Difference between revisions of "Switching Modes"

From PREX Wiki
Jump to navigationJump to search
Line 8: Line 8:
  
 
== Counting to Integrating ==
 
== Counting to Integrating ==
# Setting HV
+
# Setting HV - this is important
 
#* VDC HV off.  This is important.
 
#* VDC HV off.  This is important.
 
#* Scintillator HV off.  This is important.
 
#* Scintillator HV off.  This is important.
#* Info about detector HV
+
#* [http://hallaweb.jlab.org/parity/prex/runinfo/opmanual.html#DetectorHV Info about detector HV]
 +
 
 
#* Adjust Quartz Detector HV for Integrating mode.
 
#* Adjust Quartz Detector HV for Integrating mode.
 
# Switching to High-Current Integrating Mode
 
# Switching to High-Current Integrating Mode
Line 21: Line 22:
 
#* Septum on
 
#* Septum on
 
# Set Up Beam
 
# Set Up Beam
#* Do the beam recovery procedure
+
#* Do the [http://hallaweb.jlab.org/parity/prex/runinfo/How_to_recover_beam.html beam recovery procedure]
 
# Take data !  Check all data including cavities.
 
# Take data !  Check all data including cavities.
  

Revision as of 11:10, 17 June 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main<< HOW TOs


This page details the checklists for switching between counting and integrating modes. For reference, here are the instructions from PREX I

Counting to Integrating

  1. Setting HV - this is important
    • Adjust Quartz Detector HV for Integrating mode.
  1. Switching to High-Current Integrating Mode
    • Septum off
    • Take access.
    • Expert to do the switch of the detector signals to integrating mode
    • Cavities: take out amplifiers. Put in attenuator on BCM. This is important.
    • Set up cavities pre-gain and phase using established values.
    • Septum on
  2. Set Up Beam
  3. Take data ! Check all data including cavities.

Integrating to Counting

  1. Preliminaries. to do long before switching
    • Make sure spectrometer DAQ works (might need reboots). Use the CODA guide if necessary.
    • Check cavities in integration mode and counting mode at high current. Run analysis macros. Do they work ?
    • Check with spot++ that rastered size is approx 4 x 3 mm (whatever is our present norm.)
    • Check the beam position ("centered" to within 0.3 mm, using the production criterea, see white board).
  2. Switching to Low-Current Counting Mode
    • Septum off
    • Take access.
    • Expert to do the switch of the detector signals to counting mode
    • Switch cavities to have amplifiers. Take out attenuator on BCM. Note: Cannot exceed 2 uA with amplifiers in place.
    • Set up cavities pre-gain and phase using established values.
    • Septum on
  3. Set Up Beam
    • Do the beam recovery procedure.
    • Establish 50 nA on Pb target (or whatever current on another target). Normally with laser attenuator = 65 and slit = 13, and then some adjustment to get rates low.
  4. Setting HV
    • Do NOT turn on scint or VDC HV yet ! Must establish rates first.
    • Info about detector HV
    • Turn on the HV for upper scint and S0 (if S0 is in place).
    • Adjust Quartz Detector HV for Counting mode.
    • VDC HV on (4 kV) if the T1/T5 rates are below 500 kHz. If above 500 kHz do not turn on HV.
  5. Take CODA run and analyze it as usual.