Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
Ciprian Gal (talk | contribs) |
||
Line 12: | Line 12: | ||
|- | |- | ||
! style="width:10%"| Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status | ! style="width:10%"| Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status | ||
− | |- | + | |- |
| rowspan="3" | Monday, June 17 | | rowspan="3" | Monday, June 17 | ||
| Owl | | Owl | ||
| | | | ||
| | | | ||
− | |- | + | |- |
| Day | | Day | ||
| Last day for planned collaboration work in Hall. | | Last day for planned collaboration work in Hall. | ||
| Expecting 2A alignment | | Expecting 2A alignment | ||
− | |- | + | |- |
| Swing | | Swing | ||
| Vacuum connections between US pipe and target and between target and collimator box. | | Vacuum connections between US pipe and target and between target and collimator box. | ||
| | | | ||
− | |- | + | |-style="background: plum" |
| rowspan="3" | Tuesday, June 18 | | rowspan="3" | Tuesday, June 18 | ||
| Owl | | Owl | ||
− | |||
| | | | ||
− | |- | + | | |
+ | |-style="background: plum" | ||
| Day | | Day | ||
| | | | ||
− | | Expecting 2B alignment | + | | Pump down the entire pivot to dump region; Expecting 2B alignment |
− | |- | + | |-style="background: plum" |
| Swing | | Swing | ||
| | | | ||
− | | | + | | |
|- | |- | ||
| rowspan="3" | Wednesday, June 19 | | rowspan="3" | Wednesday, June 19 | ||
| Owl | | Owl | ||
| | | | ||
− | | | + | | |
|- | |- | ||
| Day || | | Day || | ||
− | | | + | | Hall Closed. Final Checklist. Possible first beam in Hall A |
|- | |- | ||
| Swing | | Swing | ||
− | | | + | | Continue beam in Hall A for tuning. Start low beam checkout. |
| | | | ||
|- | |- | ||
| rowspan="3" | Thursday, June 20 | | rowspan="3" | Thursday, June 20 | ||
| Owl | | Owl | ||
− | | | + | | Continue low beam checkout. |
| | | | ||
|- | |- |
Revision as of 15:11, 18 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, June 17 | Owl | ||
Day | Last day for planned collaboration work in Hall. | Expecting 2A alignment | |
Swing | Vacuum connections between US pipe and target and between target and collimator box. | ||
Tuesday, June 18 | Owl | ||
Day | Pump down the entire pivot to dump region; Expecting 2B alignment | ||
Swing | |||
Wednesday, June 19 | Owl | ||
Day | Hall Closed. Final Checklist. Possible first beam in Hall A | ||
Swing | Continue beam in Hall A for tuning. Start low beam checkout. | ||
Thursday, June 20 | Owl | Continue low beam checkout. | |
Day | |||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting