Difference between revisions of "20190529-Analyzer-Mtg"

From PREX Wiki
Jump to navigationJump to search
Line 66: Line 66:
  
 
== Present ==
 
== Present ==
 
+
Paul K., Michael V., Cameron, Tao, Bob M., Devi, Robert R. Sakib
 
===Excused===
 
===Excused===
 
+
Wouter
  
 
[[Category:Meetings]]
 
[[Category:Meetings]]
 
[[Category:Analyzer_Meeting]]
 
[[Category:Analyzer_Meeting]]

Revision as of 13:07, 29 May 2019

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

Analyzer code updates

  1. Recent branch activity & pull requests
  2. burpcuts
    • this is not quite the same as the stability cuts. I have a framework idea in progress, may be ready to hand off to someone later today or tomorrow
  3. miniruns & regression analysis
    • Several issues have been opened relating to getting the minirun functionality. It will be based on the burst analysis.
  4. feedback
  5. Beam modulation
    • Updates to the bmwClient
      • Plan to test changes tomorrow (May 30) sometime
    • Decoding and BMOD tree extraction

Hardware/DAQ tasklist

  1. EPICS run-start and fast logger (and EPICS decoder to slow tree)
  2. Timing: mostly understood, still small mysteries (LNE)
  3. Synchronization-check system. w/help from Ed Jastrzembski
  4. Clean up cabling, labels, fasteners - First need to examine all signals
  5. Clean up CRL -- eliminate so-called "dirty trick"
    • CC: that is Bob’s court. PK: we should look at the CH and injector CRLs once we finish up with the timing and beamMod client.
  6. Pedestal studies, aka cross-talk
  7. Green Monster rework: Robert
  8. automatic production of run-dependent database
  9. alarms like end-of-run voice
    • later
  10. e-logbook entries
    • later
  11. Document everything. Circuit diagrams, cable map, "how to".
    • CC: will make circuit diagrams.
  12. ADAQ and HDD system monitoring
  13. Remote power supply cycling capability:
    • CC: asked Alex about this and he said there are some. Will investigate further.

ReSpin of APEX runs

runlist

  1. Aggregator Sakib:
  2. Pass 2: Paul

Present

Paul K., Michael V., Cameron, Tao, Bob M., Devi, Robert R. Sakib

Excused

Wouter