Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 84: | Line 84: | ||
| Optics. | | Optics. | ||
| | | | ||
− | |- | + | |- |
| Swing | | Swing | ||
| Low current cavity (Ye, Cip). Minimum chase. | | Low current cavity (Ye, Cip). Minimum chase. | ||
| | | | ||
− | |- | + | |- |
| rowspan="3" | Sunday, June 23 | | rowspan="3" | Sunday, June 23 | ||
| Owl | | Owl | ||
| Inner edge search (Bob, Chandan, Kent). Q2 measurement with Pb target (Bob?). Opportunistic: Beam Modulation (Paul K, Vectoria) | | Inner edge search (Bob, Chandan, Kent). Q2 measurement with Pb target (Bob?). Opportunistic: Beam Modulation (Paul K, Vectoria) | ||
+ | | Inner edge search DONE. | ||
+ | |- | ||
+ | | Day | ||
+ | | | ||
| | | | ||
+ | |- style="background: #FCF3CF; | ||
+ | | Swing | ||
+ | | Minimize width. Minimum chase. | ||
+ | | | ||
|- style="background: #FCF3CF; | |- style="background: #FCF3CF; | ||
+ | | rowspan="3" | Monday, June 24 | ||
+ | | Owl | ||
+ | | Quartz align; quartz rate. (Dustin) | ||
+ | | | ||
+ | |-style="background: #FCF3CF; | ||
| Day | | Day | ||
− | | | + | | Spin Dance. |
| | | | ||
− | |- style="background: #FCF3CF; | + | |-style="background: #FCF3CF; |
| Swing | | Swing | ||
− | | | + | | dp scans (optics). Water cell. Width Studies (KK) |
| | | | ||
|- | |- | ||
− | | rowspan="3" | | + | | rowspan="3" | Tuesday, June 25 |
| Owl | | Owl | ||
| | | | ||
Line 108: | Line 121: | ||
|- | |- | ||
| Day | | Day | ||
− | | | + | | |
− | + | | Compton commissioning. Beam instrumentation calculation (Caryn) Production condition test (Caryn) | |
|- | |- | ||
| Swing | | Swing |
Revision as of 17:34, 23 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Monday, June 17 | Owl | ||
Day | Last day for planned collaboration work in Hall. | Expecting 2A alignment | |
Swing | Vacuum connections between US pipe and target and between target and collimator box. | ||
Tuesday, June 18 | Owl | ||
Day | Pump down the entire pivot to dump region; Expecting 2B alignment | ||
Swing | Target software checks | ||
Wednesday, June 19 | Owl | ||
Day | Hall Closed. Final Checklist. Possible first beam in Hall A | ||
Swing | Continue beam in Hall A for tuning. Start low beam checkout. | ||
Thursday, June 20 | Owl | Continue low beam current checkout. | Completed Collimator search. |
Day | Tuning | ||
Swing | Tune up and Low current commissioning. | ||
Friday, June 21 | Owl | Low current commissioning. Started optics | Commissioned 45deg and 90deg targets. Calibrated ion chambers. Bullseye scan. |
Day | High current + Compton rate tuning. | ||
Swing | High current calibration after tuning (Caryn). Low current commissioning. Restart Optics (Seamus, Sanghwa, Ryan) | Basic run quality plot macro needed (Sanghwa). | |
Saturday, June 22 | Owl | Opportunistic: Beam Modulation (Paul K, Vectoria) | ESR 15K helium issue, scattering chamber vacuum degration investigation |
Day | Optics. | ||
Swing | Low current cavity (Ye, Cip). Minimum chase. | ||
Sunday, June 23 | Owl | Inner edge search (Bob, Chandan, Kent). Q2 measurement with Pb target (Bob?). Opportunistic: Beam Modulation (Paul K, Vectoria) | Inner edge search DONE. |
Day | |||
Swing | Minimize width. Minimum chase. | ||
Monday, June 24 | Owl | Quartz align; quartz rate. (Dustin) | |
Day | Spin Dance. | ||
Swing | dp scans (optics). Water cell. Width Studies (KK) | ||
Tuesday, June 25 | Owl | ||
Day | Compton commissioning. Beam instrumentation calculation (Caryn) Production condition test (Caryn) | ||
Swing | Width Studies (KK) |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting