Difference between revisions of "User talk:Jixie Zhang"

From PREX Wiki
Jump to navigationJump to search
Line 20: Line 20:
 
<tr>
 
<tr>
 
<td><font color="Blue"> Plan </font></td>
 
<td><font color="Blue"> Plan </font></td>
<td><font color="Blue">Duration</font></td>
+
<td><font color="Blue">Duration|Status</font></td>
 
<td><font color="Blue"> Personnel</font></td>
 
<td><font color="Blue"> Personnel</font></td>
 
</tr>
 
</tr>
Line 38: Line 38:
 
<tr>
 
<tr>
 
<td>Transverse Polarization Measurements.</td>
 
<td>Transverse Polarization Measurements.</td>
<td>8 hours </td>
+
<td>8 hours, <br>started from 11:00AM, June 12 </td>
<td>Setup: J. Grames </td>
+
<td>Setup by J. Grames. Performed by M. Dalton, Mindy </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>High Statistics Lead Inelastics </td>
 
<td>High Statistics Lead Inelastics </td>
<td>3 hours </td>
+
<td> <b><font color="green"> done </font></b></td>
<td>R. Michaels </td>
+
<td>A. Camsonne </td>
 
</tr>
 
</tr>
 
</table>
 
</table>
Line 55: Line 55:
 
<tr>
 
<tr>
 
<td><font color="Blue"> Plan </font> </td>
 
<td><font color="Blue"> Plan </font> </td>
<td><font color="Blue">Duration</font> </td>
+
<td><font color="Blue">Duration|Status</font> </td>
 
<td><font color="Blue"> Personnel</font> </td>
 
<td><font color="Blue"> Personnel</font> </td>
 
</tr>
 
</tr>
Line 67: Line 67:
 
<tr>
 
<tr>
 
<td>Q<sup>2</sup> with GEMs </td>
 
<td>Q<sup>2</sup> with GEMs </td>
<td>6 hours </td>
+
<td> <b><font color="green"> done </font></b></td>
<td>S. Riordan, A. Camsonne, K. Saenboonruang </td>
+
<td> A. Camsonne, M.Friends </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Backgrounds: Dipole Scan, up and down </td>
 
<td>Backgrounds: Dipole Scan, up and down </td>
<td>6 hours </td>
+
<td>6 hours, <b><font color="green"> Finish left arm,<br> right arm measurement is pending </font></b> </td>
<td>D. McNulty </td>
+
<td>M. Dalton, Mindy</td>
 
</tr>
 
</tr>
  
Line 91: Line 91:
 
<tr>
 
<tr>
 
<td><font color="Blue"> Plan </font> </td>
 
<td><font color="Blue"> Plan </font> </td>
<td><font color="Blue">Duration</font> </td>
+
<td><font color="Blue">Duration|Status</font> </td>
 
<td><font color="Blue"> Personnel</font> </td>
 
<td><font color="Blue"> Personnel</font> </td>
 
</tr>
 
</tr>

Revision as of 12:07, 12 June 2010

PREx TODO List:


The following tables show the auxiliary measurements for the remainder of PREx.
This will be discussed at the June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.

The plans belong to 3 categories of priority:

  • Plans we MUST perform.
  • Plans we'd LIKE to perform, but lower priority.
  • Plans we MAYBE want to do (very low priority).
"MUST DO" Plans
Plan Duration|Status Personnel
Blinded Tube Test 4 hours (access) D. McNulty, K. Kumar, J. Wexler
Further Current Calibrations with PREx Det 2 hours Z. Ahmed
Transverse Polarization Measurements. 8 hours,
started from 11:00AM, June 12
Setup by J. Grames. Performed by M. Dalton, Mindy
High Statistics Lead Inelastics done A. Camsonne


"LIKE TO DO" Plans.
Plan Duration|Status Personnel
Oversampling by 2 at 120 Hz few days setup by experts
Q2 with GEMs done A. Camsonne, M.Friends
Backgrounds: Dipole Scan, up and down 6 hours, Finish left arm,
right arm measurement is pending
M. Dalton, Mindy
Beam-Induced Linearity Studies 2 hours K. Kumar, K. Paschke, R. Silwal


MAYBE Plans. Rather low priority.
Plan Duration|Status Personnel
Further 10 nA Cavity Monitor Tests 4 hours Z. Ahmed, R. Michaels
More Moller Commissioning 12 hours Moller crew (note Sasha is leaving town)

Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".


Bob edited the above table per KK's request


By Joe Grames: Hi Bob,

Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.

Most importantly give the PD some advance warning.