Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 50: Line 50:
 
|  
 
|  
 
|-
 
|-
 +
| rowspan="3" | Thursday, August 1
 +
|Owl
 +
|
 +
|
 +
|-
 +
| Day
 +
|
 +
|
 +
|-
 +
| Swing
 +
|
 +
|
 
|}
 
|}
  

Revision as of 10:58, 31 July 2019



PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Tuesday, July 30 Owl low current running beginning at 8am (if approved)
Day Target fix
Swing
  • Tests with no target
  1. collimator centering angles with tune beam
  2. BCM calibrations
  3. BPM calibrations
  4. position feedback study
Wednesday, July 31 Owl production at 70uA
Day
  1. HRS quad repairs
  2. target repairs
  3. Compton work
  4. BCM repair
  5. Detector alignment (low current)
  6. production at 70uA
Swing production at 70uA
Thursday, August 1 Owl
Day
Swing

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting