Difference between revisions of "WAC Notes July 25 2019"

From PREX Wiki
Jump to navigationJump to search
Line 30: Line 30:
 
== Issues ==
 
== Issues ==
  
* There were many pedestal and event cut problems. From now on, when an event cut isn't absolutely necessary it should be removed.
+
* There were many pedestal and event cut problems. From now on, when an event cut isn't absolutely necessary it should be removed - see japan source code for reference of cuts [https://github.com/JeffersonLab/japan/blob/develop/Analysis/include/QwTypes.h#L165 here]
 
* The BCM appears to be falling apart. We are fixing it and running slug 12 on BCM DG DS in the meantime.
 
* The BCM appears to be falling apart. We are fixing it and running slug 12 on BCM DG DS in the meantime.
 
* BPM 4ec had intermittant problems (iocse10 has issues) and so we are regressing with 4e again. BPM 11X is ok and stays in regression.
 
* BPM 4ec had intermittant problems (iocse10 has issues) and so we are regressing with 4e again. BPM 11X is ok and stays in regression.

Revision as of 12:33, 25 July 2019

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes July 24 2019 << >> WAC Notes July 26 2019

July 25 2019

Production Run List

Start Slug 12, IHWP In, FFB on always, no RHRS

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • There were many pedestal and event cut problems. From now on, when an event cut isn't absolutely necessary it should be removed - see japan source code for reference of cuts here
  • The BCM appears to be falling apart. We are fixing it and running slug 12 on BCM DG DS in the meantime.
  • BPM 4ec had intermittant problems (iocse10 has issues) and so we are regressing with 4e again. BPM 11X is ok and stays in regression.

Other Status Updates