* Log in as '''apar@adaq1'''
 
* Log in as '''apar@adaq1'''
 
* In a terminal type '''startcoda'''
 
* In a terminal type '''startcoda'''
** 4 xterms will appear as well as the main CODA window (see Figure 1)
+
** 4 xterms will appear (red, orange, green and yellow) as well as the main CODA window (see Figure 1)
 
** CODA will automatically load the last configuration used. If you are ok with this then just go to '''Platform->Connect'''
 
** CODA will automatically load the last configuration used. If you are ok with this then just go to '''Platform->Connect'''
 
* To change the configuration, choose '''Configurations->Cool'''
 
* To change the configuration, choose '''Configurations->Cool'''
 
** Select the desired configuration from the dropdown list (see Figure 2)
 
** Select the desired configuration from the dropdown list (see Figure 2)
** Production running would be ''PREX''
+
** Production running would be ''ALL_PREX''
 
** Once you have loaded a configuration, some of the icons (see descriptions below) will change from ''grey'' to ''green''
 
** Once you have loaded a configuration, some of the icons (see descriptions below) will change from ''grey'' to ''green''
 +
* Press the configure icon
 +
** Warnings about waiting for a roc can be ignored if it does not take too long to respond (~10s) and things are eventually successful
 +
** Error messages should be taken seriously
 +
*** You can try a reset and reconfigure
 +
*** If that doesn't work - see [[DAQ Troubleshooting]]
 +
* Press the download icon
 +
 +
  
 
=== Starting a run ===
 
=== Starting a run ===
  
 
* After starting the GUI and loading a configuration (see above)  
 
* After starting the GUI and loading a configuration (see above)  
 +
* Press the pre-start icon
 +
** a window will pop up where you can add notes if necessary (not yet implemented for PREX)
 +
** submit or save the notes
 +
 
* '''Prestart''' (third icon from the top left)
 
* '''Prestart''' (third icon from the top left)
** In the previous steps, warnings about waiting for a roc can be ignored if it does not take too long to respond (~10s). Do watch for Error messages. ''Those cannot be ignored!''
+
** In the previous steps, warnings about waiting for a roc could be ignored if it does not take too long to respond (~10s). Do watch for Error messages. ''Those cannot be ignored!''
 +
*
  
 
=== Description of the icons ===
 
=== Description of the icons ===
Line 25: Line 38:
  
 
# '''Configure''' (tools) - this opens a drop-down menu to choose the configuration
 
# '''Configure''' (tools) - this opens a drop-down menu to choose the configuration
# '''Download''' (floppy disk) - this loads the chosen configuration
+
# '''Download''' (floppy disk) - this loads the chosen configuration to the crates
 
# '''Prestart''' () - this will prepare to start a run
 
# '''Prestart''' () - this will prepare to start a run
 
# '''Start''' (triangle with point to right) - this starts a run
 
# '''Start''' (triangle with point to right) - this starts a run
 
# '''End''' (square) - this ends a run
 
# '''End''' (square) - this ends a run
# ''' Fast Forward''' (double-triangle pointing right) (rarely used)
+
# ''' Fast Start''' (double-triangle pointing right) tries to go through all the steps (can be used as long as things aren't changing)
# ''' Rewind''' (double-triangle pointing left) (rarely used)
+
# ''' Reset''' (double-triangle pointing left) configured, but not downloaded (if you need to change configuration or GUI is wonky)
# ''' Pause ''' (two vertical bars) - pauses a run (rarely used)
+
# ''' Pause ''' (two vertical bars) - pauses a run (rarely used - to quote Paul '''Nothing good comes of this.''')
  
  

Revision as of 12:57, 9 June 2019

Starting Parity DAQ CODA

Starting the GUI

Figure 1 - Main CODA window when first started.
Image 2
Image 3
  • Log in as apar@adaq1
  • In a terminal type startcoda
    • 4 xterms will appear (red, orange, green and yellow) as well as the main CODA window (see Figure 1)
    • CODA will automatically load the last configuration used. If you are ok with this then just go to Platform->Connect
  • To change the configuration, choose Configurations->Cool
    • Select the desired configuration from the dropdown list (see Figure 2)
    • Production running would be ALL_PREX
    • Once you have loaded a configuration, some of the icons (see descriptions below) will change from grey to green
  • Press the configure icon
    • Warnings about waiting for a roc can be ignored if it does not take too long to respond (~10s) and things are eventually successful
    • Error messages should be taken seriously
  • Press the download icon


Starting a run

  • After starting the GUI and loading a configuration (see above)
  • Press the pre-start icon
    • a window will pop up where you can add notes if necessary (not yet implemented for PREX)
    • submit or save the notes
  • Prestart (third icon from the top left)
    • In the previous steps, warnings about waiting for a roc could be ignored if it does not take too long to respond (~10s). Do watch for Error messages. Those cannot be ignored!

Description of the icons

Numbered from the top left of the GUI window (see any of the Figures):

  1. Configure (tools) - this opens a drop-down menu to choose the configuration
  2. Download (floppy disk) - this loads the chosen configuration to the crates
  3. Prestart () - this will prepare to start a run
  4. Start (triangle with point to right) - this starts a run
  5. End (square) - this ends a run
  6. Fast Start (double-triangle pointing right) tries to go through all the steps (can be used as long as things aren't changing)
  7. Reset (double-triangle pointing left) configured, but not downloaded (if you need to change configuration or GUI is wonky)
  8. Pause (two vertical bars) - pauses a run (rarely used - to quote Paul Nothing good comes of this.)


Instructions for shift checklist

  • Latest run type (Test, Physics,..)
  • Is the auto replay script running (ask the analysis expert)?
  • Is the PREX run list (in a white binder) completed? (are we going to do this?)
  • Please attach the left/right HV and Scalers Screenshots to the shift report
  • Time of beginning of latest run (RHRS)
  • Latest run number
  • Dead time (%)