Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 39: | Line 39: | ||
| | | | ||
|- | |- | ||
− | |||
| rowspan="3" | Wednesday, July 18 | | rowspan="3" | Wednesday, July 18 | ||
|Owl | |Owl | ||
Line 45: | Line 44: | ||
| | | | ||
|- | |- | ||
− | |||
| Day | | Day | ||
| 50 microAmp production, PQB study, FFB test | | 50 microAmp production, PQB study, FFB test | ||
| full survey to solve the RHRS Q2, Moller DAQ, BCM? | | full survey to solve the RHRS Q2, Moller DAQ, BCM? | ||
+ | |- | ||
+ | | Swing | ||
+ | |Moller measurement | ||
+ | | | ||
+ | |- | ||
+ | |-style="background: #FCF3CF; | ||
+ | | rowspan="3" | Wednesday, July 19 | ||
+ | |Owl | ||
+ | |Moller measurement | ||
+ | | | ||
+ | |- | ||
+ | |-style="background: #FCF3CF; | ||
+ | | Day | ||
+ | |control access for the RHRS Q2 magnet trips | ||
+ | | ongoing | ||
|- | |- | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Swing | | Swing | ||
− | | | + | | |
| | | | ||
|- | |- |
Revision as of 10:28, 19 July 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Tuesday, July 16 | Owl | MOLLER Polarimeter and FFB commissioning | |
Day | production after pass change | ||
Swing | change IHWP ('out'), BPM and BCM calibration (Caryn) | Done | |
Wednesday, July 17 | Owl | Production with 50uA with Aq, BMW and Energy-mode:'RF-off' | |
Day | HallB tuning no beam and frame hunting I | ||
Swing | frame hunting II, current scan, Detector and SAM calibration and 70uA production with 12x7.2 raster | ||
Wednesday, July 18 | Owl | IA, PITA scan, 50uA production with with Aq (HallA and C), BMW and FFB off | |
Day | 50 microAmp production, PQB study, FFB test | full survey to solve the RHRS Q2, Moller DAQ, BCM? | |
Swing | Moller measurement | ||
Wednesday, July 19 | Owl | Moller measurement | |
Day | control access for the RHRS Q2 magnet trips | ongoing | |
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting