Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 41: Line 41:
 
|-
 
|-
 
|-
 
|-
| rowspan="3" | Saturday, July 20
+
| rowspan="3" | Sunday, July 21
 
|Owl
 
|Owl
 
|production at 50uA
 
|production at 50uA
|RHRS Q2 magnet is down
+
|RHRS Q2 magnet is down  
 
|-
 
|-
 
| Day
 
| Day
|control access for Q2 debugging
+
|production at 50uA
|beam stop at 8:00am and back at 4:00pm
+
| RHRS Q2 magnet is down
 
|-
 
|-
 
| Swing
 
| Swing
|PITA/IA scan at 50uA, production at 50uA
+
| Qsqr measurement and production at 50uA
|
+
| RHRS Q2 magnet is down
 
|-
 
|-
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
| rowspan="3" | Sunday, July 21
+
| rowspan="3" | Sunday, July 22
 
|Owl
 
|Owl
|production at 50uA
+
|production at 50uA, Moller measurement was paused 
|RHRS Q2 magnet is down
+
|LCW leak in the west arc
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
 
| Day
 
| Day
|production at 50uA
+
|control access for Q2 magnet, change quartz at LHRS and put LHRS S0 back with counting mode 
| RHRS Q2 magnet is down
+
|LCW leak >10 hours
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
 
| Swing
 
| Swing
| Qsqr measurement and production at 50uA
+
|  
| RHRS Q2 magnet is down
+
|  
 
|-
 
|-
 
|}
 
|}

Revision as of 14:04, 22 July 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Friday, July 19 Owl Moller measurement ready for the spin dance, may need short measurement to be complete.
Day control access for the RHRS Q2 magnet tripping
Swing Bandwidth, BCM, FFB, Left arm only production at 50uA
Saturday, July 20 Owl production at 50uA RHRS Q2 magnet is down
Day control access for Q2 debugging beam stop at 8:00am and back at 4:00pm
Swing PITA/IA scan at 50uA, production at 50uA
Sunday, July 21 Owl production at 50uA RHRS Q2 magnet is down
Day production at 50uA RHRS Q2 magnet is down
Swing Qsqr measurement and production at 50uA RHRS Q2 magnet is down
Sunday, July 22 Owl production at 50uA, Moller measurement was paused LCW leak in the west arc
Day control access for Q2 magnet, change quartz at LHRS and put LHRS S0 back with counting mode LCW leak >10 hours
Swing

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting