Difference between revisions of "User talk:Jixie Zhang"
Jixie Zhang (talk | contribs) |
|||
Line 9: | Line 9: | ||
</p><ul> | </p><ul> | ||
− | <li> | + | <li> Plans we <font color="Red">MUST</font> perform. |
− | </li><li> | + | </li><li> Plans we'd <font color="Red">LIKE</font> to perform, but lower priority. |
− | </li><li> | + | </li><li> Plans we <font color="Red">MAYBE</font> want to do (very low priority). |
</li></ul> | </li></ul> | ||
<table border="1" cellpadding="15"> | <table border="1" cellpadding="15"> | ||
− | + | <caption> | |
− | + | <font color="Red"> "MUST DO" Plans</font> | |
− | + | </caption> | |
− | + | <tr> | |
− | + | <td> | |
− | + | <font color="Blue"> Plan </font> | |
− | + | </td> | |
− | + | <td> | |
− | + | <font color="Blue">Duration</font> | |
− | + | </td> | |
− | + | <td> | |
− | + | <font color="Blue"> Personnel</font> | |
− | + | </td> | |
− | + | </tr> | |
− | + | <tr> | |
+ | <td> | ||
+ | Blinded Tube Test | ||
+ | </td> | ||
+ | <td> | ||
+ | 4 hours (access) | ||
+ | </td> | ||
+ | <td> | ||
+ | D. McNulty, K. Kumar, J. Wexler | ||
+ | </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> | ||
− | + | Further Current Calibrations with PREx Det | |
− | + | </td> | |
− | + | <td> | |
− | + | 2 hours | |
− | + | </td> | |
− | + | <td> | |
− | + | Z. Ahmed | |
− | + | </td> | |
− | + | </tr> | |
− | |||
− | |||
− | |||
− | |||
− | + | <tr> | |
− | + | <td> | |
− | + | Transverse Polarization Measurements. | |
− | + | </td> | |
− | + | <td> | |
− | + | 8 hours | |
+ | </td> | ||
+ | <td> | ||
+ | Setup: J. Grames | ||
+ | </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> | ||
+ | High Statistics Lead Inelastics | ||
+ | </td> | ||
+ | <td> | ||
+ | 3 hours | ||
+ | </td> | ||
+ | <td> | ||
+ | R. Michaels | ||
+ | </td> | ||
− | + | </tr> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</table> | </table> | ||
Line 90: | Line 86: | ||
</pre> | </pre> | ||
<table border="1" cellpadding="15"> | <table border="1" cellpadding="15"> | ||
− | + | <caption> | |
− | + | <font color="Red"> "LIKE TO DO" Plans. </font> | |
− | + | </caption> | |
− | + | <tr> | |
− | + | <td> | |
− | + | <font color="Blue"> Plan </font> | |
− | + | </td> | |
− | + | <td> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | <font color="Blue">Duration</font> | |
− | + | </td> | |
− | + | <td> | |
− | + | <font color="Blue"> Personnel</font> | |
− | |||
− | + | </td> | |
− | + | </tr> | |
− | + | ||
− | + | <tr> | |
− | + | <td> | |
+ | Oversampling by 2 at 120 Hz | ||
+ | </td> | ||
− | + | <td> | |
− | + | few days | |
− | + | </td> | |
− | + | <td> | |
− | + | setup by experts | |
− | |||
− | + | </td> | |
− | + | </tr> | |
− | + | <tr> | |
− | + | <td> | |
− | + | Q<sup>2</sup> with GEMs | |
− | + | </td> | |
− | + | <td> | |
− | + | 6 hours | |
− | + | </td> | |
− | + | <td> | |
− | + | S. Riordan, A. Camsonne, K. Saenboonruang | |
+ | </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> | ||
+ | Backgrounds: Dipole Scan, up and down | ||
+ | </td> | ||
+ | <td> | ||
+ | 6 hours | ||
+ | </td> | ||
+ | <td> | ||
+ | D. McNulty | ||
− | + | </td> | |
− | + | </tr> | |
− | + | <tr> | |
− | + | <td> | |
− | + | Beam-Induced Linearity Studies | |
− | + | </td> | |
− | + | <td> | |
− | + | 2 hours | |
− | + | </td> | |
− | + | <td> | |
− | + | K. Kumar, K. Paschke, R. Silwal | |
− | + | </td> | |
− | + | </tr> | |
</table> | </table> | ||
Line 165: | Line 158: | ||
</pre> | </pre> | ||
<table border="1" cellpadding="15"> | <table border="1" cellpadding="15"> | ||
− | + | <caption> | |
− | + | <font color="Red"> MAYBE Plans. </font> Rather low priority. | |
− | + | </caption> | |
− | + | <tr> | |
− | + | <td> | |
− | + | <font color="Blue"> Plan </font> | |
− | + | </td> | |
− | + | <td> | |
− | + | <font color="Blue">Duration</font> | |
− | + | </td> | |
− | + | <td> | |
− | + | <font color="Blue"> Personnel</font> | |
− | + | </td> | |
− | + | </tr> | |
− | + | <tr> | |
− | + | <td> | |
− | + | Further 10 nA Cavity Monitor Tests | |
− | + | </td> | |
− | + | <td> | |
− | + | 4 hours | |
− | + | </td> | |
− | + | <td> | |
− | + | Z. Ahmed, R. Michaels | |
− | + | </td> | |
− | + | </tr> | |
− | + | <tr> | |
− | + | <td> | |
− | + | More Moller Commissioning | |
− | + | </td> | |
− | + | <td> | |
− | + | 12 hours | |
− | + | </td> | |
− | + | <td> | |
− | + | Moller crew (note Sasha is leaving town) | |
− | + | </td> | |
− | + | </tr> | |
</table> | </table> | ||
Line 217: | Line 210: | ||
Hi Bob, | Hi Bob, | ||
− | Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. | + | Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes. |
Most importantly give the PD some advance warning. | Most importantly give the PD some advance warning. | ||
---- | ---- |
Revision as of 17:32, 11 June 2010
PREx TODO List:
The following tables show the auxiliary measurements for the remainder of
PREx.
This will be discussed at the
June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.
The plans belong to 3 categories of priority:
- Plans we MUST perform.
- Plans we'd LIKE to perform, but lower priority.
- Plans we MAYBE want to do (very low priority).
Plan |
Duration |
Personnel |
Blinded Tube Test |
4 hours (access) |
D. McNulty, K. Kumar, J. Wexler |
Further Current Calibrations with PREx Det |
2 hours |
Z. Ahmed |
Transverse Polarization Measurements. |
8 hours |
Setup: J. Grames |
High Statistics Lead Inelastics |
3 hours |
R. Michaels |
Plan |
Duration |
Personnel |
Oversampling by 2 at 120 Hz |
few days |
setup by experts |
Q2 with GEMs |
6 hours |
S. Riordan, A. Camsonne, K. Saenboonruang |
Backgrounds: Dipole Scan, up and down |
6 hours |
D. McNulty |
Beam-Induced Linearity Studies |
2 hours |
K. Kumar, K. Paschke, R. Silwal |
Plan |
Duration |
Personnel |
Further 10 nA Cavity Monitor Tests |
4 hours |
Z. Ahmed, R. Michaels |
More Moller Commissioning |
12 hours |
Moller crew (note Sasha is leaving town) |
Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".
Bob edited the above table per KK's request
By Joe Grames: Hi Bob,
Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.
Most importantly give the PD some advance warning.