Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 41: | Line 41: | ||
|- | |- | ||
|- | |- | ||
− | | rowspan="3" | | + | | rowspan="3" | Sunday, July 21 |
|Owl | |Owl | ||
|production at 50uA | |production at 50uA | ||
− | |RHRS Q2 magnet is down | + | |RHRS Q2 magnet is down |
|- | |- | ||
| Day | | Day | ||
− | | | + | |production at 50uA |
− | | | + | | RHRS Q2 magnet is down |
|- | |- | ||
| Swing | | Swing | ||
− | | | + | | Qsqr measurement and production at 50uA |
− | | | + | | RHRS Q2 magnet is down |
|- | |- | ||
|- | |- | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
− | | rowspan="3" | Sunday, July | + | | rowspan="3" | Sunday, July 22 |
|Owl | |Owl | ||
− | |production at 50uA | + | |production at 50uA, Moller measurement was paused |
− | | | + | |LCW leak in the west arc |
|- | |- | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Day | | Day | ||
− | | | + | |control access for Q2 magnet, change quartz at LHRS and put LHRS S0 back with counting mode |
− | | | + | |LCW leak >10 hours |
|- | |- | ||
|-style="background: #FCF3CF; | |-style="background: #FCF3CF; | ||
| Swing | | Swing | ||
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} |
Revision as of 14:04, 22 July 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Friday, July 19 | Owl | Moller measurement | ready for the spin dance, may need short measurement to be complete. |
Day | control access for the RHRS Q2 magnet tripping | ||
Swing | Bandwidth, BCM, FFB, Left arm only production at 50uA | ||
Saturday, July 20 | Owl | production at 50uA | RHRS Q2 magnet is down |
Day | control access for Q2 debugging | beam stop at 8:00am and back at 4:00pm | |
Swing | PITA/IA scan at 50uA, production at 50uA | ||
Sunday, July 21 | Owl | production at 50uA | RHRS Q2 magnet is down |
Day | production at 50uA | RHRS Q2 magnet is down | |
Swing | Qsqr measurement and production at 50uA | RHRS Q2 magnet is down | |
Sunday, July 22 | Owl | production at 50uA, Moller measurement was paused | LCW leak in the west arc |
Day | control access for Q2 magnet, change quartz at LHRS and put LHRS S0 back with counting mode | LCW leak >10 hours | |
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting