[https://prex.jlab.org/wiki/index.php/Main_Page <B>PREX Main</B>]<< [[Information for Shift Takers]] << [[Shift Taker Responsibilities]] | [https://prex.jlab.org/wiki/index.php/Main_Page <B>PREX Main</B>]<< [[Information for Shift Takers]] << [[Shift Taker Responsibilities]] | ||
+ | == Finding the checklist == | ||
* Open the [https://logbooks.jlab.org/checklists/293 checklist] | * Open the [https://logbooks.jlab.org/checklists/293 checklist] | ||
* If you are not already logged in, do so by clicking in the upper right of the page | * If you are not already logged in, do so by clicking in the upper right of the page | ||
− | * You should now be able to click ''Log'' in the upper right | + | * You should now be able to click ''Log'' in the upper left |
+ | * In log mode, you will be able to add notes in the boxes at the right | ||
+ | * Click the checkbox at the left of each item once it is complete | ||
− | Shift leader | + | == Item Instructions == |
− | Target operator | + | |
− | Analysis expert | + | * Entering shift info |
− | + | ** Enter the names of the shift workers (Shift leader, Target operator, Analysis expert) | |
− | Is alarm handler running on hacweb7? | + | ** Indicate which shift the checklist is for (day, swing, or owl) |
− | Is the volume up on hacweb7? (both hardware and software) | + | * Information about the beam |
− | Beam Energy (GeV) | + | ** Is alarm handler running on hacweb7? |
− | Beam current (µA) | + | ** Is the volume up on hacweb7? (both hardware and software) |
− | Downstream raster (B) on? Yes/No | + | ** Beam Energy (GeV) |
− | Raster size (x:y mm, see log 3654466 )? | + | ** Beam current (µA) |
− | Fast feedback on? Yes/No | + | ** Downstream raster (B) on? Yes/No |
− | Beam Position Monitor X/Y (mm) A | + | ** Raster size (x:y mm, see log 3654466 )? |
− | Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools) | + | ** Fast feedback on? Yes/No |
− | BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog | + | ** Beam Position Monitor X/Y (mm) A |
− | Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF)) | + | ** Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools) |
− | VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall behind the door | + | ** BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog |
− | Current Target | + | ** Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF)) |
− | Argon pressure (psi) | + | ** VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall behind the door |
− | Ethane pressure (psi) | + | ** Current Target |
− | CO2 pressure (psi) | + | ** Argon pressure (psi) |
− | Visual Hall Inspection OK? | + | ** Ethane pressure (psi) |
− | Truck ramp door closed ( use the camera to see the door from mirror)? | + | ** CO2 pressure (psi) |
− | Septum current (A) and polarity? | + | ** Visual Hall Inspection OK? |
− | Upstream/downstream corrector currents (A) ? | + | ** Truck ramp door closed ( use the camera to see the door from mirror)? |
− | Left Arm | + | ** Septum current (A) and polarity? |
− | + | ** Upstream/downstream corrector currents (A) ? | |
− | + | * [[Left Arm Checks]] | |
− | + | * [[Right Arm Checks]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Right arm momentum (GeV) | Right arm momentum (GeV) | ||
− | Right Arm Q1, Q2,D,Q3 | + | Right Arm Q1, Q2,D,Q3 regulator on? (yes/no) |
Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) | Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) | ||
Right Arm NMR OK? Yes/No | Right Arm NMR OK? Yes/No |
Revision as of 16:14, 8 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main<< Information for Shift Takers << Shift Taker Responsibilities
Finding the checklist
- Open the checklist
- If you are not already logged in, do so by clicking in the upper right of the page
- You should now be able to click Log in the upper left
- In log mode, you will be able to add notes in the boxes at the right
- Click the checkbox at the left of each item once it is complete
Item Instructions
- Entering shift info
- Enter the names of the shift workers (Shift leader, Target operator, Analysis expert)
- Indicate which shift the checklist is for (day, swing, or owl)
- Information about the beam
- Is alarm handler running on hacweb7?
- Is the volume up on hacweb7? (both hardware and software)
- Beam Energy (GeV)
- Beam current (µA)
- Downstream raster (B) on? Yes/No
- Raster size (x:y mm, see log 3654466 )?
- Fast feedback on? Yes/No
- Beam Position Monitor X/Y (mm) A
- Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
- BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog
- Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
- VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall behind the door
- Current Target
- Argon pressure (psi)
- Ethane pressure (psi)
- CO2 pressure (psi)
- Visual Hall Inspection OK?
- Truck ramp door closed ( use the camera to see the door from mirror)?
- Septum current (A) and polarity?
- Upstream/downstream corrector currents (A) ?
- Left Arm Checks
- Right Arm Checks
Right arm momentum (GeV) Right Arm Q1, Q2,D,Q3 regulator on? (yes/no) Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) Right Arm NMR OK? Yes/No Right Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G) Is Right VDC gas flow (top/bottom) on? Right VDC HV on (top/bottom)? Right Cerenkov HV on? Right Pion rejector HV on? Right s0/s2m HV on? Right SCIFI HV off (should be off during production runs, y/n)? S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)? Check online plots (y/n)? -RHRS Latest run type (Test, Physics,..) Is the auto replay script running (ask the analysis expert)? Is the APEX run list (in a white binder) completed? Please attach the left/right HV and Scalers Screenshots to the shift report Time of beginning of latest run (RHRS) Latest run number Dead time (%) Beamtime accounting table submitted? Empty drip tray and place mug under spout on coffee maker