== Beamline instrumentation calibration == | == Beamline instrumentation calibration == | ||
− | #Check the following | + | #Check the following has been performed |
#* No target. | #* No target. | ||
− | #* 50uA beam current, through Compton (backgrounds on fingers and Compton photon detector). | + | #* 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector). |
− | # | + | #* Establish 4x4 raster. Insert lead target. |
− | + | #* Detector and SAM voltages (Dustin M) | |
− | # | + | |
# <font color="blue">Beamline instrumentation calibration</font> <span style="background-color:#F1C40F">0.5 shift</span> Caryn P, | # <font color="blue">Beamline instrumentation calibration</font> <span style="background-color:#F1C40F">0.5 shift</span> Caryn P, | ||
## Current ramp for BPM/BCM calibrations and detector pedestals [[detailed Calibration plan|detailed plan]] | ## Current ramp for BPM/BCM calibrations and detector pedestals [[detailed Calibration plan|detailed plan]] |
Revision as of 08:53, 25 June 2019
Beamline instrumentation calibration
- Check the following has been performed
- No target.
- 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector).
- Establish 4x4 raster. Insert lead target.
- Detector and SAM voltages (Dustin M)
- Beamline instrumentation calibration 0.5 shift Caryn P,
- Current ramp for BPM/BCM calibrations and detector pedestals detailed plan
- Initial production condition test 0.25 shift Caryn P,
- detector and SAM widths
- regression sensitivities
- beam noise and asymmetry check
- collimator water and thermocouple temperatures,
- radiation monitors and ion chamber stability
- Width studies 0.5 shift KK,
- detector and SAM widths, targets, shutters, etc
- deinstall shutters at conclusion of test