Difference between revisions of "GEM Meeting/20190531"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> GEM_Meeting == Logistic information == BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 Internati...")
 
Line 9: Line 9:
  
 
==Agenda==
 
==Agenda==
 +
*Chandan: The seven GEM is working. The TreeSearch and PREX-counting repositories are installed on a-onl account. DAQ is working upto 450 Hz.
 +
**Bob: Is the rate limit from FADC or MPD? For production data we will take mode 9 data.
 +
**Chandan: Not sure, Will check.
 +
*Dustin: Jack said the Ar/CO2 mixture can change within few percent. The pressure can change a bit.
 +
**Seamus: May not be a problem if we monitor the flow rate when we will use the GEM detectors.
 +
*Bob: Can we calibrate the pedestal of GEM detectors and getrid-off unnecessary data.
 +
**Seamus: May not be possible with current MPD resources.
 +
*Seamus: ISU, SBU and UVa group should come up with run plan - Pedestal, efficiency, etc.
 +
**Dustin: Will try to be comeup with a run plan
 +
*Nilanga: Do we have online scripts?
 +
**Seamus: TreeSearch and PREX-counting repository is already installed on the aonl accounts.
  
 +
 +
  
 
==Minutes==
 
==Minutes==
Line 15: Line 28:
  
 
== Present ==
 
== Present ==
 
+
Dustin, Bryan, Ye Tian, Chandan, Ryan, Seamus, Devi, Siyu, Bob Michaels, Nilanga
  
 
===Excused===
 
===Excused===

Revision as of 15:46, 31 May 2019

Back to Main Page >> GEM_Meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  998 903 0149
 Bluejeans link: https://bluejeans.com/9989030149

Agenda

  • Chandan: The seven GEM is working. The TreeSearch and PREX-counting repositories are installed on a-onl account. DAQ is working upto 450 Hz.
    • Bob: Is the rate limit from FADC or MPD? For production data we will take mode 9 data.
    • Chandan: Not sure, Will check.
  • Dustin: Jack said the Ar/CO2 mixture can change within few percent. The pressure can change a bit.
    • Seamus: May not be a problem if we monitor the flow rate when we will use the GEM detectors.
  • Bob: Can we calibrate the pedestal of GEM detectors and getrid-off unnecessary data.
    • Seamus: May not be possible with current MPD resources.
  • Seamus: ISU, SBU and UVa group should come up with run plan - Pedestal, efficiency, etc.
    • Dustin: Will try to be comeup with a run plan
  • Nilanga: Do we have online scripts?
    • Seamus: TreeSearch and PREX-counting repository is already installed on the aonl accounts.



Minutes

Present

Dustin, Bryan, Ye Tian, Chandan, Ryan, Seamus, Devi, Siyu, Bob Michaels, Nilanga

Excused