Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 1: | Line 1: | ||
− | + | ||
<br><br> | <br><br> | ||
[[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br> | [[Main_Page|<B>PREX Main</B>]] << [[Run Coordinator Tools]] <br><br> | ||
Line 59: | Line 59: | ||
|} | |} | ||
− | [[Run plan history | Previous Daily Run Plans]] | + | [[Run plan history | <B>Previous Daily Run Plans</B>]] |
== Instructions for RC == | == Instructions for RC == |
Revision as of 15:38, 23 July 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Sunday, July 21 | Owl | production at 50uA | RHRS Q2 magnet is down |
Day | production at 50uA | RHRS Q2 magnet is down | |
Swing | Qsqr measurement and production at 50uA | RHRS Q2 magnet is down | |
Monday, July 22 | Owl | production at 50uA, Moller measurement was paused | LCW leak in the west arc |
Day | control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode | LCW leak >10 hours | |
Swing | Qsq measurement, Detector alignment at low current. | 1 hour | |
Tuesday, July 23 | Owl | No beam due to LCW leak | >30h |
Day | control access for Q2 magnet, Compton laser work | Q2 is recovered around 12:00pm | |
Swing | Qsq measurement, Detector alignment at low current, and current scan, PITA scan, SAM HV adjustment, and production at 70uA |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting