
# Injector studies: | # Injector studies: | ||
− | #* | + | #* CP: next week we'll have 3x 8h shifts up to FC1. Will let everyone know. Rotation of cathode, pickup tests, proper voltages and chopper scan, set IAs for the other cells. |
# Detectors: | # Detectors: | ||
− | #* | + | #* DM: both arms frames for the VDCs have been istnalled. R main det assembly installed. Tomorrow Jack will isntall the GEM frames. |
+ | #* ChG: working without GEMs. L is working with MPDs; working on R. hope to finish by this weekend. | ||
+ | # Cross talk work: | ||
+ | #* CP: we are working on it and have a working group setup. The batteries upstairs don't see any pickup. The batteries in the hut see ppm level pickup. | ||
+ | #* KK: we should come up with a setup for a large pickup upstairs to see how it propagates to see how sensitive we are at the CH and HRSes. | ||
# Discussion for next weeks: | # Discussion for next weeks: | ||
− | #* | + | #* RR: will present comparison next week |
== Present == | == Present == | ||
===In F324=== | ===In F324=== | ||
− | + | Paul K, Caryn P, Devi A, Tao Y, Adam Z, Ciprian G, | |
===Online=== | ===Online=== | ||
− | + | Alexandre C, Bob M, Cameron C, Chandan C, Dave G, David A, Dustin M, Eric K, Jinlong Z, Juliette M, KK, Paul S, Ryan R, Seamus R, Silviu D, Rich H, Amali P, Victoria O | |
===Cannot make it=== | ===Cannot make it=== | ||
Revision as of 10:31, 14 May 2019
Back to Main Page >> PREX/CREX_Teleconferences
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 628 981 532 Bluejeans link: https://bluejeans.com/628981532 Offline room: CEBAF Center F324-325
Agenda
- Installation progress: Ciprian docDB363
- Compton polarimeter
- DG: strugling with the birefrigence of the cavity. The cube that we used to measure the polarization in the cavity intoduces some polarization effect. Will install amplifier in the afternoon
- JCC: Spare base for PREX and making preparations for CREX
- Moller polarimeter
- New target survey will be done. New copper foil; installed.
- Beam Modulation
- VO: repaired some coil connections and re-measured. Still having problems with hardware. More progress has been made on the instant reply analysis. PK: will followup later today
- BPM studies
- CP: reproduced real beam problem with generator. Working with lab folks for solution that is least invasive.
- Integrating DAQ updates
- PK: changed the CH crate last week. It needs to be recabled. We will re-check the VQWK modules in the crate. Next is changing the timing for the VQWK boards. We no longer have ADCX18 in the CH. We should think about how to prevent the temp excursions from happening. Other crates could also be affected.
- Parity analyzer:
- PK: the japan regression is consistent with post-pan. Haplog has been made.
- PK: we should gauge if we need mini-runs.
- LQ1 viton seals haplog3749
- CG: Adam finished his analysis and the plan is to install a shield only on the left.
- Injector studies:
- CP: next week we'll have 3x 8h shifts up to FC1. Will let everyone know. Rotation of cathode, pickup tests, proper voltages and chopper scan, set IAs for the other cells.
- Detectors:
- DM: both arms frames for the VDCs have been istnalled. R main det assembly installed. Tomorrow Jack will isntall the GEM frames.
- ChG: working without GEMs. L is working with MPDs; working on R. hope to finish by this weekend.
- Cross talk work:
- CP: we are working on it and have a working group setup. The batteries upstairs don't see any pickup. The batteries in the hut see ppm level pickup.
- KK: we should come up with a setup for a large pickup upstairs to see how it propagates to see how sensitive we are at the CH and HRSes.
- Discussion for next weeks:
- RR: will present comparison next week
Present
In F324
Paul K, Caryn P, Devi A, Tao Y, Adam Z, Ciprian G,
Online
Alexandre C, Bob M, Cameron C, Chandan C, Dave G, David A, Dustin M, Eric K, Jinlong Z, Juliette M, KK, Paul S, Ryan R, Seamus R, Silviu D, Rich H, Amali P, Victoria O