Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 75: | Line 75: | ||
| Swing | | Swing | ||
| | | | ||
− | * Finish Moller tests | + | * Finish Moller tests, 21:00 |
* Raster clock tests 22:00-24:00 (KK, Bob, Jon) | * Raster clock tests 22:00-24:00 (KK, Bob, Jon) | ||
* Production as per raster clock tests | * Production as per raster clock tests | ||
Line 90: | Line 90: | ||
| | | | ||
* Beam Studies (8 hours controlled access starting 08:15) | * Beam Studies (8 hours controlled access starting 08:15) | ||
− | ** RQ1 DAC replacement (Jack et al) | + | ** RQ1 DAC replacement (??) (Jack et al) |
** Finish Compton cavity work (Sirish, Abdurahim) | ** Finish Compton cavity work (Sirish, Abdurahim) | ||
** Start Compton pumping, replace leaky upstream valve? (John Heckman et al) | ** Start Compton pumping, replace leaky upstream valve? (John Heckman et al) |
Revision as of 15:36, 5 May 2010
Daily Run Plan
Here are details of the daily run plan. See also the Global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.
Previous daily run plans can be found here PreviousRunPlanDaily
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- |
---|---|---|---|
Monday 3 May | Owl |
|
|
Monday 3 May | Day |
|
|
Monday 3 May | Swing |
|
|
Tuesday 4 May | Owl |
|
|
Tuesday 4 May | Day |
|
|
Tuesday 4 May | Swing |
|
|
Wednesday 5 May | Owl |
|
|
Wednesday 5 May | Day |
|
|
Wednesday 5 May | Swing |
|
|
Thursday 6 May | Owl |
|
|
Thursday 6 May | Day |
|
|
Thursday 6 May | Swing |
|
|
Friday 7 May | Owl |
|
|
Friday 7 May | Day |
|
|
Friday 7 May | Swing |
|
|
Saturday 8 May | Owl |
|
|
Saturday 8 May | Day |
|
|
Saturday 8 May | Swing |
|
|
Wednesday 5 May | Owl |
|
|
Wednesday 5 May | Day |
|
|
Wednesday 5 May | Swing |
|
|
Thursday 6 May | Owl |
|
|
Thursday 6 May | Day |
|
|
Thursday 6 May | Swing |
|
|
Friday 7 May | Owl |
|
|
Friday 7 May | Day |
|
|
Friday 7 May | Swing |
|
|
Saturday 8 May | Owl |
|
|
Saturday 8 May | Day |
|
|
Saturday 8 May | Swing |
|
|
Sunday 9 May | Owl |
|
|
Sunday 9 May | Day |
|
|
Sunday 9 May | Swing |
|
|
Monday 10 May | Owl |
|
|
Monday 10 May | Day |
|
|
Monday 10 May | Swing |
|
|
Tuesday 11 May | Owl |
|
|
Tuesday 11 May | Day |
|
|
Tuesday 11 May | Swing |
|
|
Wednesday 12 May | Owl |
|
|
Wednesday 12 May | Day |
|