a crew of experts is available for the shift.  This schedule will be updated frequently by the Run Coordinator
 
a crew of experts is available for the shift.  This schedule will be updated frequently by the Run Coordinator
 
as the situation on the ground changes.   
 
as the situation on the ground changes.   
 +
 +
Previous daily run plans can be found here [[PreviousRunPlanDaily]]
 
<hr>
 
<hr>
  
Line 10: Line 12:
 
! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!---&nbsp;Status&nbsp;---
 
! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!---&nbsp;Status&nbsp;---
 
|-
 
|-
| 03/19
+
| Monday 3 May
| Day
 
| pump down; Møller, Compton, septum install; Q2 repair<br />
 
Insert sieve. (Techs)
 
|done
 
|-
 
| 03/19
 
| Swing
 
| Beam restore (B-team)
 
| done
 
|-
 
| 03/20
 
| Owl
 
|
 
* Septum checkout (Michaels: Page when beam imminent & spectrometer ready)
 
also:
 
* Initial look at low current cavity monitors (Ahmed: Page when beam imminent & spectrometer ready)
 
* Target alignment (Michaels)
 
* VDC checkout (Michaels)
 
* Quartz detectors checkout (McNulty, Wexler -- page when VDC tracks seen)
 
* GEM checkout (Camsonne -- page when VDC tracks seen, if left dipole is operating)
 
| done
 
----
 
All at 1-2 µA.<br />
 
Scattered energy ~ beam energy = 1.063 GeV.<br />
 
Quad settings:
 
*Right arm:
 
** Q1: dI/dP= 411.2474 Amps/GeV/c
 
** Q2: dI/dP= 436.2014 Amps/GeV/c
 
** Q3: dI/dP= 433.3897 Amps/GeV/c
 
* Left Arm:
 
** Q1: dI/dP= 419.8772 Amps/GeV/c
 
** Q2: dI/dP= 435.6273 Amps/GeV/c
 
** Q3: dI/dP= 434.9682 Amps/GeV/c
 
"Usual" polarity
 
|-
 
| 03/20
 
| Day
 
| Beam off & hall open 9:00 am<br />
 
Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs)
 
| done
 
|-
 
| 03/20
 
| Swing
 
|
 
* Close up hall
 
* Benesch tuning (1/2 - 2 hours)
 
* Verify quad polarities (Camsonne)
 
* Cavity monitors basic function test (Ahmed)
 
* Low current cavity monitors setup (Musson, Ahmed)
 
| done
 
|-
 
| 3/21
 
| Owl
 
|
 
* Low current cavity monitors setup (Musson, Ahmed)
 
* Access for GEM installation (Camsonne)
 
| done but GEMs not ready
 
|-
 
| 3/21
 
| Day
 
|
 
* Spectrometer checkout:
 
** Quartz detectors checkout (McNulty, Wexler)
 
** Lumi checkout (Mercado) (2 µA on Ta)
 
** GEM checkout (Camsonne?)
 
* A line tuning (Benesch)
 
* Raster checkout
 
* Access:
 
** Low current cavities
 
** Target position
 
** Quartz
 
** Scintillator alignment
 
** LQ2
 
| done
 
|-
 
| 3/21
 
| Swing
 
|
 
* Low current cavity monitors setup (Michaels, Ahmed)
 
* Remove sieves
 
* Initial look at sieve out data
 
* Replace sieves
 
| done
 
|-
 
| 3/22
 
| Owl
 
|
 
* Pointing measurement (Riordan)
 
* Remove sieves
 
* Repeat pointing measurements with no sieves
 
* If done or unable to continue before 4 am page Luis Mercado to do lumi checks
 
* After 4 am page Dustin McNulty for detector work
 
|done
 
|-
 
| 3/22
 
| Day
 
|
 
* Optics (Liyanage) Sieve OUT.  NB Current limit 2 uA!
 
|done
 
|-
 
| 3/22
 
| Swing
 
|
 
* Optics continued, sieve IN.  NB Current limit 2 uA! (Shift Crew)
 
|done
 
|-
 
| 3/23
 
| Owl
 
|
 
* Quartz detectors resolution studies (KK, Dustin, John W)
 
* Lumi studies (Luis)
 
|done
 
|-
 
| 3/23
 
| Day
 
|
 
* Remove water target. (Target, Techs)
 
* Reconfigure Moller cryo.
 
* '''Beam studies''' ~ 2pm, study of helicity correlated position differences for spin flipper states. (Dalton, Rupesh, Reza)
 
|water cell removed, rest not finished
 
|-
 
| 3/23
 
| Swing
 
|
 
* Target pumpdown
 
|done
 
|-
 
| 3/24
 
| Owl
 
|
 
* Target pumpdown
 
|done
 
|-
 
| 3/24
 
| Day
 
|
 
* Target cooldown
 
|done
 
|-
 
| 3/24
 
| Swing
 
|
 
* Tune high current beam into Hall A
 
|done
 
|-
 
| 3/25
 
| Owl
 
|
 
* Commission lead target, 50 uA (Bob)
 
* Lumis and oversampling tests (KK, Luis, Paul)
 
|in progress
 
|-
 
| 3/25
 
| Day
 
|
 
* Access to fix left dipole
 
|done
 
|-
 
| 3/25
 
| Swing
 
|
 
* Parity Quality commissioning (Kent, Rupesh, Luis, Dustin)
 
* Beam monitor calibrations (Diancheng Wang, Xiaoyan Deng)
 
|postponed
 
|-
 
| 3/26
 
| Owl
 
|
 
* High Luminosity Detector Commissioning
 
|in progress
 
|-
 
| 3/26
 
| Day
 
|
 
*Moller Checkout
 
|postponed
 
|-
 
| 3/26
 
| Swing
 
|
 
*High Current on C12 (thick and thin)
 
|partly done
 
|-
 
| 3/27
 
| Owl
 
|
 
| no beam
 
|-
 
| 3/27
 
| Day
 
|
 
| no beam
 
|-
 
| 3/27
 
| Swing
 
|
 
*High-current on thick C12, adjust HV (Luis or Bob)
 
*Finish the commissioning of thick Pb target (Bob, Ahmed)
 
*Electronic Commissioning (KK, Luis, Paul, Jon et al)
 
|done, high-current tests continue
 
|-
 
| 3/28
 
| Owl
 
|
 
*Continue with the above, if necessary.
 
*High Luminosity Commissioning (Rupesh, Luis, Jon, Bob)
 
*BCM/BPM calibration (Rupesh)
 
*Establishing Parity Measurements, Charge feedback, blinding (Rupesh, Jon)
 
|not finished
 
|-
 
| 3/28
 
| Day
 
|
 
*Comparison Study of Optics Tunes (Seamus, Nilanga, Kiad)
 
*Sometime before Monday, submit the ATLIS plan for Dithering test (Rupesh)
 
|done
 
|-
 
| 3/28
 
| Swing
 
|
 
*Continue Optics if necessary.
 
*Continue High Luminosity Commissioning
 
|done
 
|-
 
| 3/29
 
| Owl
 
|
 
*Mini-production run (shift crew)
 
*Stop beam at 07:00 or whenever Ed Folts asks to.
 
|done
 
|-
 
| 3/29
 
| Day
 
|
 
*Open Hall A to set up Moller and Compton (Ed Folts, Sasha, Sirish, et.al.)
 
*Work on GEMs (Alex, Seamus, et.al.)
 
*MCC to do beam studies while Hall A open
 
*Detector linearity/LED tests (Luis)
 
*Setup WAC analysis (Mark, Mindy)
 
|done
 
|-
 
| 3/29
 
| Swing
 
|
 
*Moller magnet cooldown
 
*Optics and acceptance studies (Seamus, Ahmed, Nilanga)
 
|done
 
|-
 
| 3/30
 
| Owl
 
|
 
*Commission charge feedback (Mark)
 
*Current monitor calibration and pedestals determination (Mark)
 
*Quasi-production on Empty Target (owl shift crew)
 
|done
 
|-
 
| 3/30
 
| Day
 
|
 
*Access do work on Moller and Compton.
 
*Some GEM installation work. (Alex, Seamus, Kiad, Nilanga)
 
*Possible linearity/LED study. (Luis)
 
|done, except linearity
 
|-
 
| 3/30
 
| Swing
 
|
 
*First Commissioning of Moller -- Beam Checks (Sasha, Javier, Roman, Jay)
 
|done
 
|-
 
| 3/31
 
| Owl
 
|
 
*Scans of Septum and quad Q1 for tunes A and B. (Bob)
 
*Beam Studies of Helicity Correlations
 
|done
 
|-
 
| 3/31
 
| Day
 
|
 
*Beam Tuning (Jay Benesch)
 
|done
 
|-
 
| 3/31
 
| Swing
 
|
 
*Either or both of these:
 
* a) Moller Commissioning (Sasha, Javier, Roman, Jay)
 
* b) Tests of Dithering and other Beam-Related things (Kent, Rupesh)
 
|Moller was done
 
|-
 
| 4/1
 
| Owl
 
|
 
*If Kent's tests not done on Swing, continue here. (Kent, Rupesh)
 
*Beam and Septum scan with new tune (Seamus)
 
*Helicity-correlated beam studies (Shift crew)
 
|done
 
|-
 
| 4/1
 
| Day
 
|
 
* Beam Tuning (Jay)
 
|done, successful
 
|-
 
| 4/1
 
| Swing
 
|
 
* More beam tuning if necessary
 
* Moller Commissioning
 
|done
 
|-
 
| Friday 2 April
 
| Owl
 
|
 
*Assuming the HRS tune has been frozen
 
*Check detector alignment
 
*A_T studies
 
*Q<sup>2</sup> Measurements
 
|partly done, needs more work
 
|-
 
| Friday 2 April
 
| Day
 
|
 
*Tuning Beam for Compton
 
|done
 
|-
 
| Friday 2 April
 
| Swing
 
|
 
*  20:00 Obtain sieve runs (optics mini-run plan), Q<sup>2</sup> measurements (Bob)
 
|done, but not Q<sup>2</sup>
 
|-
 
| Saturday 3 April
 
| Owl
 
|
 
* Obtain sieve runs on Ta (Nilanga mini-run plan)
 
* Put in Lead target at low current and do counting-mode runs (Rupesh, Ahmed)
 
* Integrate-mode with Lead at 2 or 3 uA (Luis, Jon)
 
|done
 
|-
 
| Saturday 3 April
 
| Day
 
|
 
* Moller Commissioning <font color="green">(priority activity)</font>
 
* Work on getting into production mode (Mark, Rupesh)
 
|done, but not yet in prod.
 
|-
 
| Saturday 3 April
 
| Swing
 
|
 
* Moller commissioning
 
|done
 
|-
 
| Sunday 4 April
 
| Owl
 
|
 
* Counting data on tune Y (right arm) super-thin carbon
 
* Change to tune B
 
* Integrate-mode with Lead at 2 or 3 uA (Luis, Jon)
 
|done
 
|-
 
| Sunday 4 April
 
| Day
 
|
 
* Integrate-mode with thick carbon 50 uA
 
* Compton QWP1 calibration.
 
|done
 
|-
 
| Sunday 4 April
 
| Swing
 
|
 
* General Compton commissioning and pseudo-production (empty target) parity data at 50 uA.
 
|done
 
|-
 
| Monday 5 April
 
| Owl
 
|
 
* pseudo-production (empty target) parity data and Compton data at 50 uA.
 
|done
 
|-
 
| Monday 5 April
 
| Day
 
|
 
* 12:00 Jay to run optics test (~ 30 mins)
 
* Moller Spin Dance
 
* Set up vertical polarization and measure A_T
 
|done
 
|-
 
| Monday 5 April
 
| Swing
 
|
 
*Continue to setup up vertical polarization
 
*Measurements of A_T on Pb and C12
 
|done
 
|-
 
| Tuesday 6 April
 
| Owl
 
|
 
* Continue measurements of A_T on Pb and C12
 
|partly done
 
|-
 
| Tuesday 6 April
 
| Day
 
|
 
* Possible horizontal scan:  Tune B with sieve slit (Seamus)
 
* When ready: Relocate Quartz Detectors (Dustin, Jack)
 
|postponed: vacuum problems
 
|-
 
| Tuesday 6 April
 
| Swing
 
|
 
* In restricted access.
 
* Any activities that require access.
 
* Shift canceled
 
|
 
|-
 
| Wednesday 7 April
 
| Owl
 
|
 
* Shift cancelled
 
|
 
|-
 
| Wednesday 7 April
 
| Day
 
|
 
*Shift cancelled
 
* Investigate target vacuum problem
 
* Move quartz detectors (Dustin, Jack)
 
|Leak found at O-ring connection between target chamber and collimator box
 
|-
 
| Wednesday 7 April
 
| Swing
 
|
 
*Shift cancelled
 
|
 
|-
 
| Thursday 8 April
 
| Owl
 
|
 
*Shift cancelled
 
|
 
|-
 
| Thursday 8 April
 
| Day
 
|
 
*Shift cancelled
 
|Target chamber open, found that the 4th foil in Optics target blown off
 
|-
 
| Thursday 8 April
 
| Swing
 
|
 
*Shift cancelled
 
|
 
|-
 
| Friday 9 April
 
| Owl
 
|
 
*Shift cancelled
 
|
 
|-
 
| Friday 9 April
 
| Day
 
|
 
* To be determined.
 
* When ready: Install GEMs
 
|
 
|-
 
| Friday 9 April
 
| Swing
 
|
 
* Cancelled
 
|
 
|-
 
| Saturday 10 April
 
| Owl
 
|
 
* Cancelled
 
|
 
|-
 
| Saturday 10 April
 
| Day
 
|
 
* Cancelled
 
|
 
|-
 
| Saturday 10 April
 
| Swing
 
|
 
* Cancelled
 
|
 
|-
 
| Sunday 11 April
 
| Owl
 
|
 
* Cancelled
 
|
 
|-
 
| Sunday 11 April
 
| Day
 
|
 
* Cancelled
 
|
 
|-
 
| Sunday 11 April
 
| Swing
 
|
 
* Cancelled
 
|
 
|-
 
| Monday 12 April
 
| Owl
 
|
 
* Cancelled
 
|
 
|-
 
| Monday 12 April
 
| Day
 
|
 
* Cancelled
 
|
 
|-
 
| Monday 12 April
 
| Swing
 
|
 
* Cancelled
 
|
 
|-
 
| Tuesday 13 April
 
| Owl
 
|
 
* Cancelled
 
|
 
|-
 
| Tuesday 13 April
 
| Day
 
|
 
* Cancelled
 
|
 
|-
 
| Tuesday 13 April
 
| Swing
 
|
 
* Cancelled
 
|Tungsten collimator modified and installed.  Target pump down started and initially successful.
 
|-
 
| Wednesday 14 April
 
| Owl
 
|
 
* Cancelled
 
| Target pump down.
 
|-
 
| Wednesday 14 April
 
| Day
 
|
 
* Cancelled -- no shift workers (might need a TO)
 
* Target pump down and leak checking.
 
* When ready, begin target cooldown. (Dave Meekins and JP)
 
| Done.  Vacuum good.  Target cold.
 
|-
 
| Wednesday 14 April
 
| Swing
 
|
 
* Beam restore in Hall A
 
* Harp Scan - Shifters
 
* Raster size scan (goal is 3x3mm on empty cell) - Shifters.
 
* Detector Alignment - Dustin
 
* Dithering run with Septum On/Off - Rupesh.
 
|
 
|-
 
| Thursday 15 April
 
| Owl
 
|
 
<!--#* Beam restore in Hall A
 
#* When ready, begin <font color="blue">PREX recovery program:</font>
 
#* Check alignment of collimator.  Check temperature vs beam current. (Bob)
 
#* Check alignment of PREX quartz detector. (Dustin)
 
#* Check alignment of sieve slits, verify they did not change. (Seamus or Bob)
 
* Check alignment of Pb/diamond target and optimal raster size. (Bob)-->
 
* Thick Carbon Integrating Mode Run - Rupesh.
 
* Thick Carbon Dithering Run - Rupesh + Luis.
 
* Take Access: Change to counting mode and put sieve in - Ahmed.
 
|
 
|-
 
| Thursday 15 April
 
| Day
 
|
 
* Beam Studies -- establishing good beam in Hall A and Compton (Jay and B team)
 
|
 
|-
 
| Thursday 15 April
 
| Swing
 
|
 
* Detector Alignment - Dustin.
 
* Pb Alignment - Bob.
 
* Take access and put sieve in - Seamus.
 
* Sieve Alignment - Seamus.
 
* Take Access to remove sieve (Seamus) + switch to integrating mode (Jon) - '''Page Guy and Bob'''.
 
* Heat load test '''(run up to 500C)''' - Bob + Guy.
 
If possible, depending on heat load test:
 
* Relative Rate 12C/Pb Runs - Bob / Dustin.
 
* Start production (Rupesh, Luis, Kent, Krishna)
 
|
 
|-
 
| Friday 16 April
 
 
| Owl
 
| Owl
 
|
 
|
Line 621: Line 18:
 
|
 
|
 
|-
 
|-
| Friday 16 April
+
| Monday 3 May
 
| Day
 
| Day
 
|
 
|
* Production
+
* Hall B Pass change 3 -> 5 until ~1:00PM
 +
* Compton vacuum, LHRS dipole UPS replacement during the down
 +
* Return to PbD #2 production
 
|
 
|
 
|-
 
|-
| Friday 16 April
+
| Monday 3 May
| Swing
 
|
 
* Production @ 40uA
 
* Ramp up to 50uA (Guy + Bob)
 
|
 
|-
 
| Saturday 17 April
 
| Owl
 
|
 
* Production @ 50uA
 
|
 
|-
 
| Saturday 17 April
 
| Day
 
|
 
* Production @ 50uA
 
* Moller Checks + Measurement Starting 9am (Sasha)
 
|
 
|-
 
| Saturday 17 April
 
| Swing
 
|
 
* Moller till 7pm (Sasha).
 
* Compton (Jay Benesch + Megan).
 
* Production @ 50uA.
 
|
 
|-
 
| Sunday 18 April
 
| Owl
 
|
 
* Production @ 50uA
 
|
 
|-
 
| Sunday 18 April
 
| Day + Swing
 
|
 
* Production @ 50uA.
 
* Staring 3pm:
 
# Compton test (Jay Benesch + Megan).
 
# Page Dustin + Jon + Bob + Sasha.
 
# Q^2 Measurement (Bob)
 
# Call Compton Experts
 
# Access:
 
## Refill Moller Magnet.
 
## Check Compton HV.
 
## Remove S0.
 
## Go to counting mode (Dustin).
 
## Compton Stuff.
 
## Detector Mapping (Jon).
 
# Detector Alignment (Dustin).
 
# Q^2 Measurement (Bob).
 
# Relative Rate Measurement (Bob).
 
# Access to Return to Integrating Mode.
 
* Production @ 50uA
 
|-
 
| Monday 19 April
 
| Owl
 
|
 
* Production @ 50uA
 
|
 
|-
 
| Monday 19 April
 
| Day
 
|
 
* Production @ 50uA
 
|
 
|-
 
| Monday 19 April
 
 
| Swing
 
| Swing
 
|
 
|
Line 701: Line 32:
 
|
 
|
 
|-
 
|-
| Tuesday 20 April
+
| Tuesday 4 May
 
| Owl
 
| Owl
 
|
 
|
Line 707: Line 38:
 
|
 
|
 
|-
 
|-
| Tuesday 20 April
+
| Tuesday 4 May
 
| Day
 
| Day
 
|
 
|
* Production
+
* Beam studies
* Beam studies from approx. 11 am to 2 pm
+
* Installation of new switch for Pockels cell (as per Kent)
* Hall A Activities:
+
* 8 hour Compton beam line bake-out, leak check
* -- Compton 1/4wave stepper (Abdurahim)
 
* -- Check R-HRS Q2 and switch to remote mode (Heidi)
 
* -- Adjust R-HRS A_T (Dustin)
 
* -- Take pedestal data (Jon)
 
* -- Check 4th GEM and possibly install 5th (Alex, Jon)
 
* -- Test motion of A_T detector R-HRS (Jon)
 
* -- Possible Compton shielding / HV check (Megan)
 
* -- Ramp Moller magnet, measure stray fields. (Sasha)
 
* -- Parasitic work on floor (Yi Qiang)
 
 
|
 
|
 
|-
 
|-
| Tuesday 20 April
+
| Tuesday 4 May
 
| Swing
 
| Swing
 
|
 
|
* Tune up Compton
+
* Low -> high current cavity switch test (Bob, Ahmed) (??)
 
* Production
 
* Production
 
|
 
|
 
|-
 
|-
 
+
| Wednesday 5 May
| Wednesday 21 April
 
 
| Owl
 
| Owl
 
|
 
|
Line 738: Line 59:
 
|
 
|
 
|-
 
|-
| Wednesday 21 April
+
| Wednesday 5 May
 
| Day
 
| Day
 
|
 
|
Line 744: Line 65:
 
|
 
|
 
|-
 
|-
| Wednesday 21 April
+
| Wednesday 5 May
 
| Swing
 
| Swing
 
|
 
|
Line 750: Line 71:
 
|
 
|
 
|-
 
|-
| Thursday 22 April
+
| Thursday 6 May
 
| Owl
 
| Owl
 
|
 
|
Line 756: Line 77:
 
|
 
|
 
|-
 
|-
| Thursday 22 April
+
| Thursday 6 May
 
| Day
 
| Day
|
 
* Beam studies.  Transverse Phase Space Study in Wien.  (Reza, Mark, Rupesh)
 
* At ~2 pm start Moller commissioning
 
|
 
|-
 
| Thursday 22 April
 
| Swing
 
|
 
* Finish Moller (10 hours)
 
* Resume Production
 
* Don't forget the beam recovery procedure
 
|
 
|-
 
| Friday 23 April
 
| Owl
 
 
|
 
|
 
* Production
 
* Production
 
|
 
|
 
|-
 
|-
| Friday 23 April
+
| Thursday 6 May
| Day
 
|
 
* Q<sup>2</sup> Studies (3 hrs) -- Dustin, Bob
 
* GEM studies are only parasitic.
 
|
 
|-
 
| Friday 23 April
 
 
| Swing
 
| Swing
 
|
 
|
Line 790: Line 89:
 
|
 
|
 
|-
 
|-
| Saturday 24 April
+
| Friday 7 May
| Owl
 
|
 
* Production on thick C12
 
|
 
|-
 
| Saturday 24 April
 
| Day
 
|
 
* Production on thick C12
 
* At about 2 pm switch to 120 Hz, still C12
 
* Run briefly on C12 at 120 Hz
 
* Switch to thick Pb target (120 Hz)
 
|
 
|-
 
| Saturday 24 April
 
| Swing
 
|
 
* Production on Pb at 120 Hz
 
|
 
|-
 
| Sunday 25 April
 
 
| Owl
 
| Owl
 
|
 
|
Line 817: Line 95:
 
|
 
|
 
|-
 
|-
| Sunday 25 April
+
| Friday 7 May
 
| Day
 
| Day
|
 
* Q<sup>2</sup> measurements - Bob, Dustin
 
* Otherwise production
 
|done
 
|-
 
| Sunday 25 April
 
| Swing
 
 
|
 
|
 
* Production
 
* Production
|
 
|-
 
| Monday 26 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Monday 26 April
 
| Day
 
|
 
 
* Wien flip
 
* Wien flip
|Wien flip postponed until Tues
 
|-
 
| Monday 26 April
 
| Swing
 
|
 
* Production
 
|-
 
| Tuesday 27 April
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Tuesday 27 April
 
| Day
 
|
 
* Beam Studies
 
* Wien Flip
 
* Checks of laser at polarized source (Kent and EGG)
 
* Adiabatic Damping Study (Yves Roblin)
 
 
|
 
|
Done
 
 
|-
 
|-
| Tuesday 27 April
+
| Friday 7 May
 
| Swing
 
| Swing
 
|
 
|
* Compton Tune
 
* 4 hrs on Thick Carbon (RD=0, IT=500us)
 
* flip half-wave plate
 
* 4 hrs on Thick Carbon
 
|
 
|-
 
| Wednesday 28 April
 
| Owl
 
|
 
* Finish Swing Plan
 
* Yves Roblin Measurement (if possible)
 
* Run on Carbon (RD=0, IT=1535)
 
|
 
|-
 
| Wednesday 28 April
 
| Day
 
|
 
* Moller
 
|
 
|-
 
| Wednesday 28 April
 
| Swing
 
|
 
* Finish Moller
 
 
* Production
 
* Production
 
|
 
|
 
|-
 
|-
| Thursday 29 April
+
| Saturday 8 May
 
| Owl
 
| Owl
 
|
 
|
Line 899: Line 114:
 
|
 
|
 
|-
 
|-
| Thursday 29 April
+
| Saturday 8 May
 
| Day
 
| Day
 
|
 
|
 
* Production
 
* Production
|Access to repair target leak
 
|-
 
| Thursday 29 April
 
| Swing
 
|
 
* Production
 
|Could not close hall due to faulty fire suppression system
 
|-
 
| Friday 30 April
 
| Owl
 
 
|
 
|
* Production
 
|Could not close hall due to faulty fire suppression system
 
 
|-
 
|-
| Friday 30 April
+
| Saturday 8 May
| Day
 
|
 
* 08:00 Beam Stops for Open House
 
|
 
|-
 
| Friday 30 April
 
 
| Swing
 
| Swing
 
|
 
|
* No Beam
 
* Injector studies
 
|
 
|-
 
| Friday 30 April
 
| Owl
 
|
 
* No Beam
 
* Injector studies
 
|
 
|-
 
| Saturday 1 May
 
| Day
 
|
 
* Open House
 
* Detector work
 
* Compton work
 
|
 
|-
 
| Saturday 1 May
 
| Swing
 
|
 
* Restore Beam. 
 
* Check Beam Properties.  (shift)
 
* Pulsed Beam Test. (Mark, Luis)
 
|
 
|-
 
| Sunday 2 May
 
| Owl
 
|
 
* Continue with Above Tests
 
* Raster and Pb Target Tests (Bob)
 
|
 
|-
 
| Sunday 2 May
 
| Day
 
|
 
* Continue Above Tests if necessary
 
* Start Production
 
* Get cavities to work at high current.  (Ahmed)
 
* (The check of cavities at low current is postponed.)
 
|
 
|-
 
| Sunday 2 May
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Monday 3 May
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Monday 3 May
 
| Day
 
|
 
* Pass change 3 -> 5 for Hall B until ~1:00PM
 
* Compton vacuum, LHRS dipole UPS replacement during the down
 
* Return to PbD #2 production
 
|
 
|-
 
| Monday 3 May
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Tuesday 4 May
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Tuesday 4 May
 
| Day
 
|
 
* Beam studies
 
* Installation of new switch for Pockels cell (as per Kent)
 
* 8 hour Compton beam line bake-out, leak check
 
|
 
|-
 
| Tuesday 4 May
 
| Swing
 
|
 
* Low -> high current cavity switch test (Bob, Ahmed) (??)
 
 
* Production
 
* Production
 
|
 
|

Revision as of 09:55, 3 May 2010

Daily Run Plan

Here are details of the daily run plan. See also the Global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.

Previous daily run plans can be found here PreviousRunPlanDaily


Daily Run Plan for PREX   (latest at bottom)
Date (2010) Shift ---------- Activity (Responsible) ---------- --- Status ---
Monday 3 May Owl
  • Production
Monday 3 May Day
  • Hall B Pass change 3 -> 5 until ~1:00PM
  • Compton vacuum, LHRS dipole UPS replacement during the down
  • Return to PbD #2 production
Monday 3 May Swing
  • Production
Tuesday 4 May Owl
  • Production
Tuesday 4 May Day
  • Beam studies
  • Installation of new switch for Pockels cell (as per Kent)
  • 8 hour Compton beam line bake-out, leak check
Tuesday 4 May Swing
  • Low -> high current cavity switch test (Bob, Ahmed) (??)
  • Production
Wednesday 5 May Owl
  • Production
Wednesday 5 May Day
  • Production
Wednesday 5 May Swing
  • Production
Thursday 6 May Owl
  • Production
Thursday 6 May Day
  • Production
Thursday 6 May Swing
  • Production
Friday 7 May Owl
  • Production
Friday 7 May Day
  • Production
  • Wien flip
Friday 7 May Swing
  • Production
Saturday 8 May Owl
  • Production
Saturday 8 May Day
  • Production
Saturday 8 May Swing
  • Production
Wednesday 5 May Owl
  • Production
Wednesday 5 May Day
  • Production
Wednesday 5 May Swing
  • Production
Thursday 6 May Owl
  • Production
Thursday 6 May Day
  • Production
Thursday 6 May Swing
  • Production
Friday 7 May Owl
  • Production
Friday 7 May Day
  • Production
Friday 7 May Swing
  • Production
Saturday 8 May Owl
  • Production
Saturday 8 May Day
  • Production
Saturday 8 May Swing
  • Production
Sunday 9 May Owl
  • Production
Sunday 9 May Day
  • Production
Sunday 9 May Swing
  • Production
Monday 10 May Owl
  • Production