Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 29: Line 29:
 
| rowspan="3" | Saturday, July 20
 
| rowspan="3" | Saturday, July 20
 
|Owl
 
|Owl
|Moller measurement
+
|production run at 50uA
|ready for the spin dance, may need short measurement to be complete.
+
|RHRS Q2 magnet is down
 
|-
 
|-
 
| Day
 
| Day
|control access for the RHRS Q2 magnet tripping
+
|control access for Q2 debugging
|  
+
|beam stop at 8:30am and back at 4:00pm
 
|-
 
|-
 
| Swing
 
| Swing
|Bandwidth, BCM, FFB,  Left arm only production at 50uA
+
|PTIA/IA scan
 
|
 
|
 
|-
 
|-
Line 44: Line 44:
 
| rowspan="3" | Sunday, July 21
 
| rowspan="3" | Sunday, July 21
 
|Owl
 
|Owl
|Moller measurement
+
|production run at 50uA
|ready for the spin dance, may need short measurement to be complete.
+
|RHRS Q2 magnet is down
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
 
| Day
 
| Day
|control access for the RHRS Q2 magnet tripping
+
|production run at 50uA
|
+
| RHRS Q2 magnet is down
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
 
| Swing
 
| Swing
|Bandwidth, BCM, FFB,  Left arm only production at 50uA
+
|  
 
|
 
|
 
|-
 
|-

Revision as of 08:47, 21 July 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Friday, July 19 Owl Moller measurement ready for the spin dance, may need short measurement to be complete.
Day control access for the RHRS Q2 magnet tripping
Swing Bandwidth, BCM, FFB, Left arm only production at 50uA
Saturday, July 20 Owl production run at 50uA RHRS Q2 magnet is down
Day control access for Q2 debugging beam stop at 8:30am and back at 4:00pm
Swing PTIA/IA scan
Sunday, July 21 Owl production run at 50uA RHRS Q2 magnet is down
Day production run at 50uA RHRS Q2 magnet is down
Swing

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting