Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 11: Line 11:
 
Previous daily run plans can be found here [[PreviousRunPlanDaily]]
 
Previous daily run plans can be found here [[PreviousRunPlanDaily]]
 
<hr>
 
<hr>
 
{| border="1"
 
|+ Daily Run Plan for PREX &nbsp; <font color="blue">(latest at bottom)</font>
 
! Date (2010) !! Shift !!---------- Activity (Responsible) ----------!!---&nbsp;Status&nbsp;---
 
|-
 
| Monday 7 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Monday 7 June
 
| Day
 
|
 
* Moller Measurement (noon to 4pm)
 
* Big Change asymmetry run
 
* Production
 
|
 
|-
 
| Monday 7 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Tuesday 8 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Tuesday 8 June
 
| Day
 
|
 
* Production
 
* Wien Flip (9 AM)
 
* Beam study (9-11 AM)
 
|
 
|-
 
| Tuesday 8 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Wednesday 9 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Wednesday 9 June
 
| Day
 
|
 
* Production
 
|
 
|-
 
| Wednesday 9 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Thursday 10 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Thursday 10 June
 
| Day
 
|
 
* Production
 
|
 
|-
 
| Thursday 10 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Friday 11 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Friday 11 June
 
| Day
 
|
 
* Production
 
* Wien flip
 
|
 
|-
 
| Friday 11 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Saturday 12 June
 
| Owl
 
|
 
* High Statistics Lead Inelastics, Qsq|GEM test, Calibration of the cavities with the amplifier
 
| all done
 
|-
 
| Saturday 12 June
 
| Day
 
|
 
* Backgrounds: Dipole Scan, Transverse Polarization Measurements.
 
| Finished left dipole scan, right dipole scan is pending
 
|-
 
| Saturday 12 June
 
| Swing
 
|
 
* Transverse Polarization Measurements. Carbon
 
|
 
|-
 
| Sunday 13 June
 
| Owl
 
|
 
* Transverse Polarization Measurements. Lead
 
|
 
|-
 
| Sunday 13 June
 
| Day
 
|
 
* Transverse Polarization Measurements. Lead
 
4494 32k (beam current stepping up, might not be good)
 
4495 78k
 
4496 73k
 
4497
 
| Already took 580K multiplets, 60K of them may not be good data
 
|-
 
| Sunday 13 June
 
| Swing
 
|
 
 
* If right Q2 fixed, take 100K more A_T data then go back to production. Otherwise go back to single arm production
 
|
 
|-
 
| Monday 14 June
 
| Owl
 
|
 
* Continue Transverse Polarization Measurements. Blinded tube test
 
|
 
|-
 
| Monday 14 June
 
| Day
 
|
 
* Production
 
|
 
Remaining [https://prex.jlab.org/wiki/index.php/User_talk:Jixie_Zhang auxiliary measurements]
 
* PREx det. current calibrations (Monday swing)
 
* Finish dipole scan (Tuesday owl)
 
* Oversampling by 2 at 120 Hz (put off/cancelled)
 
* Beam induced linearity studies (put off/cancelled)
 
* Q2 measurements (relative using T5 during dipole scan)
 
* MOLLER commissioning (if can't do anything else - need repair? - see Jixie or Roman)
 
|-
 
| Monday 14 June
 
| Swing
 
|
 
* Production
 
* PREx det. current calibrations (Partially done)
 
|
 
* large charge asymmetry run couldn't be done b/c MCC couldn't set RHWP to 2500 (see [http://www.jlab.org/~adaq/halog/html/1006_archive/100614223155.html Rupesh' log entry])
 
|-
 
| Tuesday 15 June
 
| Owl
 
|
 
* Production
 
* Finish dipole scan (Done)
 
|
 
* Modified dipole scan completed overnight (see Bob's entries [http://www.jlab.org/~adaq/halog/html/1006_archive/100615031427.html 1] and [http://www.jlab.org/~adaq/halog/html/1006_archive/100615050141.html 2])
 
|-
 
| Tuesday 15 June
 
| Day
 
|
 
* Beam Studies  <br>
 
expected to deliver beam to Hall A - '''NO AUTOMATIC ACCESS'''
 
* Production
 
|
 
* large charge asymmetry run taken (see [http://www.jlab.org/~adaq/halog/html/1006_archive/100615093424.html run 4574])
 
* Beam was lost during beam studies after all
 
** Megan and Alex went in to check on the Compton
 
** Jixie and Roman did some work on the Moller, including a refill
 
** Jack and Howard worked on the RHRS dipole which had issues
 
|-
 
| Tuesday 15 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Wednesday 16 June
 
| Owl
 
|
 
* Production
 
|
 
* went to single arm running after right dipole power supply trip
 
|-
 
| Wednesday 16 June
 
| Day
 
|
 
* Right arm dipole repairs
 
* Put silicone on target
 
* Production
 
|
 
* Dipole issues unresolved
 
* Silicone helps target [http://www.jlab.org/~adaq/halog/html/1006_archive/100616154402.html vacuum pressure]
 
|-
 
| Wednesday 16 June
 
| Swing
 
|
 
* Begin with PbD#3 - check temperatures
 
** If too high - switch back to PbD#1
 
* Production - single arm running
 
|
 
* Beam not back until ~11pm
 
* Try to do beam recovery before owl starts
 
|-
 
| Thursday 17 June
 
| Owl
 
|
 
* Production (single arm)
 
|
 
|-
 
| Thursday 17 June
 
| Day
 
|
 
* Right dipole repairs
 
* Wien Flip (10am)
 
|
 
* Wien Flip done this morning
 
* Right dipole working for now
 
* Target warm up flashed off N2 ice - target cooling down
 
|-
 
| Thursday 17 June
 
| Swing
 
|
 
* Trouble sending 70 uA beam
 
|
 
* BCMs needed calibration
 
|-
 
| Friday 18 June
 
| Owl
 
|
 
* Production
 
|
 
* 70 uA beam transport established
 
* Problem with RHRS rates discovered (25x smaller than LHRS)
 
|-
 
| Friday 18 June
 
| Day
 
|
 
* Production
 
* End of Run Party 2-4pm in the ResFac Great Room
 
|
 
* RHRS sieve discovered to be partially in; Howard went in and moved it out
 
|-
 
| Friday 18 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Saturday 19 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Saturday 19 June
 
| Day
 
|
 
* Production
 
|
 
|-
 
| Saturday 19 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Sunday 20 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Sunday 20 June
 
| Day
 
|
 
* Production
 
|
 
|-
 
| Sunday 20 June
 
| Swing
 
|
 
* Production
 
|
 
|-
 
| Monday 21 June
 
| Owl
 
|
 
* Production
 
|
 
|-
 
| Monday 21 June
 
| Day
 
|
 
* Dismantle detectors - see Dustin or Alex
 
|
 
|-
 
| Tuesday 21 June
 
| Day
 
|
 
* Counting house cleaning party beginning at 8am!
 
|
 
|}
 

Revision as of 13:18, 10 June 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Daily Run Plan

Here are details of the daily run plan. See also the Global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.

Previous daily run plans can be found here PreviousRunPlanDaily