== Beamline instrumentation calibration ==
 
== Beamline instrumentation calibration ==
#Check the following
+
#Check the following has been performed
 
#* No target.
 
#* No target.
#* 50uA beam current, through Compton (backgrounds on fingers and Compton photon detector).  
+
#* 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector).  
# <font color="blue">ITEM1</font> <span style="background-color:#F1C40F">ITME2</span> Ciprian ITEM3:
+
#* Establish 4x4 raster. Insert lead target.  
## Establish 4x4 raster. Insert lead target.  
+
#* Detector and SAM voltages (Dustin M)
## Detector and SAM voltages (Dustin M)
+
 
 
# <font color="blue">Beamline instrumentation calibration</font> <span style="background-color:#F1C40F">0.5 shift</span> Caryn P,
 
# <font color="blue">Beamline instrumentation calibration</font> <span style="background-color:#F1C40F">0.5 shift</span> Caryn P,
 
## Current ramp for BPM/BCM calibrations and detector pedestals [[detailed Calibration plan|detailed plan]]
 
## Current ramp for BPM/BCM calibrations and detector pedestals [[detailed Calibration plan|detailed plan]]

Revision as of 08:53, 25 June 2019

Beamline instrumentation calibration

  1. Check the following has been performed
    • No target.
    • 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector).
    • Establish 4x4 raster. Insert lead target.
    • Detector and SAM voltages (Dustin M)
  1. Beamline instrumentation calibration 0.5 shift Caryn P,
    1. Current ramp for BPM/BCM calibrations and detector pedestals detailed plan
  2. Initial production condition test 0.25 shift Caryn P,
    1. detector and SAM widths
    2. regression sensitivities
    3. beam noise and asymmetry check
    4. collimator water and thermocouple temperatures,
    5. radiation monitors and ion chamber stability
  3. Width studies 0.5 shift KK,
    1. detector and SAM widths, targets, shutters, etc
    2. deinstall shutters at conclusion of test