Difference between revisions of "User talk:Jixie Zhang"
Jixie Zhang (talk | contribs) |
Jixie Zhang (talk | contribs) |
||
Line 7: | Line 7: | ||
<p> | <p> | ||
The plans belong to 3 categories of priority: | The plans belong to 3 categories of priority: | ||
+ | </p> | ||
− | + | <ul> | |
<li> Plans we <font color="Red">MUST</font> perform. | <li> Plans we <font color="Red">MUST</font> perform. | ||
</li><li> Plans we'd <font color="Red">LIKE</font> to perform, but lower priority. | </li><li> Plans we'd <font color="Red">LIKE</font> to perform, but lower priority. | ||
</li><li> Plans we <font color="Red">MAYBE</font> want to do (very low priority). | </li><li> Plans we <font color="Red">MAYBE</font> want to do (very low priority). | ||
− | + | </ul> | |
− | |||
<table border="1" cellpadding="15"> | <table border="1" cellpadding="15"> | ||
− | + | <caption><font color="Red"> "MUST DO" Plans</font></caption> | |
− | |||
− | |||
− | + | <tr> | |
− | + | <td><font color="Blue"> Plan </font></td> | |
− | + | <td><font color="Blue">Duration</font></td> | |
− | + | <td><font color="Blue"> Personnel</font></td> | |
− | + | </tr> | |
− | |||
− | + | <tr> | |
− | <td> | + | <td>Blinded Tube Test</td> |
− | + | <td>4 hours (access)</td> | |
− | + | <td> D. McNulty, K. Kumar, J. Wexler</td> | |
− | + | </tr> | |
+ | |||
+ | <tr> | ||
+ | <td> Further Current Calibrations with PREx Det</td> | ||
+ | <td> 2 hours</td> | ||
+ | <td> Z. Ahmed</td> | ||
+ | </tr> | ||
− | + | <tr> | |
− | + | <td>Transverse Polarization Measurements.</td> | |
− | + | <td>8 hours </td> | |
− | + | <td>Setup: J. Grames </td> | |
− | + | </tr> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | <tr> | |
− | + | <td>High Statistics Lead Inelastics </td> | |
− | + | <td>3 hours </td> | |
− | + | <td>R. Michaels </td> | |
− | + | </tr> | |
− | + | </table> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<table border="1" cellpadding="15"> | <table border="1" cellpadding="15"> | ||
− | + | <caption> <font color="Red"> "LIKE TO DO" Plans. </font> </caption> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | <tr> | |
− | + | <td><font color="Blue"> Plan </font> </td> | |
+ | <td><font color="Blue">Duration</font> </td> | ||
+ | <td><font color="Blue"> Personnel</font> </td> | ||
+ | </tr> | ||
− | + | <tr> | |
− | + | <td>Oversampling by 2 at 120 Hz </td> | |
− | + | <td>few days </td> | |
− | + | <td>setup by experts </td> | |
+ | </tr> | ||
− | + | <tr> | |
− | + | <td>Q<sup>2</sup> with GEMs </td> | |
− | + | <td>6 hours </td> | |
− | + | <td>S. Riordan, A. Camsonne, K. Saenboonruang </td> | |
− | + | </tr> | |
− | + | <tr> | |
− | + | <td>Backgrounds: Dipole Scan, up and down </td> | |
− | + | <td>6 hours </td> | |
− | + | <td>D. McNulty </td> | |
− | + | </tr> | |
− | + | <tr> | |
− | + | <td>Beam-Induced Linearity Studies </td> | |
− | + | <td>2 hours </td> | |
− | + | <td>K. Kumar, K. Paschke, R. Silwal </td> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | </tr> | |
− | + | </table> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<table border="1" cellpadding="15"> | <table border="1" cellpadding="15"> | ||
− | + | <caption> <font color="Red"> MAYBE Plans. </font> Rather low priority.</caption> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | <tr> | |
− | + | <td><font color="Blue"> Plan </font> </td> | |
− | + | <td><font color="Blue">Duration</font> </td> | |
− | + | <td><font color="Blue"> Personnel</font> </td> | |
− | + | </tr> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | <tr> | |
− | + | <td>Further 10 nA Cavity Monitor Tests </td> | |
− | + | <td>4 hours </td> | |
− | + | <td>Z. Ahmed, R. Michaels </td> | |
− | + | </tr> | |
− | |||
− | |||
− | |||
− | |||
− | |||
+ | <tr> | ||
+ | <td>More Moller Commissioning </td> | ||
+ | <td>12 hours</td> | ||
+ | <td>Moller crew (note Sasha is leaving town) </td> | ||
+ | </tr> | ||
</table> | </table> | ||
Revision as of 09:26, 12 June 2010
PREx TODO List:
The following tables show the auxiliary measurements for the remainder of
PREx.
This will be discussed at the
June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.
The plans belong to 3 categories of priority:
- Plans we MUST perform.
- Plans we'd LIKE to perform, but lower priority.
- Plans we MAYBE want to do (very low priority).
Plan | Duration | Personnel |
Blinded Tube Test | 4 hours (access) | D. McNulty, K. Kumar, J. Wexler |
Further Current Calibrations with PREx Det | 2 hours | Z. Ahmed |
Transverse Polarization Measurements. | 8 hours | Setup: J. Grames |
High Statistics Lead Inelastics | 3 hours | R. Michaels |
Plan | Duration | Personnel |
Oversampling by 2 at 120 Hz | few days | setup by experts |
Q2 with GEMs | 6 hours | S. Riordan, A. Camsonne, K. Saenboonruang |
Backgrounds: Dipole Scan, up and down | 6 hours | D. McNulty |
Beam-Induced Linearity Studies | 2 hours | K. Kumar, K. Paschke, R. Silwal |
Plan | Duration | Personnel |
Further 10 nA Cavity Monitor Tests | 4 hours | Z. Ahmed, R. Michaels |
More Moller Commissioning | 12 hours | Moller crew (note Sasha is leaving town) |
Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".
Bob edited the above table per KK's request
By Joe Grames: Hi Bob,
Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.
Most importantly give the PD some advance warning.