Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 25: Line 25:
 
| Qsqr measurement and production at 50uA
 
| Qsqr measurement and production at 50uA
 
| RHRS Q2 magnet is down
 
| RHRS Q2 magnet is down
 +
|-
 +
|-
 +
| rowspan="3" | Monday, July 22
 +
|Owl
 +
|production at 50uA, Moller measurement was paused 
 +
|LCW leak in the west arc
 +
|-
 +
| Day
 +
|control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode 
 +
|LCW leak >10 hours
 +
|-
 +
| Swing
 +
| Qsq measurement, Detector alignment at low current. 
 +
|1 hour
 
|-
 
|-
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
| rowspan="3" | Monday, July 22
+
| rowspan="3" | Tuesday, July 23
 
|Owl
 
|Owl
 
|production at 50uA, Moller measurement was paused   
 
|production at 50uA, Moller measurement was paused   

Revision as of 14:44, 23 July 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Sunday, July 21 Owl production at 50uA RHRS Q2 magnet is down
Day production at 50uA RHRS Q2 magnet is down
Swing Qsqr measurement and production at 50uA RHRS Q2 magnet is down
Monday, July 22 Owl production at 50uA, Moller measurement was paused LCW leak in the west arc
Day control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode LCW leak >10 hours
Swing Qsq measurement, Detector alignment at low current. 1 hour
Tuesday, July 23 Owl production at 50uA, Moller measurement was paused LCW leak in the west arc
Day control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode LCW leak >10 hours
Swing Qsq measurement, Detector alignment at low current. 1 hour

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting