Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 39: Line 39:
 
| Qsq measurement, Detector alignment at low current.   
 
| Qsq measurement, Detector alignment at low current.   
 
|1 hour  
 
|1 hour  
 +
|-
 +
|-
 +
| rowspan="3" | Tuesday, July 23
 +
|Owl
 +
|No beam due to LCW leak 
 +
|>30h
 +
|-
 +
| Day
 +
|control access for Q2 magnet, Compton laser work 
 +
|Q2 is recovered around 12:00pm
 +
|-
 +
| Swing
 +
| Qsq measurement, Detector alignment at low current, and current scan, PITA scan, SAM HV adjustment, and production at 70uA 
 +
|
 
|-
 
|-
 
|-
 
|-
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
| rowspan="3" | Tuesday, July 23
+
| rowspan="3" | Wednesday, July 24
 
|Owl
 
|Owl
 
|No beam due to LCW leak   
 
|No beam due to LCW leak   

Revision as of 14:53, 24 July 2019



PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Sunday, July 21 Owl production at 50uA RHRS Q2 magnet is down
Day production at 50uA RHRS Q2 magnet is down
Swing Qsqr measurement and production at 50uA RHRS Q2 magnet is down
Monday, July 22 Owl production at 50uA, Moller measurement was paused LCW leak in the west arc
Day control access for Q2 magnet, change quartz at LHRS and put both HRS S0 back with counting mode LCW leak >10 hours
Swing Qsq measurement, Detector alignment at low current. 1 hour
Tuesday, July 23 Owl No beam due to LCW leak >30h
Day control access for Q2 magnet, Compton laser work Q2 is recovered around 12:00pm
Swing Qsq measurement, Detector alignment at low current, and current scan, PITA scan, SAM HV adjustment, and production at 70uA
Wednesday, July 24 Owl No beam due to LCW leak >30h
Day control access for Q2 magnet, Compton laser work Q2 is recovered around 12:00pm
Swing Qsq measurement, Detector alignment at low current, and current scan, PITA scan, SAM HV adjustment, and production at 70uA

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting