Line 9: Line 9:
  
 
</p><ul>
 
</p><ul>
<li> Plans we <font color="Red">MUST</font> perform.
+
<li> Plans we <font color="Red">MUST</font> perform.
</li><li> Plans we'd <font color="Red">LIKE</font> to perform, but lower priority.
+
</li><li> Plans we'd <font color="Red">LIKE</font> to perform, but lower priority.
</li><li> Plans we <font color="Red">MAYBE</font> want to do (very low priority).
+
</li><li> Plans we <font color="Red">MAYBE</font> want to do (very low priority).
  
 
</li></ul>
 
</li></ul>
  
 
<table border="1" cellpadding="15">
 
<table border="1" cellpadding="15">
  <caption>
+
<caption>
    <font color="Red"> "MUST   DO"   Plans</font>
+
<font color="Red"> "MUST DO" Plans</font>
  </caption>
+
</caption>
  
  <tr>
+
<tr>
    <td>
+
<td>
            <font color="Blue"> Plan </font>    
+
<font color="Blue"> Plan </font>  
    </td>
+
</td>
    <td>
+
<td>
          <font color="Blue">Duration</font>    
+
<font color="Blue">Duration</font>  
  
    </td>
+
</td>
    <td>
+
<td>
            <font color="Blue"> Personnel</font>    
+
<font color="Blue"> Personnel</font>  
    </td>
+
</td>
  </tr>
+
</tr>
  
 
+
<tr>
 +
<td>
 +
Blinded Tube Test
 +
</td>
 +
<td>
 +
4 hours (access)
 +
</td>
 +
<td>
 +
D. McNulty, K. Kumar, J. Wexler
 +
</td>
 +
</tr>
 +
<tr>
 +
<td>
  
  <tr>
+
Further Current Calibrations with PREx Det
    <td>
+
</td>
          Blinded Tube Test 
+
<td>
    </td>
+
2 hours
    <td>
+
</td>
        4 hours (access) 
+
<td>
  
    </td>
+
Z. Ahmed
    <td>
+
</td>
        D. McNulty, K. Kumar, J. Wexler   
+
</tr>
    </td>
 
  </tr>
 
  <tr>
 
    <td>
 
  
          Further Current Calibrations with PREx Det 
+
<tr>
    </td>
+
<td>
    <td>
+
Transverse Polarization Measurements.
          2 hours    
+
</td>
    </td>
+
<td>
    <td>
+
8 hours  
 +
</td>
 +
<td>
 +
Setup: J. Grames
 +
</td>
 +
</tr>
 +
<tr>
 +
<td>
 +
High Statistics Lead Inelastics
 +
</td>
 +
<td>
 +
3 hours
 +
</td>
 +
<td>
 +
R. Michaels
 +
</td>
  
            Z. Ahmed   
+
  </tr>
    </td>
 
  </tr>
 
 
 
  <tr>
 
    <td>
 
          Transverse Polarization Measurements.
 
    </td>
 
    <td>
 
          8 hours     
 
    </td>
 
    <td>
 
        Setup: J. Grames  
 
 
 
    </td>
 
  </tr>
 
  <tr>
 
    <td>
 
          High Statistics Lead Inelastics   
 
    </td>
 
    <td>
 
          3 hours 
 
    </td>
 
    <td>
 
            R. Michaels   
 
    </td>
 
 
 
  </tr>
 
  
 
</table>
 
</table>
Line 90: Line 86:
 
</pre>
 
</pre>
 
<table border="1" cellpadding="15">
 
<table border="1" cellpadding="15">
  <caption>
+
<caption>
    <font color="Red"> "LIKE   TO   DO"   Plans. </font>
+
<font color="Red"> "LIKE TO DO" Plans. </font>
 
+
</caption>
  </caption>
+
<tr>
  <tr>
+
<td>
    <td>
+
<font color="Blue"> Plan </font>  
            <font color="Blue"> Plan </font>    
+
</td>
    </td>
+
<td>
    <td>
 
 
 
          <font color="Blue">Duration</font>   
 
    </td>
 
    <td>
 
            <font color="Blue"> Personnel</font>     
 
 
 
    </td>
 
  </tr>
 
 
 
  <tr>
 
    <td>
 
            Oversampling by 2 at 120 Hz   
 
    </td>
 
  
    <td>
+
<font color="Blue">Duration</font>  
          few days   
+
</td>
    </td>
+
<td>
    <td>
+
<font color="Blue"> Personnel</font>
            setup by experts   
 
  
    </td>
+
</td>
  </tr>
+
</tr>
  <tr>
+
    <td>
+
<tr>
            Q<sup>2</sup> with GEMs   
+
<td>
 +
Oversampling by 2 at 120 Hz
 +
</td>
  
    </td>
+
<td>
    <td>
+
few days
          6 hours   
+
</td>
    </td>
+
<td>
    <td>
+
setup by experts
        S. Riordan, A. Camsonne, K. Saenboonruang 
 
  
    </td>
+
</td>
  </tr>
+
</tr>
  <tr>
+
<tr>
    <td>
+
<td>
          Backgrounds:  Dipole Scan,  up and down 
+
Q<sup>2</sup> with GEMs
  
    </td>
+
</td>
    <td>
+
<td>
          6 hours    
+
6 hours  
    </td>
+
</td>
    <td>
+
<td>
            D. McNulty  
+
S. Riordan, A. Camsonne, K. Saenboonruang
 +
</td>
 +
</tr>
 +
<tr>
 +
<td>
 +
Backgrounds: Dipole Scan, up and down
 +
</td>
 +
<td>
 +
6 hours
 +
</td>
 +
<td>
 +
D. McNulty  
  
    </td>
+
</td>
  </tr>
+
</tr>
  <tr>
+
<tr>
    <td>
+
<td>
          Beam-Induced Linearity Studies  
+
Beam-Induced Linearity Studies  
    </td>
+
</td>
    <td>
+
<td>
          2 hours  
+
2 hours  
    </td>
+
</td>
    <td>
+
<td>
        K. Kumar, K. Paschke, R. Silwal  
+
K. Kumar, K. Paschke, R. Silwal  
    </td>
+
</td>
  
  </tr>
+
</tr>
  
 
</table>
 
</table>
Line 165: Line 158:
 
</pre>
 
</pre>
 
<table border="1" cellpadding="15">
 
<table border="1" cellpadding="15">
  <caption>
+
<caption>
    <font color="Red"> MAYBE   Plans. </font>   Rather low priority.
+
<font color="Red"> MAYBE Plans. </font> Rather low priority.
  </caption>
+
</caption>
  
  <tr>
+
<tr>
    <td>
+
<td>
            <font color="Blue"> Plan </font>    
+
<font color="Blue"> Plan </font>  
    </td>
+
</td>
    <td>
+
<td>
          <font color="Blue">Duration</font>    
+
<font color="Blue">Duration</font>  
  
    </td>
+
</td>
    <td>
+
<td>
            <font color="Blue"> Personnel</font>    
+
<font color="Blue"> Personnel</font>  
    </td>
+
</td>
  </tr>
+
</tr>
  
  <tr>
+
<tr>
    <td>
+
<td>
        Further 10 nA Cavity Monitor Tests   
+
Further 10 nA Cavity Monitor Tests  
    </td>
+
  </td>
    <td>
+
<td>
          4 hours   
+
4 hours  
    </td>
+
  </td>
    <td>
+
<td>
            Z. Ahmed, R. Michaels  
+
Z. Ahmed, R. Michaels  
    </td>
+
</td>
  </tr>
+
</tr>
  <tr>
+
<tr>
  
    <td>
+
<td>
              More Moller Commissioning  
+
More Moller Commissioning  
    </td>
+
</td>
    <td>
+
<td>
          12 hours
+
12 hours
    </td>
+
</td>
    <td>
+
<td>
          Moller crew   (note Sasha is leaving town)  
+
Moller crew (note Sasha is leaving town)  
    </td>
+
</td>
  </tr>
+
</tr>
  
 
</table>
 
</table>
Line 217: Line 210:
 
Hi Bob,
 
Hi Bob,
  
Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.
+
Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.
  
 
Most importantly give the PD some advance warning.
 
Most importantly give the PD some advance warning.
 
----
 
----

Revision as of 17:32, 11 June 2010

PREx TODO List:


The following tables show the auxiliary measurements for the remainder of PREx.
This will be discussed at the June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.

The plans belong to 3 categories of priority:

  • Plans we MUST perform.
  • Plans we'd LIKE to perform, but lower priority.
  • Plans we MAYBE want to do (very low priority).
"MUST DO" Plans
 Plan  
Duration 
 Personnel 
Blinded Tube Test 
4 hours (access) 
D. McNulty, K. Kumar, J. Wexler 
Further Current Calibrations with PREx Det 
2 hours 
Z. Ahmed 
Transverse Polarization Measurements.
8 hours 
Setup: J. Grames 
High Statistics Lead Inelastics 
3 hours 
R. Michaels 

"LIKE TO DO" Plans.
 Plan  
Duration 
 Personnel 
Oversampling by 2 at 120 Hz 
few days 
setup by experts 
Q2 with GEMs 
6 hours 
S. Riordan, A. Camsonne, K. Saenboonruang 
Backgrounds: Dipole Scan, up and down 
6 hours 
D. McNulty 
Beam-Induced Linearity Studies 
2 hours 
K. Kumar, K. Paschke, R. Silwal 

MAYBE Plans. Rather low priority.
 Plan  
Duration 
 Personnel 
Further 10 nA Cavity Monitor Tests 
4 hours 
Z. Ahmed, R. Michaels 
More Moller Commissioning 
12 hours
Moller crew (note Sasha is leaving town) 

Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".


Bob edited the above table per KK's request


By Joe Grames: Hi Bob,

Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.

Most importantly give the PD some advance warning.